Borehole Hoisting For Shaft Sinking And Development At Brunswick Mining And Smelting Corporation Limited, Bathurst, New Brunswick

Society for Mining, Metallurgy & Exploration
W. R. Dengler R. S. Brown
Organization:
Society for Mining, Metallurgy & Exploration
Pages:
13
File Size:
841 KB
Publication Date:
Jan 1, 1976

Abstract

In 1974, Brunswick Mining and Smelting Corporation Limited started a 48 million dollar expansion programme at their property in Bathurst, New Brunswick. A portion of the expansion plans includes a 26 foot diameter 4,525 foot deep shaft, underground crusher and conveyor excavations and lower level access development. J. S. Redpath Limited was awarded the contract for the new shaft and associated rock work in May 1974. Brunswick Mining and Smelting Corporation Limited, a member of the Noranda Group, operate this 10,000 ton per day lead, zinc, copper plant with proven reserves in excess of 90 million tons. While most of the ore is provided by the underground operation at the Number 12 ore body, some tonnage is produced from the open pit at the Number 6 ore body. Long range plans indicate a phasing out of the open pit and an increase in production from the underground operation. Existing facilities at the underground mine could not provide additional tonnage, thus the requirement for a new shaft. (Figure 1) The new shaft will also provide access to ore below the 2,800 level which is currently the bottom level of the existing facility. The contract called for sinking a 26 foot inside diameter, nine compartment concrete shaft 4,525 feet deep (Figure 2). Station access and ramp development from existing workings would be required to the bottom of the new shaft. In addition, development work for new crushing and conveying facilities was needed simultaneous with the shaft sinking.
Citation

APA: W. R. Dengler R. S. Brown  (1976)  Borehole Hoisting For Shaft Sinking And Development At Brunswick Mining And Smelting Corporation Limited, Bathurst, New Brunswick

MLA: W. R. Dengler R. S. Brown Borehole Hoisting For Shaft Sinking And Development At Brunswick Mining And Smelting Corporation Limited, Bathurst, New Brunswick. Society for Mining, Metallurgy & Exploration, 1976.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account