Anchored Excavation Support Using SMW (Soil Mixed Wall)

Deep Foundations Institute
Seth L. Pearlman
Organization:
Deep Foundations Institute
Pages:
15
File Size:
1536 KB
Publication Date:
Jan 1, 1993

Abstract

A major excavation support case history for the Eastern approach to the Third Harbor Tunnel (THT) in Boston, MA is described, which uses an anchored Soil Mixed Wall (SMW). Both general and project specific information is provided regarding the design and construction of SMW walls. In addition, conclusions are presented that discuss the suitability of this particular application and other possible variations.
Citation

APA: Seth L. Pearlman  (1993)  Anchored Excavation Support Using SMW (Soil Mixed Wall)

MLA: Seth L. Pearlman Anchored Excavation Support Using SMW (Soil Mixed Wall). Deep Foundations Institute, 1993.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account