Söderströmstunneln – An Immersed Tunnel Founded on Steel Core Piles

- Organization:
- Deep Foundations Institute
- Pages:
- 9
- File Size:
- 5213 KB
- Publication Date:
- Jan 1, 2014
Abstract
"AbstractThe Söderströmstunneln is part of the Citybanan project that is currently under construction in the centre of Stockholm. Main part of the lot Söderströmstunneln is a 300m long immersed tunnel connecting the inner-city islands Södermalm and Riddarholmen. It consists of three tunnel elements that have been immersed in summer 2013. Since the solid bedrock is descending in that area to more then 40m depth, the tunnel elements have been placed and are permanently supported on four pile groups that have been constructed in advance. The common Swedish system of steel core piles has been used to built the pile groups. Drilling and installation of the steel cores piles in free water depth of up to 20m had to be done from a pontoon. The steel core piles are connected with underwater concrete pile caps.IntroductionCitybanan is a new 6km long double track railway tunnel running beneath central Stockholm including two new underground stations Odenplan and Stockholm City. When completed in 2017 commuter trains will have their own tracks through Stockholm, whereas the remaining railway traffic will continue to use the exisiting two tracks (see Fig. 1). This will double the capacity of the railway traffic through Stockholm. The Swedish transport administration Trafikverket is the client for this project. The design and built contract is carried out by the German contractor Züblin Spezialtiefbau GmbH together with their Swedish subsidiary Züblin Scandinavia AS.As the new Citybanan tunnel is in large parts situated below the bedrock level, it can be executed as rocktunnel in the common drill and blast method. Between the two inner-city islands Södermalm and Riddarholmen the tunnel is crossing the Söderström, an arm of the lake Mälaren. Here the bedrock is descending to a deep valley with more then 40m depth. To connect the rock tunnels between these islands a 300m long immersed concrete tunnel supported on pile foundations is currently under construction."
Citation
APA:
(2014) Söderströmstunneln – An Immersed Tunnel Founded on Steel Core PilesMLA: Söderströmstunneln – An Immersed Tunnel Founded on Steel Core Piles. Deep Foundations Institute, 2014.