Application of Multiple Excavation Support Systems in Brown Field Project

- Organization:
- Deep Foundations Institute
- Pages:
- 10
- File Size:
- 1086 KB
- Publication Date:
- Jan 1, 2017
Abstract
"To adopt new technology advancement in Steel Plant, there is a requirement of shifting of operation process from Coke Wet Quenching (CWQ) to Coke Dry Quenching (CDQ). New CDQ chamber foundation with deep basement and underground conveyor tunnel are to be constructed in an operating plant where heavy foundations and structures are located in close proximity. Furthermore, the existing CWQ system will be in operation during new underground construction and erection. Challenges to deep excavation of tunnel and chamber foundation consist of non-uniform ground condition, prevent washing out of soil from bottom of existing foundations, stability of existing nearby structures, presence of large number of underground utilities, ensuring safe underground workplace to construction resources engaged in new construction work along with project schedule and budget constraints. A combination methods involving use of soil nailing, soil grouting, contiguous bored pile and micro pile had been adopted for protection of excavation sides as well as existing structures. Each side of excavation in different stretches were analysed during design as well as construction stages. The use of combination of all techniques in a single brown field project in context of the nature of site constraints and safety issues made this a unique project.INTRODUCTIONSteel Industry is one of the backbones of industrial growth of any developing country like India. Due to increasing land prices most of the steel plants in India are expanding within their existing plant facilities. In addition to that, there is demand of adoption of new technology for future expansion projects to set new benchmarks with global standards.The property owner had earlier installed a Coke Wet Quenching (CWQ) for their Coke Plant. Now, there is a requirement from process department to proceed with Coke Dry Quenching (CDQ). To facilitate the CDQ within the existing CWQ which will be in operation is the main challenge for the property owner. The second challenge is the limited space for underground construction and subsequent equipment erection within the stipulated time frame.From a geotechnical prospective, the project team had uncertainty and reservations in their mind about the construction methodology. Therefore, the role of three “C”: ‘Consultant’-‘Client’- ‘Contractor’ and their combining brainstorming is essential to freeze a working plan for achieving the goal. In this paper, only the excavation support systems for underground foundation structures have been highlighted in the context of solving geotechnical problems."
Citation
APA:
(2017) Application of Multiple Excavation Support Systems in Brown Field ProjectMLA: Application of Multiple Excavation Support Systems in Brown Field Project. Deep Foundations Institute, 2017.