Large Diameter Piles For Deep Foundation Of Orsang Aqueduct - Synopsis

- Organization:
- Deep Foundations Institute
- Pages:
- 5
- File Size:
- 411 KB
- Publication Date:
- Jan 1, 1996
Abstract
The construction of 1144 nos. of piles, each 1.5 m diameter, bored-cast-in-situ type and varying in depths from 6.5 to 23m, has been completed as foundation for 26 piers of 548 m long aqueduct across Orsang river to carry 1128 m3 water of Narmada Main Canal of the Sardar Sarovar Project in Gujarat. These piles are socketed 1.5 m into foundation grade rockmass. The portal system of 44 nos. of piles and pile cap at the top for each pier is analyzed considering the portal fixed at bottom of piles. The borings for pile shaft were done deploying reverse mud circulation rigs and also by conventional chiseling and bailing operations. Besides vertical loading tests and lateral loading test on piles, dynamic tests such as low strain integrity testing on 290 piles and high strain pile testing on 17 piles were also conducted. The results indicated that (a) the settlement/ displacement are much less than the prescribed limits (b) good quality of concrete (c) piles are firmly socketed and (d) piles have adequate structural capacity to withstand the design load.
Citation
APA:
(1996) Large Diameter Piles For Deep Foundation Of Orsang Aqueduct - SynopsisMLA: Large Diameter Piles For Deep Foundation Of Orsang Aqueduct - Synopsis. Deep Foundations Institute, 1996.