Session 11 Jet Grouting II

Deep Foundations Institute
George Burke
Organization:
Deep Foundations Institute
Pages:
4
File Size:
297 KB
Publication Date:
Feb 10, 2003

Abstract

Of the three projects, particularly the extensive Nimitz II (downtown) project, a single system, which was part of the operation, was used to control the spoil. Spoil control was continuous with the work since a vacuum truck and crew was used to suck up the spoils as they came out of the borehole. So, the whole job was kept clean both during operations and at the end of the shifts. On the Sand Island project, a double system was used. Larger spoil quantities were contained within the shaft limits during the work and the cleanup or disposal of the spoils was performed during excavation.
Citation

APA: George Burke  (2003)  Session 11 Jet Grouting II

MLA: George Burke Session 11 Jet Grouting II. Deep Foundations Institute, 2003.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account