I-880 Replacement Project (Cypress Freeway) Large Diameter Driven Pipe Pile Foundations Test Program And Construction - Implementation Of Test Results - Implementation

- Organization:
- Deep Foundations Institute
- Pages:
- 18
- File Size:
- 1265 KB
- Publication Date:
- Jan 1, 1996
Abstract
The test program information provided for some immediate changes on the upcoming contracts and in contract administration for the I-880 Replacement Project. Plan sheet modifications included changes to the pile data tables showing the actual demand load required for structural stability. The normal class of pile with a minimum load carrying capacity was removed. This provided for substantial pile length reduction at several locations since the structural loading was much less than the predetermined pile class ultimate capacity. New specifications were developed and standard specifications were modified to accommodate the newer foundations, installation procedures and pile acceptance criteria. Current Caltrans specifications require that the Contractor provide bearing capacity at the specified tip elevation. This requirement was removed and pile acceptance was determined by the Engineer. Acceptance criteria was established by the State and was based on. set-up trend over time. Static loading tests were reduced especially in areas where testing was performed on the indicator program. Testing procedures were modified and set-up periods were established before piles could be tested. For the contract near the San Francisco Oakland Bay Bridge (Unit E) the FHWA 1000 tons (8.9 MN) test beam configuration was completely changed. This provided added safety and allowed more tolerance in the pile placement for the testing operations. Indicator piles were added as companion piles to the static loading test piles. These piles were used for restrike events which included collecting dynamic data for calibrating the wave equation analysis with static load test results. Indicator piles also provided quick access for restrike events, where as, the static loading test pile needed modification to perform the restrike operation. Penetration rates were recorded for these operations. Wave equation Analysis Program (WEAP) was used in developing the acceptance criteria. The standard Engineering News Record (ENR) formula in the current Caltrans' Standard Specifications was removed for the contracts. Contractors were required to submit, prior to driving piles, a driveability study for their contract. These studies required discussion of their operations, method of installation, effects of soil set-up, set periods, hammer settings, bearing graphs, inputs to the WEAP program and complete a "Pile and Driving Equipment Data" form. Dynamic monitoring was detailed in the specifications on how the monitoring process was to occur. Set periods were established and restrike events were called out with the frequency of these events.
Citation
APA:
(1996) I-880 Replacement Project (Cypress Freeway) Large Diameter Driven Pipe Pile Foundations Test Program And Construction - Implementation Of Test Results - ImplementationMLA: I-880 Replacement Project (Cypress Freeway) Large Diameter Driven Pipe Pile Foundations Test Program And Construction - Implementation Of Test Results - Implementation. Deep Foundations Institute, 1996.