Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Methods For Preventing Decompression Of Soft Ground During Soft Ground Tunneling For The Paris MetroBy J. Janin, J. F. Bougard
Development of improved transportation networks in major urban centers has led more and more to underground construction, the only reasonable solution for decreasing surface traffic congestion. Excava
Jan 1, 1974
-
Use Of Precast Concrete Segments For The Price Road Drainage Tunnel Tempe, ArizonaBy William D. Leech, Ronald E. Romley, Gary N. Sheppard
The Price Road Drainage Tunnel was constructed for the Arizona Department of Transportation (ADOT) in 1988 and 1989 to provide surface water drainage for the proposed outer Loop Highway (SR 117). The
Jan 1, 1991
-
8 M Diameter 7 KM Long Beles Tailrace Tunnel (Ethiopia) Bored And Lined In Basaltic Formations In Less Than 12 MonthsBy Antonio Raschillà
On the 2nd of June 2007 SELI S.p.A. started the excavation of Beles Tailrace Tunnel (Ethiopia). The new 8,07 m diameter DS Universal TBM utilized for the tunnel excavation was manufactured by SELI S.p
-
An Innovation In Machine TunnelingBy J. Donovan Jacobs
Many improvements in the art of underground excavation have appeared during the past two decades. These improvements have been both in methods and in machinery and have resulted in more economical con
Jan 1, 1974
-
Alternative Final Cavern Linings For The East Side Access Transit ProjectBy Colin Barratt
The East Side Access (ESA) project is the largest underground rail infrastructure project under construction in New York City, USA. The Manhattan segment of the project is to be mined through rock and
-
Construction of a Mixed Face Reach Through Granitic Rocks and ConglomerateBy John J. Murray, Michael T. McRae, Michael A. Krulc, Kathy L. Schuler
The San Vicente Pipeline Tunnel Project involves the construction of an 8.5-foot-diameter water pipeline in an 11 mile tunnel in San Diego, California. The tunnel is located in extremely variable geol
Jan 1, 2007
-
Events leading to Colombia’s Ruiz volcano eruption and its results describedBy Antonio Rivera
On Nov. 13, 1985, Colombia's Ruiz volcano erupted, killing an estimated 25,000 people and burying several villages. Damages were estimated to be about $US300 million. The following is an accou
Jan 2, 1986
-
Tunneling?Pipe Jacking of Large Diameter Pipes in O?Hare International AirportBy Mohammad Djavid
The one-pass tunneling pipe jacking method has often been the most schedule and cost efficient method for the pipe line installation. The main challenges in jacking pipes larger than 108 inches and fo
Jan 1, 2008
-
Water Tunnel in Liaoning Province, Northeast ChinaBy Li Jiuping, Zhong Gang, Chen Yong Zhang, I. Michael Gowring
The Liaoning Dahuofang Reservoir Water Transfer Project is an important development for the Department of Water Resources of Liaoning Province in northeastern China. The 85.3 km water conduit will tra
Jan 1, 2007
-
1970s – SME Moves Headquarters From New YorkBy William M. Gleason
The war in Vietnam stretched into another decade, an American President was at the brink of impeachment, the earth was given its own day, twin tower monuments of American ingenuity were completed in N
Jan 1, 2007
-
Construction of the Sacramento River Tunnels on the Lower Northwest Interceptor Sewer, Sacramento, CaliforniaBy Dan Martz, Bill Moler, David Young, Wally Chen, Matthew Crow, Steve Norris, Tolga Togan
Two 610 m (2000 ft) long tunnels were driven through water bearing silts, sands and clays beneath the Sacramento River using a 4.59 m (15.1 ft) diameter Earth Pressure Balance Tunnel Boring Machine (E
Jan 1, 2007
-
Sao Paulo Metro Project?Control Of Settlements In Variable Soil Conditions Through EPB Pressure And Bicomponent Backfill GroutBy Lorenzo Pellegrini
The respect of EPB reference pressure during TBM advance and hyperbaric activities, the complete and effective filling of the annular gap between tunnel lining extrados and the excavation section and
-
The Role of Gas Hydrate in a Global Gas MarketBy M. D. Max, A. H. Johnson
INTRODUCTION Gas hydrates have considerable potential to be a major energy resource owing to their apparent abundance in Arctic regions and along continental margins throughout the world (Kvenvolden,
Jan 1, 2006
-
Pre-Support Measures for Shallow NATM Tunneling in Urban SettingsBy Vojtech Gall
Pre-support measures for urban tunneling have seen a substantial development in the recent past. Ground improvement techniques, pipe-arch and spiling methods now allow for non-disruptive tunneling at
Jan 1, 2008
-
Borehole Hoisting For Shaft Sinking And Development At Brunswick Mining And Smelting Corporation Limited, Bathurst, New BrunswickBy W. R. Dengler, R. S. Brown
In 1974, Brunswick Mining and Smelting Corporation Limited started a 48 million dollar expansion programme at their property in Bathurst, New Brunswick. A portion of the expansion plans includes a 26
Jan 1, 1976
-
Assessing Small Underground Coal Mines For High Safety-Related RiskBy H. Kinilakodi
In 2008, the authors developed a methodology for assessing underground coal mines for high risk for major-hazard events. It focused on major hazard-related violations of safety standards associated wi
Jan 1, 2011
-
Mine Development With Heavy RoadheadersBy Robert A. Pond
Heavy (exceeding 35 tons) roadheaders have not seen much use in the United States, but are used extensively in Europe to excavate many types of underground openings in civil and mining applications. E
Jan 1, 1983
-
Exploration Decision Analyses for the Brightwater TunnelsBy L. Maday, V. J. Perrone, M. B. Gilbert
INTRODUCTION The Brightwater conveyance system project in King County, Washington consists of constructing about 21 km (13 mile) of effluent and combined influent and effluent tunnels. The influen
Jan 1, 2005
-
Comparing EIA And ESHIA For Evaluating Mining ProjectsBy R. E. Mitchell
Environmental Impact Assessment (EIA) is the accepted method for evaluating proposed mining and other industrial projects to obtain regulatory approval and to help companies plan for responsible devel
Jan 1, 2012
-
Solid Cast Polymer Tunnel Segments: The Corrosion Resistant Solution for Sanitary Sewer TunnelsBy Richard A. Cubeta
Precast concrete segments have been used in sanitary sewer tunnel design for decades. Federal mandates (reduction in heavy metals and I & I), and system design changes (increased retention times) and
Jan 1, 2008