Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Practice to Reduce Ground Displacement in Deep Mixing WorkBy Kozo Takeda, Arashi Shimano
"Dry Jet Mixing (DJM) technique is widely known as soil mitigation technique with small ground displacement during installation comparing with other techniques. Some projects involving sensitive struc
Jan 1, 2015
-
I-880 Replacement Project (Cypress Freeway) Large Diameter Driven Pipe Pile Foundations Test Program And Construction - Implementation Of Test Results - ImplementationBy Darrell L. Beddard
The test program information provided for some immediate changes on the upcoming contracts and in contract administration for the I-880 Replacement Project. Plan sheet modifications included changes t
Jan 1, 1996
-
Analysis And Design Of A Piled Foundation For A Tall Tower ? SynopsisBy I. K. Ozaydin
Analysis of piles groups loaded with large bending moments and both vertical and batter piles can be best performed by matrix analysis. In this paper, a case history about a tall marine control tower
Jan 1, 2010
-
Case Study: Design, Installation And Quality Assurance Testing Of High Capacity Socketed Piles In A Complex Geologic EnvironmentBy Thomas M. Caruso
Construction of a new ship dock at a major Philadelphia area refinery required geotechnical design and field consultation. The new dock, which consists of a system of mooring dolphins and platforms,
Jan 1, 2008
-
Piling In Coal Measures At The City Of Manchester Stadium For The Commonwealth Games 2002By Colin Curtis
The City of Manchester is hosting the 2002 Commonwealth Games. A world class Stadium with a 38,000 capacity was commissioned for a site located close to the City Centre. The Stadium location is in an
Jan 1, 2002
-
Studies On Pile Driving Cushion Materials ? SynopsisBy H. R. Shen
Cushion materials are one of the most important links in an efficient piling system. In the past, little has been done in China on this problem, so engineers are still used to those traditional woods,
Jan 1, 2010
-
Investigation Of Bearing Behavior Of Pile Raft Foundation Using Numerical ModelingBy A. Ghorbani
The analysis of Combined Pile Raft Foundation (CPRF) is very complex due to involved interactions among components of CPRF system. Many researchers made efforts to develop sufficient methods including
Jan 1, 2007
-
Helical Piles With Grouted Shafts - A Case HistoryBy Shawn Downey
A helical pile with in-situ grouted shaft was used to underpin the existing slab of a large retail store in the Edmonton, Alberta Canada area. The existing structural slab did not have the capacity to
Jan 1, 2003
-
Axial Pile Response Evaluation By Geophysical Piezocone TestsBy Paul W. Mayne
The axial load-displacement-capacity and load-transfer response of deep foundations can be conveniently assessed by geophysical piezocone tests that provide four independent readings with depth, inclu
Jan 1, 2002
-
Surprises And Solutions When Driving Piles In Mountain Valleys Of VermontBy John E. Lens
Driving bridge foundation piles into glacio-fluvial sands and gravels and glacial tills brought surprisingly longer than predicted driving lengths on several recent projects in Vermont. In some insta
Jan 1, 2007
-
Resonance Pile Driving with Zero Ground VibrationBy Mark Johnson, Mathew Janes
"The Resonator RD 260 Resonant Pile Driver delivers ground disturbance free, high production pile driving. The Resonator has recently been used on numerous production pile driving sites in the Netherl
Jan 1, 1900
-
Augered Pressure Grouted Piles In Complex Glacial Soils - A Case Study - 1. IntroductionBy Peter J. Jancich
This paper describes the installation of high capacity Augered Pressure Grouted piles which support structural loading from a four level parking garage in west-central DuPage County, Illinois. The sub
Jan 1, 1991
-
High Strain Testing Of Large Diameter, High Capacity Unlined Bored Piles ? IntroductionBy Dhanvin B. Mehta
Pile testing is generally understood as static load test. It is our common experience that for high capacity, large diameter bored piles, static testing is expensive and time consuming. It is practica
Jan 1, 1996
-
Non-Destructive Testing Of Piles - A Case History - SummaryBy Manish Kumar
One of the recent advances in the field of testing of concrete piles is the Non-Destructive testing (NDT) of piles. This paper deals with a specific project where this technique was employed along wit
Jan 1, 1996
-
Shoring Up D.C.'s Historical Foundations: Collection 14By Alan Quiroga
Nestled between Meridian Park and Howard University in the heart of Washington, D.C., the historic block between 14th, V and W streets North- west featured several original struc- tures, many of them
Aug 1, 2023
-
Performance Of Toe-Grouted Large Bored Pile In Sand-Gravel Formation Of Chiang Mai City, Northern ThailandBy Narong Thasnanipan
Performance of diameter 1.5 m toe-grouted bored pile founded at depth 44 m in sand-gravel formation of Chiang Mai City is presented in this paper. Toe grouting was applied by using tube-a-manchette me
Jan 1, 2002
-
The Theory Of The Expansion Of Cavities Applied To Pile Installation ? SynopsisBy D. A. Ponniah
The installation of a pile is considered analogous to the expansion of a cylindrical cavity of a diameter equal to that of the pile. Using Vesic's theory of the expansion of cavities the effect o
Jan 1, 1987
-
Methods Of Dewatering And Ground Water Control ? SynopsisBy J. P. Powers
Methods for dewatering and the control of ground water for construction and mining are discussed, including open pumping; predrainage with deep wells, wellpoints or other systems; cutoff or exclusion
Jan 1, 2010
-
Professional Responsibilities In Sub-Surface Investigations For Foundations. - IntroductionBy D. J. Ketkar
It is a frequent experience to find that the Sub-surface Investigation (S.I.) data is either inadequate or misleading. However, such cases are rarely reported. Nonetheless, the projects suffer on-acco
Jan 1, 1996
-
Practice Of Arranging Drilling Piles In Subsiding GroundsBy Vladimir M. Korolev
The field studies conducted at the experimental-production sites allowed to develop the technology of arranging drilling piles in loess subsiding grounds over 25 m deep and over 250 mm in diameter, to
Jan 1, 2002