Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Design and Field Testing of a Mobile Roof Support for Retreat Mining,

    By Robert R. Thompson

    Retreat pillar mining is highly productive but dangerous. The primary danger during pillar removal is premature caving of the roof. Because the safety of the miners is dependent on successfully contro

    Jan 1, 1986

  • SME-ICGCM
    An Underground Trial Of Cable Slings For Remedial Support Of Longwall Gateroads

    By William D. Gallant

    This paper describes a joint cooperative project between the CANMET Cape Breton Coal Research Laboratory and the Cape Breton Development Corporation to conduct a trial of split set cable slings for re

    Jan 1, 1990

  • SME-ICGCM
    Influence Of Support Capacity And Geometry On Tailgate Support

    By E. Hosca

    Alternative tailgate loading conditions due to conventional and conventional/yield pillar combinations were evaluated to define roof loading. In order to isolate different loading situations, the tail

    Jan 1, 1994

  • SME-ICGCM
    Application Of Time Domain Reflectometry To Ground Control

    By Kevin M. Connor, O&apos

    An example application is presented in which Time Domain Reflectometry (TDR) was utilized to monitor roof strata movements during pillar extraction in a potash mine. The study was initiated when Weste

    Jan 1, 1990

  • SME-ICGCM
    Stress And Stability In Coal Ribsides And Pillars

    By A. H. PH. D Wilson

    Compared to the rocks encountered in, say, metalliferous mining or tunnel drivage in igneous and metamorphic rocks, the strata associated with the coal measures are relatively soft. If excavations are

    Jan 1, 1981

  • SME-ICGCM
    Tailgate Roadway Convergence: A Key Indicator Of Potential Ground Control Problems

    By Robert M. Cox

    Abrupt tailgate roadway ground failures, described as floor bumps, sometimes occur in the tailgate entry outby the face during the high-speed extraction of coal from mechanized longwall panels. These

    Jan 1, 1994

  • SME-ICGCM
    Investigation Of Blast Damage And Underground Stability

    By S. Paul Singh

    The implications of blast damage are harmful in both economic and physical sense. To understand the mysterious nature of blast damage assessment and prediction, field work was done by driving an exper

    Jan 1, 1993

  • SME-ICGCM
    Case Studies Using Mine-Wide Monitoring Systems For Geotechnical Evaluations

    By John P. Dunford

    U.S. Bureau of Mines researchers are investigating the ability of mine-wide monitoring systems already in place at many coal operations to provide a direct link between geotechnical instruments and th

    Jan 1, 1993

  • SME-ICGCM
    Safety and Productivity Innovations in Mechanized Bolting

    By Gregory Hinshaw

    Underground mine bolting machines have evolved since inception in the 1940's due to the need for increased safety and productivity. However, major design innovations historically came from change

    Jan 1, 1998

  • SME-ICGCM
    Systematic Principles of Surrounding Rock Control in Longwall Mining within Thick Coal Seams

    By Zhaohui Wang, Jiachen Wang

    "Effective surrounding rock control is a prerequisite for realizing safe mining in underground longwall faces. In the past three decades, longwall top-coal caving mining (LTCC) and single pass large h

    Jan 1, 2018

  • SME-ICGCM
    Some Factors Influencing Stability Of Longwall Gateroad

    Excessive roadway closure in the gateroads impedes the passage of equipment, supplies, personnel and ventilation air in longwall panels. This pager describes several factors that influence the gat

    Jan 1, 1994

  • SME-ICGCM
    Effects of Draw Slate Thickness on Longwall Mining

    By Jun Lu

    The Pittsburgh seam is the most extensively mined coal bed in the Appalachian Basin. Unlike most other prominent coal seams, the Pittsburgh seam typically includes a sequence of immediate roof coals a

    Jan 1, 2013

  • SME-ICGCM
    Injection Techniques for Cost-effective Stabilization of Brittle and Faulted Strata Zones

    By Martin Bolesta

    The use of strata injection as a means of stabilizing brittle and heavily stressed ground as well as faulted zones is now state-of-the art technology. Users are obliged to select the right combination

    Jan 1, 2001

  • SME-ICGCM
    Management of Initial Convergence Events at Broadmeadow Mine

    By D. G. Lynch, M. R. Martin, R. J. Coutts

    "Broadmeadow Mine is an underground longwall mine located in Central Queensland, Australia. The mine introduced a top coal caving (TCC) longwall face in 2013 but since then has experienced severe conv

    Jan 1, 2018

  • SME-ICGCM
    Methods Of Controlling Thick And Strong Roof In Longwall Mining

    By Deren Zhu

    The principle of roof control in longwall mining is to control main roof fractures so as to reduce roof weighting, plus reasonable and effective design of supports to reduce the convergence and premat

    Jan 1, 1990

  • SME-ICGCM
    Estimation Of In-Situ Stress At Ikeshima Colliery Using AE And DRA Method

    By Hideki Shimada

    A low cost methodology that allows the determination of in- situ stress using oriented core specimens has been investigated. The technique can be used to determine the stresses during the early stages

    Jan 1, 2001

  • SME-ICGCM
    Image Analysis Development And Application To Fracture Pattern Analysis

    By Ali Benbia

    The paper shows results from the physical modelling of longwall excavations concentrating on the fracture pattern development above longwall panels. The modelling technique is briefly described and th

    Jan 1, 1993

  • SME-ICGCM
    Prognosis And Control Of Mining Induced Surface Subsidence And Ground Movements In The German Hardcoal Sector, Case Studies

    By Axel Preusse

    This paper shows basic considerations about the prognosis and prediction of surface subsidence and other ground movements in the German hardcoal industry. The following case studies describe experienc

    Jan 1, 2000

  • SME-ICGCM
    Understanding and Optimizing the Performance of Passive Primary Support on Coal Mines

    By Anthony Spearing

    There are approximately 68 million rockbolts installed annually in underground coal mines in the USA (Tadolini and Mazzoni, 2006). The most utilized is the passive fully grouted resin rebar bolt, whic

    Jan 1, 2014

  • SME-ICGCM
    Laboratory and Field Testing of Bolting Systems Subjected to Highly Corrosive Environments

    By Stephen C. Tadolini, John Bolton, Bre-Anne Sainsbury, Tom Meikle

    "The capacity of ground support components which have been affected by corrosion is reduced and may ultimately lead to dynamic failure of the component and the strata. In order to maintain an effectiv

    Jan 1, 2016