Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    The Interaction of Unique Geology and Retreat Room?and?Pillar Mining on Overburden Barrier Performance at the Grove No. 1 Mine

    By Anthony T. Iannacchione

    This study, funded by the Appalachian Research Initiative for Environmental Science (ARIES), examines how mine layout, mining method, and geology interacted to allow water from the Grove No.1 mine poo

    Jan 1, 2013

  • SME-ICGCM
    Mitigation of a Massive Sandstone Channel's Impact on a 1,500 Ft Wide Longwall Face

    By Daniel W. Su

    This paper presents the implementation and evaluation of the hydraulic fracturing technique and Longwall Visual Analysis (LVA) software to mitigate the impact of a 1,000-ft (305-meter) widemassive san

    Jan 1, 2012

  • SME-ICGCM
    A New Rock Mass Failure Criteria Based On Rate Of Movement

    By Hamid Maleki

    A new failure criteria is proposed for assessment of roof stability in underground sedimentary rocks. Unlike other stability assessment techniques, this method is simple and practical, having improved

    Jan 1, 1990

  • SME-ICGCM
    Determination Of The Rock Strength From Portable Rock Tester

    By K. F. Unrug

    A new testing technique for the determination of the rock strength from portable rock tester is proposed. It is a quick and economical method that can determine the rock strength with reasonable accur

    Jan 1, 1990

  • SME-ICGCM
    Application Of Tailing Sand And Water As Backfill Material In Metal Mines (1992)

    By Sun Henghu

    This paper analyses problems associated with cement based technique in metal mines, and provides a new mining technique of packing the tailing sand and water into solidified material. In the new techn

    Jan 1, 1992

  • SME-ICGCM
    A Case Study of a Low Overburden Longwall Recovery with Pre?Developed Recovery Entries

    By John C. Stankus

    The 3 Right pre-developed longwall recovery entry at Signal Peak Energy?s Bull Mountain No. 1 mine was designed to prevent the abnormal roof conditions encountered in its firsttwo recovery entries. Un

    Jan 1, 2014

  • SME-ICGCM
    Improving Stope Support At Modikwa Platinum Mine

    By Jaco J. van Vuuren

    Modikwa Platinum Mine, in the Eastern Bushveld of South Africa's Limpopo Province, is a new operation employing a hybrid mining method where mechanised methods are used for the main developments

    Jan 1, 2004

  • SME-ICGCM
    A New Method For Longwall Pillar Design

    By P. Tsang

    In order to deal with ground control problems such as roof falls, floor heaves and pillar failures in underground coal mines, a new pillar design method based on the "yield pillar" concept is proposed

    Jan 1, 1993

  • SME-ICGCM
    An Assessment of Coal Pillar System Stability Criteria Based on a Mechanistic Evaluation of the Interaction between Coal Pillars and the Overburden

    By Guy Reed, Russell Frith, Kent Mctyer

    "Coal pillar design has historically been based on assigning a design factor of safety (FoS) or stability factor (SF) to coal pillars according to their estimated strength and the assumed overburden l

    Jan 1, 2016

  • SME-ICGCM
    Chemical Consolidation For Roadway Surrounding Rock - It's Theory And Applications

    By Jinhua Wang

    Based on engineering examples and theoretical analysis, the mechanism of chemical consolidation for fractured roadway surrounding rock was discussed. The chemical consolidating materials and three con

    Jan 1, 1996

  • SME-ICGCM
    Management of Floor Heave at Bulga Underground Operations—A Case Study

    By Kudret Tutuk, Serkan Saydam, Sungsoon Mo

    "This paper presents an overview of the floor heave management at the Glencore Bulga Underground Operations and investigates the contributing factors to the behaviour of the floor. The mine experience

    Jan 1, 2018

  • SME-ICGCM
    Stress Control Method Applied to Stabilization of Underground Coal Mine Openings (e5cbe8ad-30a8-4144-a7b5-db19e81a247a)

    By Shosei Serata

    Serious floor heave of up to 2.4 m in a 2.4-m high mine entry was eliminated by applying the stress control method of mining, as a last resort, at the No. 5 coal mine of Jim Walter Resources, Inc., in

    Jan 1, 1984

  • SME-ICGCM
    Optimization Of District-Wide Mine Layout In Multi-Seam Mining: A Case Study

    By Huamin Li

    Mine # 8 of Pindingshan Coal Group, Henan Province, China has an annual production 2 million metric tons. But it encounters many problems, e.g. mine layout is complicated, roadway maintenance is diffi

    Jan 1, 2000

  • SME-ICGCM
    Bailey Mine Slurry Impoundment Longwall Subsidence Monitoring

    By Richard J. Perin

    Subsidence monitoring was conducted in proximity to the 1-A and 2-A longwall panels at Consol Pennsylvania Coal Co.'s (CPCC) Bailey Mine slurry impoundment. Monitoring fullfills federal Mine Safe

    Jan 1, 1988

  • SME-ICGCM
    Analysis of a Stability Problem in an Underground Coal Mine Due to Floor Conditions

    By M Nombe

    Based on the analysis of a case study at POWELTON No.2 MINE, it was determined that mine stability problems had occurred due to floor softening. A fireclay (underclay) layer in the immediate floor was

    Jan 1, 2002

  • SME-ICGCM
    RYBAD Empirical Field Model For Prediction Of Maximum Land Subsidence Associated With Longwall Coal Mining

    By Thomas Rymer

    Mathematical modelling of mine subsidence measured at 21 locations in Pennsylvania and northern West Virginia allows for the refinement of current methods of predicting maximum land subsidence associa

    Jan 1, 1988

  • SME-ICGCM
    Comparative Case Study Of Yielding And Critical Coal Pillar Designs In Bump-Prone Strata

    By J. R. Koehler

    The failure of yield pillar-based gate mad designs to provide adequate ground control performance is primarily related to the use of "critically" sized chain pillars. A "critical" pillar is one that f

    Jan 1, 1995

  • SME-ICGCM
    Simulated Materials Modeling And Analysis Of The Overburden Strata Movement In Top Coal Caving Mining

    By Zhou Ying

    Based on the mining condition and roof lithology of the 2-3 coal seam at Gengcun Mine, the simulated materials modeling method was used to study the movement process and characteristics of overburden

    Jan 1, 2001

  • SME-ICGCM
    Mitigating Subsidence Influences on Residential Structures Caused by Longwall Mining Operations

    By Yi Luo

    The severity of disturbances caused by longwall mining subsidence to various residential structures can be re¬duced. The success of such mitigation efforts depends on accurate subsidence prediction, c

    Jan 1, 2003

  • SME-ICGCM
    Design, Construction And Performance Of A Single Pass Lining For Soft Ground Coal Mine Tunnel Entries

    By Donald P. Richards

    West Elk Coal Company operates its Mt. Gunnison No. I mine on the western slope of the Rocky Mountains in Western Colorado. The mine is located along the north fork of the Gunnisson River near Somerse

    Jan 1, 1984