Deep Soil Mixing Ground Improvement for the U.S. Federal Courthouse in Downtown Los Angeles, California

Deep Foundations Institute
Dean Iwasa Roberto A. Lopez Eric Lindquist Jon Bussiere
Organization:
Deep Foundations Institute
Pages:
11
File Size:
1646 KB
Publication Date:
Jan 1, 2015

Abstract

"The new 11-story U.S. Federal Courthouse building in downtown Los Angeles demanded a cost effective foundation system capable of attaining a strict total settlement criterion of 0.5 inches (12 mm) under high applied loads. A design-build ground improvement system consisting of 3 ft (0.9 m) and 7 ft (2.1 m) diameter deep soil mix (DSM) columns embedded into the relatively soft Fernando Formation bedrock was selected for the project. The DSM columns support applied stresses of up to 8,800 psf from four large concrete core elements that transfer concentrated building loads to a 3 to 6 ft (0.9 to 1.8 m) thick reinforced concrete mat. The soil mixing ground improvement solution provided flexibility by allowing installation of the DSM columns around existing belled caissons left in place from prior structures, and by allowing repositioning of some of the DSM columns to avoid other existing obstructions in the fill. DSM spoils were used to construct a 2 ft (0.6 m) thick load transfer platform on top of the DSM columns. Quality control measures included utilizing equipment outfitted with automated data acquisition systems, performing three full scale load tests, performing daily wet-mix sampling and compression testing, performing full-depth coring and unconfined compression testing on core samples, and using a borehole acoustic televiewer to evaluate the uniformity of the DSM columns where core recovery was problematic. The results of subsurface investigation and the load tests were used to develop 3-dimensional finite differences models for evaluating stress distribution and deformation of the foundation system.INTRODUCTIONThe new U.S. Federal Courthouse building is currently under construction in downtown Los Angeles, California. The new courthouse will be 11 stories tall with one partial below-grade B1 basement level. The building will have four structural core elements that extend from the main building foundation at the B1 level to the top of the structure. The majority of the building loads will be transferred through the structural core elements to a new 3 to 6 ft (0.9 to 1.8 m) thick reinforced concrete mat beneath the central portion of the structure. The foundation pressures beneath each of the core element locations will be approximately 6,200 to 8,800 psf (300 to 420 kPa) with lower foundation pressures at locations farther away from the central core area."
Citation

APA: Dean Iwasa Roberto A. Lopez Eric Lindquist Jon Bussiere  (2015)  Deep Soil Mixing Ground Improvement for the U.S. Federal Courthouse in Downtown Los Angeles, California

MLA: Dean Iwasa Roberto A. Lopez Eric Lindquist Jon Bussiere Deep Soil Mixing Ground Improvement for the U.S. Federal Courthouse in Downtown Los Angeles, California. Deep Foundations Institute, 2015.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account