Analysis And Design Of A Piled Foundation For A Tall Tower ? Synopsis

- Organization:
- Deep Foundations Institute
- Pages:
- 4
- File Size:
- 434 KB
- Publication Date:
- Jan 1, 2010
Abstract
Analysis of piles groups loaded with large bending moments and both vertical and batter piles can be best performed by matrix analysis. In this paper, a case history about a tall marine control tower is presented. The soil conditions at the site and the results of the computer analysis of the piled foundation are summarized. It is shown that the pile loads are indeed less than the allowable load for a single pile. Pile head loads and moments are used in the analysis of the raft foundation.
Citation
APA:
(2010) Analysis And Design Of A Piled Foundation For A Tall Tower ? SynopsisMLA: Analysis And Design Of A Piled Foundation For A Tall Tower ? Synopsis. Deep Foundations Institute, 2010.