Abstract
Addition of a 500 MW unit to the existing units at Ramagundum Thermal Power Station requires blasting of large volumes of rock very close to sensitive installations like Turbo generator, Generator transformer and Power cycle equipments. Levelling of the areas and excavations for footings are, therefore, to be carried out cautiously. The existing sensitive installations should be protected against ground vibrations and flyrock. The paper describes the details of a few of the many blasts carried out successfully wherein the ground vibrations were restricted and flyrock was avoided.