Abstract
Deep excavation with support system is required to construct various part of underground structures like
shafts, stations and entry structures etc. These structures have to be constructed using permanent or
temporary embedded retaining walls with support system. The selection of a suitable type of retaining wall
will depend upon the geological condition present in the particular location, time, cost and available
equipment etc. In Bangalore Metro Rail Project, secant pile wall is adopted as the temporary earth retaining
system and depth of excavation is about 20 m. It is designed initially based on bottom up construction
methodology with 3 level of struts and 3 level of anchors but at later stage due to time and other construction
related issues, it is decided to change the configuration to 6 levels of strut. Generally, in deep excavations,
all the underground structures should be designed and checked for the critical forces from both permanent
stage and construction stages. Since, secant piles are used as temporary retaining wall, only construction
stage analysis is carried out to get the governing forces and deformation. In construction stage analysis, soil
layers are defined with boundary conditions and the surcharge during construction and surcharge from actual
building near the secant pile are considered. This paper discusses the effect of change in the support system
from anchors to struts and how these changes in the support system affect the behavior of secant pile and
subsequently adjacent buildings present in the influence zone of the excavation. As a result, in changing
from anchors to struts, the wall displacement, strut forces and ground movement on the adjacent ground and
buildings increases. The increase in deflection, ground movements and strut forces occurs during backfilling
sequence of the underground station excavation. During backfilling, struts has to be removed and this
imparts higher magnitude in deflection, strut forces and ground movements.