Estimation Of In-Situ Stress At Ikeshima Colliery Using AE And DRA Method

International Conference on Ground Control in Mining
Hideki Shimada
Organization:
International Conference on Ground Control in Mining
Pages:
6
File Size:
1445 KB
Publication Date:
Jan 1, 2001

Abstract

A low cost methodology that allows the determination of in- situ stress using oriented core specimens has been investigated. The technique can be used to determine the stresses during the early stages of a project, even in undeveloped areas of a mine. The research aim was to compare the experimental results estimated by the AE and DRA methods to those estimated by conventional ANZI (Australia and New Zealand Inflatable) cell measurements. The studies have been focused on fill stress tensor determination from a single oriented cored rock. In all cases the rock core specimens recollected the in-situ stress reasonably well compared with the standard overcoring method.
Citation

APA: Hideki Shimada  (2001)  Estimation Of In-Situ Stress At Ikeshima Colliery Using AE And DRA Method

MLA: Hideki Shimada Estimation Of In-Situ Stress At Ikeshima Colliery Using AE And DRA Method. International Conference on Ground Control in Mining, 2001.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account