At Pietrafitta, between Assisi and Perugia, ENEL (Italian National Electricity Authority) has for some time been managing a power-station operated with lignite, mined from an open mine on the way to exhaustion. A new plant is under construction which is located in the mine that was filled with tailings, mainly clays, sandy silts, lignite and ashes produced by the power-station. The soil profile is shown in Fig. 1: the thickness of the made ground is around 27 m. The foundation of the new power-station is on 320 t piles, 1.20 m diameter, embedded in the cohesive base formation at a depth of 57.5 m. 2,350 piles will be constructed for a total length of 125 km. It is therefore one of the largest pile sites at present in operation in Italy. [ ]
Citation

APA: B. De Paoli  (1994)  4 Equipment Installation: Recent Developments - Equipment Installation - Recent Developments: General Report On 'Deep Foundation Installation Monitoring' - 1. Introduction

MLA: B. De Paoli 4 Equipment Installation: Recent Developments - Equipment Installation - Recent Developments: General Report On 'Deep Foundation Installation Monitoring' - 1. Introduction. Deep Foundations Institute, 1994.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account