Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Study Of Quantitative Impacts To Ground Water Associated With Longwall Coal Mining At Three Mines Sites In The Northern West Virginia Area
By Denise Y. Dixon
The objectives of this study were to (1) document the hydrologic impacts of longwall mining on ground water, (2) identify the factors which affect the extent of dewatering, and (3) develop empirical t
Jan 1, 1988
-
Investigation Of Pillar-Roof Contact Failure In Northern Appalachian Stone Mine Workings (55897abb-5ce0-4661-bf26-04d03fe5d67b)
By Gabriel Esterhuizen
The roof rock in underground limestone mines in Northern Appalachia can be subject to high horizontal stresses in spite of the shallow depth of the workings. The high stresses can cause roof stability
Jan 1, 2004
-
The Advance And Relieve Mining Method: A Horizontal Stress Control Technique
By Frank E. Chase
Sacrificial entries, roof slotting, and other tactics have been used to combat high horizontal stresses during roadway development in U.S. coal mines. In Australia, the "pillar extraction on the advan
Jan 1, 1999
-
Application Of DDM To Some Rock Pressure Problems In Japanese Deep Coal Mines
By Yoshiaki Fujii
Displacement Discontinuity Method (DDM), which was originally developed by Crouch,S.L., is a powerful tool to calculate mechanical disturbances due to tabular excavations. Three topics on DDM applicat
Jan 1, 1992
-
Utilization Of Polymer Grid Structures In Shield Recovery Operations
By Brian E. Travis
Recent Developments in the utilization of polymer grid structures for Longwall Shield Recovery operations are discussed. Specifically: various Longwall screen designs and the numerous methods employed
Jan 1, 1993
-
Subsidence Prediction In Illinois Coal Basin
By Ed D. Doney
Based on the subsidence data collected through a comprehensive subsidence monitoring program con: ducted over two longwall panels in an Illinois coal mine, mathematical models have been proposed for p
Jan 1, 1990
-
Sidewall Fracturing In Coal Room And Pillar And Pillar Extraction Panels (fdea63a5-d54d-46e2-aad5-6c4f1c72e2f1)
By André Vervoort
In coal room and pillar, and pillar extraction panels, the sidewall conditions were investigated based on underground measurements and numerical simulations. Three-dimensional linear elastic models pr
Jan 1, 1992
-
The Effect Of Hazardous Geologic Structures On Gateroad Stability
By Frank E. Chase
Geologic structures have been responsible for numerous underground accidents and fatalities, and are a constant-source of down time. During - longwall mining, ground control problems associated with g
Jan 1, 1990
-
Mitigating Subsidence Influences on Residential Structures Caused by Longwall Mining Operations
By Yi Luo
The severity of disturbances caused by longwall mining subsidence to various residential structures can be re¬duced. The success of such mitigation efforts depends on accurate subsidence prediction, c
Jan 1, 2003
-
Highwall Augering In Ultra-Thick Western Coal Reserves: Unique Geotechnical And Operational Challenges
By Timothy Ross
The Pittsburg & Midway Coal Mining Co.'s Kemmerer Mine is one of the deepest surface coal operations in the world, with the highwall extending to approximately 1,000 ft above the pit floor. To in
Jan 1, 1999
-
Longwall Mining-Induced Abutment Loads and Their Impacts on Pillar and Entry Stability
By Jinsheng Chen
Longwall mining-induced abutment loads on the surrounding coal pillars can be grouped into two categories in terms of the relative position of the coal pillars and the longwall face. They are the fron
Jan 1, 2002
-
Comparative Case Study Of Yielding And Critical Coal Pillar Designs In Bump-Prone Strata
By J. R. Koehler
The failure of yield pillar-based gate mad designs to provide adequate ground control performance is primarily related to the use of "critically" sized chain pillars. A "critical" pillar is one that f
Jan 1, 1995
-
The Stress And Failure Paths Followed By Coal Mine Roofs During Longwall Extraction And Implications To Tailgate Support
By Ross Seedsman
Discussion on the design of roof support in tailgates has often been conducted without a clear statement of the stress and failure conditions acting. There is general agreement that in the tailgate th
Jan 1, 2001
-
Causes of Massive Directional Roof Falls in Room and Pillar Mines - Two Case Studies
By S. S. Peng
In recent years many roof falls have been conveniently attributed to the adverse existence of a high horizontal stress. The normal practice of not conducting a follow-up study in a roof fall investiga
Jan 1, 1999
-
RQD from the Barrel to the Box: Weatherability May be a Better indicator for Roof Support Design
By Kot Unrug
For the purposes of underground mine design, twelve cores of the Springfield (V) Coal (Pennsylvanian) roof and floor were retrieved. Each core was photographed, described fresh in the barrel, and the
Jan 1, 2003
-
The Characteristics Of Mining-Induced Fractures In Overlying Strata
By Jialin Xu
Bed separations position, size, development characteristics and their influence factors have been analyzed in-depth by experimental and theoretical methods. The results show that the key strata determ
Jan 1, 2003
-
Weatherability Test of Rocks for Underground Mines
By Kot F. Unrug
The shale response to moisture changes and the major finding of the appropriate research concerning this subject are briefly reported in this paper. Also described are mine ambient atmospheric condit
Jan 1, 1997
-
Downhole Overcoring Stress Measurement at a Western Underground Coal Mine
By David Conover
Knowledge of the magnitude and direction of the horizontal secondary principal stresses is a critical factor in designing the layout and mining sequence of underground openings. Typically, horizontal
Jan 1, 2004
-
A Methodology for Fault Pre-Consolidation prior to Longwall Retreat: A Case Study from Kestrel Coal
By Dion Pastars
Kestrel Coal has undertaken a surface-to-seam consolidation program of faulted ground prior to longwall retreat in the 304 panel. Micro fine cement is used to improve the rock mass quality and the
Jan 1, 2007
-
Assessment Of Underground Structural Design
By Eugene D. Krupa
Mine 33 of Beth Energy has serious and complex roof cutter problems causing delay of the advance rate of both the entry development and longwall face retreat. The cost of maintaining these entries is
Jan 1, 1990