Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Subsurface Component Design and Construction for a High-Rise in a Dense Urban Environment: A Case History of the 181 Fremont Tower
By Kirk Ellison, Eric S. Lindquist, Peter Faust, Stephen M. McLandrich
"The 181 Fremont Tower will be an 800-foot high-rise with a 60-foot deep basement located in a dense urban part of downtown San Francisco. The design and construction methods of the subsurface element
Jan 1, 2017
-
Construction of the Tailings Storage Facility Freshet Management Embankment Cut Off Wall at Mount Polley Mine
By Terry Eldridge, Keith MacKay, David Siddle, Luke Moger
On August 4th, 2014, a breach occurred in the Perimeter Embankment of the Tailings Storage Facility (TSF) located at the Mount Polley Mine, releasing approximately 10.6 million m3 of supernatant water
Jan 1, 2016
-
Deep Soil Mixing Ground Improvement for the U.S. Federal Courthouse in Downtown Los Angeles, California
By Roberto A. Lopez, Eric Lindquist, Jon Bussiere, Dean Iwasa
"The new 11-story U.S. Federal Courthouse building in downtown Los Angeles demanded a cost effective foundation system capable of attaining a strict total settlement criterion of 0.5 inches (12 mm) un
Jan 1, 2015
-
Case History: Drilled Shaft Foundation System in Cemented Soils, Las Vegas, Nevada
By Rouzbeh Afsharhasani, Moses Karakouzian, Brandon Kluzniak
"The Vegas High Roller is the centerpiece of a new development parcel adjacent to the Las Vegas Strip. At a height of 550 feet, the High Roller is currently the tallest observation wheel in the world.
Jan 1, 2017
-
Innovation In Spliced Prestressed Piles: Testing And Use Of The Emeca Pile Splice
By John C. Ryan
The Emeca Pile Splice, an innovative mechanical prestressed concrete pile splice, is the first robotically welded splice to be fabricated in the United States. An analytical and experimental study wa
Jan 1, 2010
-
Shaftcam: A Practical and Cost Effective Solution to Drilled/Bored Pile Hole Inspection
By Sastry Putcha, Santosh Mummaneni, Avasarala Swamy
"Inspection of bored pile hole bottom prior to placement of concrete is one of the most crucial element of foundation design and construction, especially for end bearing piles. Pile hole bottoms that
Jan 1, 1900
-
“Trevi-Calatore”: Innovation in Cut and Cover and Tunneling for the Installation of Plunge Columns Aimed to Excavate Underground Structures through the Top-Down Method
By Alessandro Bertero, Manuel Toniolo, Vincenzo Tirozzi
"The installation of foundation elements (large-diameter Bored Piles or Diaphragm Walls) for the execution of underground works to be performed through the ""Top Down"" Technique (Stations, Car Parks,
Jan 1, 2016
-
Data Drives Herbert Hoover Dike (Hhd) Rehabilitation Efforts
By Michael Arnold, Jignyash Manyam, Yoav Rappaport
The USACE required construction of over 13 miles of cutoff wall at an average depth of 65 feet for the Herbert Hoover Dike (HHD). To meet project requirements, to provide quality control and make soun
Oct 1, 2022
-
Micropiles Take Off at Dulles Airport
By Eric Rehwoldt, Walt Rabe, Jesús Gómez, Tim Myers
"An expansion plan for Washington Dulles International Airport is currently underway to prepare for growth at this northern Virginia facility in the future. While Dulles currently serves more than 20
Jan 1, 2009
-
Urban High Capacity Deep Foundation Solutions in Sites with Complex History and Geology
By Karen C. Armfield, Gisele R. Passalacqua, Joanna Smith
New York City is an urban environment with a history spanning over 200 years. The coastline of New York has changed over the years. In the East River, old bulkhead and remnant of relieving platforms t
Jan 1, 2019
-
Realistic Estimation Of Water Table Depth For Design Optimization Of Bored Tunnel And Cut & Cover Tunnel Structures For Underground Metro
By Chiranjib Sarkar, Sibapriya Mukherjee, N Kumar Pichumani
With the rapid expansion of urban transportation systems, tunnels and cut & cover structures are considered as the only solution in improving the urban space congestion problem in mass rapid transit s
Nov 1, 2022
-
Keynote Lecture 2: Dr. Masaaki Terashi The State of Practice in Deep Mixing Methods
By Masaaki Terashi
The machine for the hybrid method called JACSMAN is ordinarily a dual shaft machine. Each shaft has augers at three different levels and nozzles for jetting at two different levels. The distance betwe
Feb 10, 2003
-
Numerical Modelling Of Nonlinear Piles ? Synopsis
By S. P. Lin
The numerical models of nonlinear piles for deep foundations are studied in this paper. The purpose of these is to clarify the mechanical behaviour of deep foundation nonlinear piles subjected to axia
Jan 1, 2010
-
Driven Pile Foundation Design and Construction Issues for a Highrise Building in Manhattan
By Satyajit Vaidya, Rudolph Frizzi, Sandy Larimer
"This paper presents a case history in design and construction of a deep foundation system that included high-capacity open-ended driven piles constructed to support a high-rise building in Manhattan,
Jan 1, 2016
-
Instrumented Pile Load Tests on ACIP Piles for a Real Estate Project in Kolkata-A-Case Study
By Krishnendu Mandal
"For a multi-story building project in Kolkata, a pile load testing program was conducted to minimize pile performance uncertainty resulting from variable subsurface conditions and to verify the pile
Jan 1, 2015
-
Goethals Bridge Replacement Foundation Design Modifications Due to Field Conditions
By John P. Turner, Mark Jen, Bobby Daita
"The Port Authority of New York and New Jersey is replacing the existing Goethals Bridge built in 1928 which is deemed to be functionally obsolete. The replacement bridge will consist of a dual cable-
Jan 1, 2016
-
Performance Of Open And Close-End Screw Piles In Bearing Layer
By Faisal Shalzad, Adnan Anwar Malik, Tadashi Maejima, Jiro Kuwano
Single helix screw piles carry most of the structural load through end-bearing if the helix is embedded in the dense bearing layer. The tip condition of the central shaft of the screw pile can be clos
Oct 1, 2022
-
Dynamic Load Testing Of Non-Uniform Piles
By Thai Nguyen Ph. D
Dynamic Load Test (DLT) on driven piles has been performed routinely all over the world. In several recent projects, even 100% testing has become a norm where every single pile is dynamically load tes
Oct 1, 2022
-
Session 17 "Grout for Enhancement of Piles and Piers"
By Dennis Wrixon
It was a little bit exceeded. The decision was the uniform settlement is measured at each one corner and the highest one corner is the important one. And in addition there is a differential settlement
Feb 10, 2003
-
Screw and Straight Pile Behavior under Cyclic Compressive Loading in Dense Sand
By Adnan A. Malik, Tadashi Maejima, Jiro Kuwano, Shinya Tachibana
"The helical piling system provides solution to many geotechnical related problems due to its quick installation, higher compressive and pullout resistance, no wastage of material, workable in limited
Jan 1, 2016