Anchored Excavation Support Using SMW (Soil Mixed Wall)

- Organization:
- Deep Foundations Institute
- Pages:
- 15
- File Size:
- 1536 KB
- Publication Date:
- Jan 1, 1993
Abstract
A major excavation support case history for the Eastern approach to the Third Harbor Tunnel (THT) in Boston, MA is described, which uses an anchored Soil Mixed Wall (SMW). Both general and project specific information is provided regarding the design and construction of SMW walls. In addition, conclusions are presented that discuss the suitability of this particular application and other possible variations.
Citation
APA:
(1993) Anchored Excavation Support Using SMW (Soil Mixed Wall)MLA: Anchored Excavation Support Using SMW (Soil Mixed Wall). Deep Foundations Institute, 1993.