    Large Diameter Rock-Socketed Caissons For Vent Building No. 6 Central Artery/Tunnel Project, Boston - Introduction

    By P. A. Neill, O&apos

    The caisson foundation for Vent Building No. 6, at the southern landfall of Boston's Third Harbor Tunnel, was installed inside an unbraced concrete cofferdam 250 feet in diameter and about 70 fee

    Jan 1, 1994

  • DFI
    Installation Of Augered Cast-In-Place Piles - Equipment (6ba9ad25-c173-46b9-a527-da25ba80fe4d)

    ? Hollow Stem Auger ? Drill Bits ? Leads/Torque Arm ? Hydraulic Gearbox ? Hydraulic Power Unit ? Grout Pump ? Crawler Crane

    Jan 1, 2002

  • DFI
    Single-Head Large Diameter Hammer Drill For Bored Piling Actualizes Large Diameter Rock Drilling And Deep Underwater Drilling Operation - Synopsis

    By J. Nakayama

    Down-the-hole hammer is commonly recognized as the most powerful drilling equipment for weathered to fresh rock formation including boulders. However, its drilling diameter is restricted by reasons of

    Jan 1, 1996

  • DFI
    Foundations On Karstic Limestone In Kuala Lumpur Malysia ? Synopsis

    By J. M. Mitchell

    Kuala Lumpur, Malaysia is underlain by karstic limestone. Firm clays, mudstones and siltstoncs of the Kenny Hill Formation overlie the limestone for about two thirds of the city. The remaining third h

    Jan 1, 2010

  • DFI
    Session III - Foundation Techniques In The Urban Environment - Structural Movement And Ground Settlement Control For A Deep Excavation Within An Historic Building - Synopsis

    By Martin J. Kenwright

    Within the famous Harrods department store, a new lift shaft has been constructed, servicing a depth of 22m below ground level as well as the existing 6 storeys of the store. The shaft will connect wi

    Jan 1, 2000

  • DFI
    Execution And Evaluation Of High Capacity Caisson Load Tests In Glacial Deposits

    By Franklin M. Grynkewicz

    As part of the Boston Harbor clean up project, the new 1,000 mgd Deer Island Sewerage treatment plant includes ten 240 feet high egg-shaped "residuals" tanks. Contract documents called for these struc

    Jan 1, 1992

  • DFI
    High-Capacity Rock Anchors Provide Uplift Resistance For Concrete-Filled Steel Pipe Piles - A Case Study

    By James Weaver

    During the past 16 years, the authors have successfully used high-capacity rock anchors installed inside open-ended pipe piles, driven to bedrock, to provide uplift and overturning resistance for vari

    Jan 1, 2011

  • DFI
    Presentation #6 - Rapid Load Testing: A New Choice For Pile Testing

    By Michael D. Justason

    ...a global perspective... In March of 2000, the Japanese Geotechnical Society added "Rapid Load Testing" to their national standard for pile testing. In the year 2000. it is estimated that th

    Jan 1, 2001

  • DFI
    Amsterdam North South Line Metro - Construction Of Deep Diaphragm Walls For Three Underground Stations.

    By Theo. A. M. Salet

    The historic centre of one of the most beautiful cities in Northern Europe -Amsterdam - is being excavated to accommodate the new North/South metro line. This new line is due for completion in 2012, a

    Jan 1, 2006

  • DFI
    Deep Mixing Method: A Global Perspective

    By Donald A. Bruce

    Various types of contemporary Deep Mixing Method (DMM) techniques have been used in the United States since 1986. Such techniques owe their origins to Japanese and Scandinavian developments, which beg

    Jan 1, 1998

  • DFI
    Application of Multiple Excavation Support Systems in Brown Field Project

    By Shuvranshu K. Rout, Anup K. Mandal, Biswajit Das, Manos De

    "To adopt new technology advancement in Steel Plant, there is a requirement of shifting of operation process from Coke Wet Quenching (CWQ) to Coke Dry Quenching (CDQ). New CDQ chamber foundation with

    Jan 1, 2017

  • DFI
    Advances in Stress-Wave Nondestructive Testing Methods for Evaluation of Deep Foundations

    By Joseph T. Coe, Siavash Mahvelati, Alireza Kordjazi

    This paper introduces recent advances in stress-wave NDT systems for use in assessments of in-service foundation integrity and drilled shaft construction. The primary results of the laboratory experim

    Jan 1, 2018

  • DFI
    Ultimate Shaft Friction, Displacement Response and Set-Up for Axially Loaded Piles in Clay

    By Kjell Karlsrud

    "Abstract New semi-empirical design procedures for the determination of ultimate shaft friction and load-displacement response of axially loaded piles in clay are proposed. Hereunder also prediction o

    Jan 1, 2014

  • DFI
    Seismic Hazards Evaluation and Lateral Pile Design in Diatomaceous Earth

    By Arash Khosravifar, Matt Steffan

    An expansion of the City of Klamath Falls Wastewater Treatment plant required geotechnical seismic hazard evaluations and deep foundation design. The site is located on the shore of Lake Ewauna and is

    Jan 1, 2018

  • DFI
    Volume Averaging Technique for Modelling Deformations in Soft Soil Improved with Deep Mixed Columns

    By Minna Karstunen, Patrick Becker

    "Abstract The deformation behaviour of a foundation on deep mixed columns in a natural soft soil is a three-dimensional problem, which has to be considered adequately in numerical modelling. However,

    Jan 1, 2014

  • DFI
    Design Approaches for Externally Supported Earth Retaining Systems – Details and Limitations

    By Matteo Montesi

    Deep foundation elements are often used as discrete elements in externally supported earth retaining structures such as soldier piles and lagging walls, secant/tangent pile walls, anchored walls, etc.

    Jan 1, 2018

  • DFI
    Design Mix Specifications of Plastic Concrete for Dam Cut-Off Diaphragm Walls

    By B. Sivarama Sarma, Biswabikash Rout

    "Seepage control has to be achieved with plastic concrete cut-off diaphragm walls in dam structures. Materials selected for construction of cut-off walls must be durable, impermeable and have stiffnes

    Jan 1, 2017

  • DFI
    Practical Soil Nail Wall Design And Constructability Issues

    By Walter G. Kutschke

    Four significant soil nail wall projects in the eastern United States were recently completed with a combined area of 175,000 square feet of finished shotcrete surface. These projects required the us

    Jan 1, 2007

  • DFI
    Structure Support on Laterally Swept Piles

    By Morgan L. Race, Matthew R. Glisson

    "Most driven pile projects have plumbness limits from 0.25 in/ft (21 mm/m) to 0.5 in/ft (42 mm/m) to control bending stresses. For two projects, the project teams performed static load testing to eval

    Jan 1, 2017

  • DFI
    Site Management Towards Pile Execution At Qurashiya Bridge

    By Emad W. Shublaq

    Contractual site plans are implemented for executing pile foundations (5 x 5) at segmental concrete bridge. Project schedule demands have forced the contractor to find out the most economical procedur

    Jan 1, 1992