Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Sunrise Powerlink: An Innovation in Foundation DesignBy Steve Davidow, Nick Salisbury
"The Sunrise Powerlink project received numerous industry awards for excellence. The DFI C. William Bermingham Innovation Award recognized the innovative use of prefabricated steel micropile caps to i
Jan 1, 2014
-
Experimental And Numerical Assessment Of Osterberg Load Tests On Large Bored Piles In SandBy Roberto Nova
The selection of the Osterberg Cell (O-Cell) technology as the standard testing method for deep foundations of the Railways Po Viaduct in Northern Italy offered a relevant number of field measures on
Jan 1, 2008
-
Alternative Design and Construction Method for Clinton CSO Underground Storage FacilityBy Meeok Kim, Paul Beljan, Gordon Chen
"Clinton combined sewer overflow storage (CSO) facility project developed by the Department of Water Environment Protection of Onondaga County, New York, is to improve sewer facilities and infrastruct
Jan 1, 2015
-
Ideas To Improve Driven Pile Foundation Design And Installation ProceduresBy Armin W. Stuedlein, Steven R. Saye
The differences between calculated axial pile capacity and the capacity realized during and following installation has long presented a significant concern for foundation engineers and contractors. Su
-
4 Equipment Installation: Recent Developments - Equipment Installation - Recent Developments: General Report On 'Deep Foundation Installation Monitoring' - 1. IntroductionBy B. De Paoli
At Pietrafitta, between Assisi and Perugia, ENEL (Italian National Electricity Authority) has for some time been managing a power-station operated with lignite, mined from an open mine on the way to e
Jan 1, 1994
-
Large Diameter Helical Piles for Refinery ExpansionBy Chris Normand, Paul Volpe, Eric Wey, Howard Perko, Burt Ogilvie, Patrick Murray
"A refinery expansion project for Marathon Petroleum Company in Southern Louisiana required existing medium to large pipe racks to be expanded for additional capacity. Foundation modifications were ne
Jan 1, 2017
-
2D And 3D Ansys Modeling For Deep Excavation And Evaluation Of Soil-Structure InteractionBy Yahia M. Al-Smadi
Effect of lateral loading against existing sheet pile wall and distribution of gravity loading due to various number of construction loading scenarios were studied. The objective of this effort was t
Jan 1, 2010
-
Brickworks Marketplace Ground Improvement, AdelaideBy Andrew Middleton, Mark Wyatt
"The Brickworks Marketplace Project is a significant shopping centre development in inner north west Adelaide constructed by Badge Constructions in 2014 and 2015. The site was a former brickworks with
Jan 1, 1900
-
ACIP Pile Performance and Installation in the Northeastern United StatesBy Jr NeSmith
"Augered-cast-in-place (ACIP) pile installation technology has matured extensively since the first auger, pressure grouted pile was patented in 1959. The current technology allows for successful pile
Jan 1, 2016
-
Soil Cement Tensile Strength and Modulus as a Function of Unconfined Compressive StrengthBy Dominic Parmantier, Jason Page
"In the past, the designers of DSM have analyzed various failure modes and then specified a minimum unconfined compressive strength (UCS) for the soil-cement. The specified minimum UCS reflected the c
Jan 1, 2015
-
Replacement Bored Piles for the Houphouet-Boigny Bridge, Cote D'ivoireBy Adrian Mercer, Ashkan Ameri
Due to general degradation, increased traffic levels, and historical ground movement, this road and rail bridge which provides an essential link between the interior of the country and the Port of Abi
Sep 8, 2021
-
Measured and Modeled Settlements of Power Plant on Piled Raft Foundations (2734870e-dd47-46f3-a815-25575798a774)By Alireza Ayoubian, Douglas S. Roy, Gianni O. Chieruzzi
"A 400 MW, gas-fed power plant on floating piles and piled raft foundations was constructed in the Province of Moskovskaya, Russia in 2008. The subsurface is characterized by fill underlain by loose t
Jan 1, 2017
-
Design, Construction, And Testing Of A Precast UHPC PileBy Thomas L. Vande Voort
The strategic plan for bridge engineering issued by AASHTO in 2005 identified extending the service life and optimizing structural systems of bridges in the United States as two grand challenges in br
Jan 1, 2008
-
Cased Auger Piles (CAP): An Effective Piling SolutionBy Federico Pagliacci
Continuous Flight Auger (CFA) technique represents an important technological advance in the construction of piles in soft soils. The possibility of excavation under the water table with no need for
-
Cased Auger Piles (CAP): An Effective Piling Solution (With CAP Technique)By Federico Pagliacci
Continuous Flight Auger (CFA) technique represents an important technological advance in the construction of piles in soft soils. The possibility of excavation under the water table with no need for d
Jan 1, 2017
-
Application of the Cement Deep Mixing Method for Shallow Water Areas Using the CDM-Float TechniqueBy Takeo Asanuma, Sachihiko Tokunaga, Hirofumi Taguchi, Yasuhiro Ootsuka, Yosuke Tanaka
The Cement Deep Mixing Method (CDM Method) is a ground improving method that has been used for mainly offshore sites to strengthen the soft ground below the sea bottom by injecting and adequately mixi
Jan 1, 2015
-
Presentation #5 - The High-Strain Dynamic Load Test (Drop Weight Test) - ContentsBy Frank Rausche
Why testing What tests can be done Dynamic load testing Loading device Measurements Analysis Examples
Jan 1, 2001
-
Design Of Cost-Effective Retaining Wall At The Junction Of Approach Bridge Over A RampBy Dr. Anup Kumar Mandal, Partha Roy, Shuvranshu Kumar Rout, Dipak Mandal, Biswajit Das
Installation of a new scalping station with bunker, apron feeder, scalping screen, ramp -retaining wall and approach bridge was planned in an existing integrated complex of phosphate fertilizer at a r
Sep 1, 2022
-
Session 11 Jet Grouting IIBy George Burke
Of the three projects, particularly the extensive Nimitz II (downtown) project, a single system, which was part of the operation, was used to control the spoil. Spoil control was continuous with the w
Feb 10, 2003
-
“Digital Specialist Foundations”- Using The Digital Twin During Project ExecutionBy Marcus Daubner
This paper explains how BAUER Spezialtiefbau GmbH uses digital methods on projects - starting from work preparation to completion of works. More precisely, the advantages of BIM-based planning during
Sep 1, 2022