Abstract
Of the three projects, particularly the extensive Nimitz II (downtown) project, a single system, which was part of the operation, was used to control the spoil. Spoil control was continuous with the work since a vacuum truck and crew was used to suck up the spoils as they came out of the borehole. So, the whole job was kept clean both during operations and at the end of the shifts. On the Sand Island project, a double system was used. Larger spoil quantities were contained within the shaft limits during the work and the cleanup or disposal of the spoils was performed during excavation.