Influence Of Urbanization And Geology On Deep Foundation Design And ConstructionBy Hiren J. Shah
The urban environment and geology create unique challenges for design and construction of deep foundations. The effect of these is prominently experienced in New York City. Three such project case his
Jan 1, 2011
-
Anchored Excavation Support Using SMW (Soil Mixed Wall)By Seth L. Pearlman
A major excavation support case history for the Eastern approach to the Third Harbor Tunnel (THT) in Boston, MA is described, which uses an anchored Soil Mixed Wall (SMW). Both general and project spe
Jan 1, 1993
-
Large Diameter Piles For Deep Foundation Of Orsang Aqueduct - SynopsisBy A. B. Desai
The construction of 1144 nos. of piles, each 1.5 m diameter, bored-cast-in-situ type and varying in depths from 6.5 to 23m, has been completed as foundation for 26 piers of 548 m long aqueduct across
Jan 1, 1996
-
Dynamic Pile Testing In Soils Exhibiting Set-Up - IntroductionBy Juan M. Antorena
A dynamic testing program was performed to evaluate installation procedures, assess capacity of 610-mm (24-inch) diameter open ended steel pipe to evaluate set-up and provide minimum pile tip elevatio
Jan 1, 1995
-
Ground Movements - A Hidden Source Of Loading On Deep FoundationsBy Harry G. Poulos
Ground movements can arise from a large number of sources and can have a significant effect on nearby piles and deep foundations. The loading of the piles by ground movements is a different mechanism
Jan 1, 2006
-
The Effect of Arching Pressure on a Vertical Circular WallBy Sangseom Jeong, Kyoungyul Kim, Jaeyeon Cho
"Abstract The lateral earth pressure of vertical circular shaft is investigated by using experimental tests and a theoretical analysis. The emphasis was quantifying on the magnitude and distribution o
Jan 1, 2014
-
New Concepts For CFA (Auger Cast) Pile Controle - SynopsisBy Shachar Magali
This article describes two new concepts regarding the CFA (Auger Cast) piles. The first one, MALI Effect, is an approach to control the casting phase, while the second one, NETA Shear, is a technique
Jan 1, 2000
-
Recent Developments In Secant Bored Pile Wall ConstructionBy D. E. Sherwood
Recent developments in high torque hydraulic rotary rigs has lead to the construction of secant bored pile walls by rotary drilling methods in circumstances where earlier methods were difficult and in
Jan 1, 1989
-
Deep Foundation Construction Using "Top/Down" Building Techniques In The United StatesBy David C. Lager
While not a new construction technique "top/down" construction is seeing increased use in high rise building construction. Using diaphragm wall, drilled shaft and mining construction techniques, top/d
Jan 1, 1987
-
Practical Experience With Nondestructive Testing Of Augered Cast-In-Place PilesBy Bernard H. Hertlein
All methods of deep foundation construction present challenges to the contractor and engineer that vary according to the method employed, and the geotechnical conditions in which it is being used. Aug
Jan 1, 1997
-
Case History: Augered Cast-In-Place Piles For The Pittsburgh International Airport Midfield TerminalBy Randy R. Huberty
Although originally designed with deep foundations consisting of all driven steel H piles and drilled caissons, a unique application of Augered Cast-in-Place (ACIP) piles as an alternate design result
Jan 1, 2001
-
The Realities Of Foundation Engineering ? SynopsisBy J. O. Osterberg
The realities of foundation enginering are that the work never proceeds exactly as expected. The various reasons, exploration, design, construction, and legal are discussed. Case histories are present
Jan 1, 2010
-
Full-Scale Field Investigations & Numerical Analyses of Innovative Seismic Composite Fiber Reinforced Polymer and Reinforced Grouted Helical Screw Instrumented Piles Under Axial & Lateral Monotonic & Cyclic LoadingsBy M. Hesham El Naggar, Yasser Abdelghany
"ABSTRACT: The axial and lateral monotonic and cyclic behavior of helical pile foundations was investigated and new innovative helical screw systems suitable for seismic loadings were developed and pa
Jan 1, 2014
-
Interlocking H-Sections For Cofferdams Resist High PressureBy Marc Dondelinger
Interlocking H sections with deep webs and high section modulus are being used for cofferdams and shore enclosures where pressures are excessive. The H sections can be as much as a meter deep; they ca
Jan 1, 1985
-
Deep Soil Mixing for Contaminated Soil Remediation at a Superfund SiteBy Larry Stearns, Lori Tiefenthaler
Remediation of contaminated soil represents a significant market for application of Deep Soil Mixing (DSM). Eighty-one percent of U.S. Environmental Protection Agency (EPA) Superfund Program’s site re
Jan 1, 2018
-
Pile Monitoring, Testing, And Data Processing: New Developments And Remaining IssuesBy Alain E. Holeyman
After scoping out the objectives of this general report, the report reviews the three assigned main themes addressed by the papers submitted to the session: pile monitoring, testing, and data processi
Jan 1, 2006
-
Installation Of Augerpiles In Low Headroom And Restricted Access ConditionsBy Jim Steding
L.G. Barcus and Sons, Inc. recently completed a three-phase project for the expansion of Presbyterian Hospital in Albuquerque, New Mexico for McCarthy Construction Co., the Construction Manager for th
Jan 1, 2003
-
Business Benefits Of An Integrated CFA Rig Instrumentation SystemBy Jason N. Scott
CFA piling is a ?blind? construction process that relies heavily on the rig instrumentation to produce sound piles. If the data measured and recorded during construction can be made available to engi
Jan 1, 2006
-
Söderströmstunneln – An Immersed Tunnel Founded on Steel Core PilesBy Frank Haehnig, Kjell-Åke Averstad, Johannes Glückert
"AbstractThe Söderströmstunneln is part of the Citybanan project that is currently under construction in the centre of Stockholm. Main part of the lot Söderströmstunneln is a 300m long immersed tunnel
Jan 1, 2014
-
Underwater Cable Anchors - Salvage Of Barge 45, Niagara River ? BackgroundBy Colin C. West
On August 7, 1986, Barge 45, while being towed near the mouth of the Niagara River, was swept downstream and pinned against one of the central piers of the Peace Bridge. The barge rested against the p
Jan 1, 1987