Search Documents

Sort by

  • SME
    Towards Sustainable Development: Conflict Management Practice and Education

    By E. McCullough

    "Fostering positive community relations is a principal tenet of sustainable development, but conflict can test even the strongest of relationships. While conflict surrounding resource development proj

    Jan 1, 2016

  • SME
    High Performance Ground Prediction Ahead of TBMs - The NeTTUN System “TULIPS”

    By Thomas Camus

    "STATE OF THE ART The current situation of ground prediction in TBM is of great concern for tunnelling contractors, and the subject has been quite widely addressed over recent years, for instance by t

    Jan 1, 2016

  • SME-ICGCM
    Void Fill and Support Techniques to Stabilize Drift Excavated Through a Transition Zone Mined By a TBM at the Stillwater Mine

    By Josh Johnson, Stephen Tadolini, Mark Ferster, Curt Jacobs

    "Stillwater Mining Company is the only U.S. producer of platinum group metals (PGMs) and the largest producer outside of South Africa and Russia. The Company controls a considerable portion of the J-M

    Jan 1, 2016

  • DFI
    Guideline for Interpretation of Nondestructive Integrity Testing of Augered Cast-In-Place and Drilled Displacement Piles

    "1 INTRODUCTIONThe use of nondestructive testing (NDT) methods to evaluate the integrity of Augered Cast-in-Place (ACIP) and Drilled Displacement (DD) piles has been a subject of significant debate am

    Jan 1, 2016

  • ISEE
    Dynamic Pressure Measured in a Water-filled Hole Adjacent to a Short Explosive Charge Detonated in a Rock

    By A T. Spathis, M G. Wheatly

    Some preliminary dynamic pressure data were obtained from several charges detonated in a tunnel situated in massive granite rock. The context of the work is the potential for desensitisation of explos

    Jan 1, 2016

  • SAIMM
    Review of Gold Reef Sampling and its Impact on the Mine Call Factor

    "Sampling error and bias, especially the Increment Preparation Error (IPE), are introduced when the tool allocated to do the job fails to extract a representative sample. This is the case with chip sa

    Jan 1, 2016

  • SME
    Management of Obstructions and Adverse Ground Conditions: SCL Tunnel Works on Crossrail C300/410

    By Olivia Perkins, Shawn Sismondi, Adrian St. John, Vicky Potts

    "INTRODUCTION An inherent aspect of any tunnelling project is ground risk: how it is identified, quantified and managed throughout the various stages of a project. Early identification of these risks,

    Jan 1, 2016

  • SAIMM
    A Three-Tier Method of Stability Evaluation for Coal Mines in the Witbank and Highveld Coalfields

    By J. N. Van der Merwe

    "The probability of survival of coal pillars is a more rational indicator of stability than the safety factor. Over time, pillars undergo reduction in size by progressive scaling of the sidewalls. The

    Jan 1, 2016

  • DFI
    Construction of the Tailings Storage Facility Freshet Management Embankment Cut Off Wall at Mount Polley Mine

    By Terry Eldridge, Keith MacKay, David Siddle, Luke Moger

    On August 4th, 2014, a breach occurred in the Perimeter Embankment of the Tailings Storage Facility (TSF) located at the Mount Polley Mine, releasing approximately 10.6 million m3 of supernatant water

    Jan 1, 2016

  • SME
    Advanced Technical Studies for Tunnel Enlargement in Hong Kong

    By Vincent Tricot, Daniel Altier, Roger Storry

    "INTRODUCTION The Liantang / Heung Yuen Wai Boundary Control Point (BCP) project, located in the north-east New Territories of Hong Kong, will form the seventh land crossing between the Hong Kong Spec

    Jan 1, 2016

  • ISEE
    Precision Presplitting Optimization

    By Anthony J. Konya, Calvin J. Konya

    Mine sites and construction projects have faced problems with blasting a smooth back wall. This lead to safety concerns with slope stability and rock falls from the walls. Decades ago Dr. Calvin Konya

    Jan 1, 2016

  • SME
    Closure Risk Assessment in Choghart Iron Ore Mine Using 3D Risk Model

    By S. Amirshenava, S. Nadimi

    "Premature and unplanned mine closure can result in significant adverse impacts on the environment and community and need to be managed appropriately. Risk management techniques can reduce the negativ

    Jan 1, 2016

  • SME
    An Advanced Shaft Construction Method to Install Ten Ventilation Shafts, as Applied in the Naples Metro Project

    By Vittorio Manassero, Antonello de Risi, Filippo Cavuoto

    "This paper deals with an innovative mechanized method to bore and simultaneously line circular shafts, adopted in the Naples Metro project for the installation of 10 vertical shafts for ventilation p

    Jan 1, 2016

  • SME
    The Hirschhagen Highway Tunnel (BAB 44) in Germany: Pre-Support in Extremely Difficult and Inhomogeneous Ground Conditions

    By Günther M. Volkmann

    "INTRODUCTION The construction of the BAB 44 motorway between Kassel and Herleshausen (both Germany) is an important part of the trans-European road network. After its completion, the A 44 will permit

    Jan 1, 2016

  • SME
    Swiss Quartz Dust Guideline - A Tool for Managing the Health Risk Related to Quartz Dust in Early Project Stages

    By Matthias Neuenschwander, Andreas Theiler, Patrick Steinle, John Singer, Martin Vogel, Diego Martini, Ömer Ündül, Markus Weh

    "Quartz Dust is a major health hazard in underground works, wherever the ground contains quartz and depending on the chosen method of excavation. A research project initiated by the Swiss Tunnelling S

    Jan 1, 2016

  • SME
    Mechanical Ventilation of Underground Construction Works in France

    By Patrick Oriez, Chris Norris, Alain Mercusot

    "Temporary mechanical ventilation is one of the fundamental requirements in guaranteeing a healthy atmosphere in underground construction works in order to protect the health of persons working on the

    Jan 1, 2016

  • SME
    Underground Space for Oil Mining

    By Mohamed Gamal, Bill Zietlow

    "In oil fields that have been depleted with conventional surface oil wells but still contain significant reserves, an extraction alternative that has been constructed recently consists of a drilling g

    Jan 1, 2016

  • SME-ICGCM
    Design Concerns of Room and Pillar Retreat Panels

    By Morgan M. Sears, lhsan B. Tulu, Ted M. Klemetti

    "Why do some room and pillar retreat panels encounter abnormal conditions? What factors deserve the most consideration during the planning and execution phases of mining and what can be done to mitiga

    Jan 1, 2016

  • SME
    Advance Exploration by Stochastic Inversion of Tunnel Seismic Waves - A Numerical Study

    By Tamara Nestorovic, Luan T. Nguyen

    "With the aim to mitigate excavation risks and reduce the costs caused by tunnel boring machine (TBM) stoppage when tunneling under uncertain soil conditions, prediction ahead of the tunnel face has b

    Jan 1, 2016

  • SME
    Istanbul Strait Road Tunnel Project—Seismic Joint and Passive Fire Protection in Double Deck TBM Tunnel

    By Basar Arioglu, Jaeung Kim, Mehmet Öztürk, Jinmoo Lee, Dongho Lee, Taek-Kon Kim

    "Istanbul Strait Road Tube Crossing Project (Eurasia Tunnel) includes 3.34 km of a bored double-deck tunnel under the Bosphorus Strait, at a maximum depth of 106 m from the sea level, and 1 km of twin

    Jan 1, 2016