4 Equipment Installation: Recent Developments - Equipment Installation - Recent Developments: General Report On 'Deep Foundation Installation Monitoring' - 1. Introduction

- Organization:
- Deep Foundations Institute
- Pages:
- 7
- File Size:
- 2285 KB
- Publication Date:
- Jan 1, 1994
Abstract
At Pietrafitta, between Assisi and Perugia, ENEL (Italian National Electricity Authority) has for some time been managing a power-station operated with lignite, mined from an open mine on the way to exhaustion. A new plant is under construction which is located in the mine that was filled with tailings, mainly clays, sandy silts, lignite and ashes produced by the power-station. The soil profile is shown in Fig. 1: the thickness of the made ground is around 27 m. The foundation of the new power-station is on 320 t piles, 1.20 m diameter, embedded in the cohesive base formation at a depth of 57.5 m. 2,350 piles will be constructed for a total length of 125 km. It is therefore one of the largest pile sites at present in operation in Italy. [ ]
Citation
APA:
(1994) 4 Equipment Installation: Recent Developments - Equipment Installation - Recent Developments: General Report On 'Deep Foundation Installation Monitoring' - 1. IntroductionMLA: 4 Equipment Installation: Recent Developments - Equipment Installation - Recent Developments: General Report On 'Deep Foundation Installation Monitoring' - 1. Introduction. Deep Foundations Institute, 1994.