Alternative Final Cavern Linings For The East Side Access Transit Project

Society for Mining, Metallurgy & Exploration
Colin Barratt
Organization:
Society for Mining, Metallurgy & Exploration
Pages:
10
File Size:
1116 KB
Publication Date:

Abstract

The East Side Access (ESA) project is the largest underground rail infrastructure project under construction in New York City, USA. The Manhattan segment of the project is to be mined through rock and consists of 4.1 miles of Tunnel Boring Machine tunnels for track work and mined excavations to house rail switches, air plenums, and other rail facilities. This paper considers different methods for concrete lining, such as the use of fixed forms, adjustable forms, and pneumatically applied shotcrete. The advantages and disadvantages of these methods are discussed and the basis for considering one over the other are illustrated. Further discussions on design development and preparation of documents to facilitate quality and constructability in the field are presented.
Citation

APA: Colin Barratt  Alternative Final Cavern Linings For The East Side Access Transit Project

MLA: Colin Barratt Alternative Final Cavern Linings For The East Side Access Transit Project. Society for Mining, Metallurgy & Exploration,

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account