    Analysis of Parameters of the Ground Vibration Produced by Bench Blasting at a Boron Open Pit Mine in Turkey

    By Gungor Tuncer, Ali Kahriman, Abdulkadir Karadogan, Mehmet Aksoy, Kagan Ozdemire

    With increasing environmental constraints on the levels of disturbance induced by blasting operations upon nearby residents, there is an increasing need to be able to design cautious blasting with gre

    Jan 1, 2005

  • ISEE
    Selection of Powder Factor in Large Diameter Blastholes (9dd28d4c-e692-46ff-9e71-b2043e0b42a0)

    By Jack Eloranta

    This paper documents the relationship between material handling and processing coete compared to blasting cost. The old adage, "The cheapest crushing is done in the pit", appears accurate in this c!as

    Jan 1, 1995

  • ISEE
    Use of Signature Hole Analysis for Blast Vibration Control at the Highvale Mine

    By Ron J. Elliott, Dylan Wedgewood

    A series of five signature holes were blasted at the Highvale Mine and the resultant seismic data was analyzed to make recommendations on how best to address neighbour complaints regarding blast vibra

    Jan 1, 2018

  • ISEE
    Part A: Structural Response from Surface Coal Mine Blasting on a Residential Structure; Part B: House Response from Blast-Induced Low Frequency Ground Vibrations and Inspections for Related Interior Cracking

    By John H. Weigand, Stephen V. Crum

    "VIBRONICS, INC. instrumented and monitored a residential structure for response to,blasting at aMidwestern surface coal operation. The residence was owned by the mining company and was extremely clos

    Jan 1, 1998

  • ISEE
    Blast Designs and Diagnostics Using Portable, Solid State, High-Speed Videography Systems

    By Bruce Vandenberg, R. Frank Chiappetta, John Foley

    Recent advances in solid-state, field portable, fast framing compact video camera systems and PC based frame capture hardware now allow blast imaging up to 1000 frames per second. Up to 4.1 seconds of

    Jan 1, 2000

  • ISEE
    Crystal Falls Dam Demolition and Protection Techniques Using an Air Curtain

    By Alex Chapman, Cam Thomas, Bryan Karney

    "During the early summer of 1989, Ontario Hydro removed a concrete portion of the North Channel Dam at Crystal Falls Generating Station by blasting and excavating in marine conditions. Because of the

    Jan 1, 1992

  • ISEE
    Pressures on Targets from Buried Explosions

    By L C. Taylor, H U. Lesiste

    This is a preliminary study of the statistical variation of the pressures on a target above a buried explosion. The data were taken at various distances from the charge centerline for three heights of

    Jan 1, 2010

  • ISEE
    Cautious Blasting in Critical Areas at Ramagundam Super Thermal Power Station

    By N. Jayaraman, V. Srikant, A. Radhakrishna

    Addition of a 500 MW unit to the existing units at Ramagundum Thermal Power Station requires blasting of large volumes of rock very close to sensitive installations like Turbo generator, Generator tra

    Jan 1, 2003

  • ISEE
    Blasting 1 Million Tons, 205 Meters from a Town

    By Thierry Bernard, Guy Gagnon

    Blasting at very close proximity to urban areas is typically a situation where both local communities and mining stakeholders get nervous. The context becomes logically even more tensed when the blast

    Jan 1, 2014

  • ISEE
    Advanced techniques using microscopy to quickly assess emulsion quality and stability.

    By G. Cavanough, A. Torrance

    Emulsions have been developed for over forty years to become the most common water-resistant explosives used in the mining industry. An emulsion is a common commodity, with many examples in our day to

    Jan 1, 2024

  • ISEE
    Deformation of An Explosively Driven Flat Metallic Flyer During Projection

    By Seokbin Lim

    In the design of explosives devices, an understanding of the behavior of explosively propelled matter is one of the most important steps in maximize the performance of these devices. For instance, an

    Jan 1, 2010

  • ISEE
    Blast Optimization of Hard Ores at Phu Kham Open Pit

    By Wayne Rogers, Kell Monro, Arthur Pacunana

    The Phu Kham Copper-Gold Operation (PKM) is a large-scale open pit mine located in northern Laos. It was developed and is operated by Phu Bia Mining Limited (PBM) a Lao-registered subsidiary company o

    Jan 1, 2018

  • ISEE
    Blast Site Security - International Society of Explosive Engineers 29th Annual Conference Safety Workshop February 5, 2003 Nashville, Tennessee

    By Unknown

    Blast Site Security Involves: * Clearing the area * Controlling Access * Warning Signals

    Jan 1, 2003

  • ISEE
    The New Progress in the BGRIMM Emulsion Explosives Technology

    By Wang Xuguang, Zhang Xiaozhi, Li Guozhong, Xiong Daiyu

    The emulsion explosive is a new kind of water-based industrial explosives that was developed at the end of 1960s. In the 1970s, BGRIMM invented EL-series emulsion explosive that created a new era of w

    Jan 1, 2003

  • ISEE
    Analyzing and Interpreting Blast Vibration Data Using New Windows-Based Software

    By Randall M. Wheeler

    Using Computer software to analyze and interpret blast vibration effects has never been so practical. Fully digital seismographs and powerful desktop and portable computers have led to the development

    Jan 1, 1994

  • ISEE
    Electronic Blast Initiation - A Practical Users Guide

    By John Watson

    New Technologies, New Challenges and New Opportunities For quite some time now, numerous explosive manufacturers have spent untold man-hours and millions of dollars trying to develop a blast initiatio

    Jan 1, 2003

  • ISEE
    Presplitting Techniques for Conventional, Air Deck and Dimension Stone Applications

    "The objective in controlled blasting is to reduce overbreak to control the final pit wall slope, shaft, drift ditch, bench, etc. to the final planned excavation limit. The six main types of controlle

    Jan 1, 1994

  • ISEE
    Experience with and benefits from the use of 3D Stereophotogrammetry for blast design and control

    By Peter Moser, Mark Ganster, Andreas Gaich

    Surveying of a bench face before blasting is a pre-requisite for a proper blast planning and for a satisfying blasting result both in terms of safety and fragmentation. When surveying a bench face, pr

    Jan 1, 2007

  • ISEE
    Back to the Basics; Nonelectric Initiation Shock Tube Systems, Part 2: General Applications

    By Larry Schneider

    I n the simplest application of a shock tube initiation system, the tubing acts as a “relay line” which passes a detonation signal from borehole to borehole. When the signal arrives at each borehole,

    Jan 1, 1995

  • ISEE
    Optimizing Quarry Blasting Techniques and Designs Over a Wide Range of Geologic Conditions

    By Victor C. Bryan

    One of the most sought after answers in any consideration of blasting activities relative to mines and quarries is how to safely and efficiently use explosives. While that discussion might be relative