Session I - How Geology Has Driven Foundation Practice Worldwide - Design And Construction Constraints Imposed By Unique Geologic Conditions In New York City ? SynopsisBy George J. Tamaro
The design and construction of foundations in the New York City area are usually dictated by the widely varying geologic conditions encountered in the five boroughs, particularly along the spine of Ma
Jan 1, 2000
-
Grouted Micropiles for Foundation Remediation in Expansive Soil (8th Michael W. O?Neill Lecture)By John D. Nelson
Foundation underpinning is a common component of remediation schemes for distressed foundations on expansive soils. For many applications in expansive soil, micropiles have distinct advantages over ot
Aug 1, 2013
-
Ground Improvement by a Combination of a Mixed-In-Place (MIPTM) Lattice Grid Wall and Stone Columns to Mitigate the Risk of Liquefaction and Lateral SpreadingBy Noreen Tarac, Pablo Forgoso, Philipp Schober
A multiple use storage facility building is being developed in the Philippines on a peninsula that was reclaimed in the 1990s without any soil treatment. The subsoil now consists of loose to medium de
Sep 8, 2021
-
Diaphragm Walls for Seepage Control and Remediation: Three Case HistoriesBy Fabio Santillán, Mario Mauro, Raffaella Granata
"This paper presents the utilization of slurry walls methods for the recent remediation of three high hazard active dams in the United States. Tuttle Creek Dam, located in Manhattan, KS, required seis
Jan 1, 2016
-
Application of Deep Soil Mixing Walls in the Warren Avenue Grade Separation Project, Fremont, CABy D. S. Yang, Y. D. Wang, G. Watanabe, A. P. Notaro
"Deep soil mixing (DSM) walls reinforced with steel soldier piles were installed for excavation support and groundwater control for the construction of a grade separation structure at the intersection
Jan 1, 2015
-
A New Data Interpretation Approach For Pile Thermal Integrity TestingBy Quanchen Sun, Mohammed Z. E. B. Elsahife, Anthony Fisher, Chris Barker, Jennifer Schooling
A review of the literature shows that pile integrity is a significant concern in pile construction. Recently, a new integrity test, thermal integrity profiling (TIP,) has been put into use in foundati
May 1, 2022
-
Reverse Circulation Drilling (Rcd) Technology For Largediameter PilesBy Nikolas Schmitz
For today’s construction industry, large-diameter piles are common practice, as they are more competitive than drilling a larger number of smaller piles. More and more piles are installed by drilling
Nov 1, 2022
-
Micropiles Take Off at Dulles AirportBy Eric Rehwoldt, Walt Rabe, Jesús Gómez, Tim Myers
"An expansion plan for Washington Dulles International Airport is currently underway to prepare for growth at this northern Virginia facility in the future. While Dulles currently serves more than 20
Jan 1, 2009
-
Design of a Raft Assisted Piled Foundation for a High Rise Prefabricated Hotel Structure in Perth, Wa.By Lucie Spencer, Craig Butterworth
"This paper presents the design of a raft enhanced pile group recently constructed for a hotel development in Perth, WA. At the time of construction in 2016 the hotel was the tallest prefabricated hot
Jan 1, 1900
-
Collaborative Alliances – A Sustainable Way Forward For Construction?By Stefano Trevisani
Abstract The FIEC Sustainability Vision states that “risks should be identified and allocated in a fair manner across the project team from the early stages of the design phase. A partnering approach,
Jan 1, 2014
-
A Case Study Describing The Use Of A Top Down Construction Sequence For A Three Level Basement Using A Diaphragm Wall And Cfa Foundation PilesBy Chris Leach, Lucie Spencer
This case study describes the geotechnical aspects of the basement construction for a multi-storey, residential and hotel complex located in the newly developed Elizabeth Quay precinct in Perth, Weste
Nov 1, 2022
-
Errata - Performance Of A Large Diameter Drilled PierBy A. J. Partos
Table 4, Page 311 Table 4 Experimental Parameters from Straight Line Interpretation of Mohr Failure Envelope [ ]
Jan 1, 1991
-
Effects Of Change In The Support System On Temporary Secant Pile WallBy Anburaj C., Srinivas A.
Deep excavation with support system is required to construct various part of underground structures like shafts, stations and entry structures etc. These structures have to be constructed using perman
Nov 1, 2022
-
Engineering Successful Dewatering in Arid Urban Areas: Abu Dhabi Dewatering GuidelinesBy M. Melih Demirkan, Juan J. Gutierrez, Raghav Ramanathan
"As the capital of the United Arab Emirates (UAE), Abu Dhabi is one of the world’s fastest-developing cities. To sustain its significant growth rate, Abu Dhabi must surmount challenging engineering pr
Jan 1, 2017
-
On The Use of Cement Content Determination Tests for Deep Mixing ProjectsBy Emilie Lapointe, Fernando Famania
"A reliable determination of the in-placed cement factor, as defined by mass of cement over volume of final element of treated soil, allows the optimization of cement usage to achieve treated soil req
Jan 1, 2015
-
Site Development and Foundation Planning for a Wastewater Treatment Plant ExpansionBy Steven R. Ahlfield, Ali Ghandeharioon
A wastewater treatment plant commissioned in 1978 is undergoing a major expansion. Planning various phases of the 8-hectare expansion at this site requires an understanding of the site response during
Jan 1, 2019
-
Drilled Shaft Design For Noise Wall Barriers Along I-20 In Columbia, SCBy Anil Bhandari
Using subsurface data collected at each drilled shaft location is an ideal approach for conducting drilled shaft design. However, conducting subsurface tests at each drilled shaft location and subseq
Jan 1, 2011
-
Large Diameter Steel Pipe Piles Running Under Self Weight In Soft Clay ' Predicted Vs. Observed Behavior ' Richmond San Rafael Bridge Seismic RetrofitBy A. R. Dover
The Richmond San Rafael Bridge (Figure 1) is a 4.3 mile long major toll bridge span across northern San Francisco Bay. Tutor-Saliba/Koch/Tidewater (TSKT) conducted a comprehensive seismic retrofit, wh
Jan 1, 2006
-
High Capacity Micropiles in Weak Dolomitic Limestone for Crane Foundation Support – A Case History in Temporary FoundationsBy Brian D. Barkauskas, Terence P. Holman
A major combined nuclear and coal-fired power plant, located in on the western coast of Florida has undergone multiple upgrades in recent years to increase power output and enhance environmental contr
Jan 1, 2017
-
Dynamic and Static Load Tests on Tapered Piles in Soils Exhibiting Time-Dependent Capacity GainBy Terrence M. Carroll, Chu E. Ho
"A pile installation and load testing program on driven tapered piles was undertaken at John F. Kennedy International Airport in New York City for the extension of the existing Terminal 4. As part of
Jan 1, 2015