8 M Diameter 7 KM Long Beles Tailrace Tunnel (Ethiopia) Bored And Lined In Basaltic Formations In Less Than 12 Months

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 13
- File Size:
- 652 KB
- Publication Date:
Abstract
On the 2nd of June 2007 SELI S.p.A. started the excavation of Beles Tailrace Tunnel (Ethiopia). The new 8,07 m diameter DS Universal TBM utilized for the tunnel excavation was manufactured by SELI S.p.A. and allowed the installation of 30 cm thick concrete lining, contemporaneously with the excavation of 7,200 m of tunnel. The greatest part of the tunnel alignment was excavated in hard and sound basal-tic rocks. The paper describes the main steps of the tunnelling operations which led to a remarkably rapid excavation, with a peak production of 36 m / day and a final break-through achieved 46 days ahead of the contractual deadline. Furthermore the paper describes the work and logistic organization that was set up to efficiently perform the mechanized excavation in the very remote area of the project.
Citation
APA:
8 M Diameter 7 KM Long Beles Tailrace Tunnel (Ethiopia) Bored And Lined In Basaltic Formations In Less Than 12 MonthsMLA: 8 M Diameter 7 KM Long Beles Tailrace Tunnel (Ethiopia) Bored And Lined In Basaltic Formations In Less Than 12 Months. Society for Mining, Metallurgy & Exploration,