Site Management Towards Pile Execution At Qurashiya Bridge

Deep Foundations Institute
Emad W. Shublaq
Organization:
Deep Foundations Institute
Pages:
18
File Size:
2477 KB
Publication Date:
Jan 1, 1992

Abstract

Contractual site plans are implemented for executing pile foundations (5 x 5) at segmental concrete bridge. Project schedule demands have forced the contractor to find out the most economical procedure in achieving the goal. This paper presents a site management technique which is applied by the Contractor. This was found to be fruitful and as much as 60% saving was gained.