Selection of Powder Factor in Large Diameter Blastholes (9dd28d4c-e692-46ff-9e71-b2043e0b42a0)

International Society of Explosives Engineers
Jack Eloranta
Organization:
International Society of Explosives Engineers
Pages:
11
File Size:
252 KB
Publication Date:
Jan 1, 1995

Abstract

This paper documents the relationship between material handling and processing coete compared to blasting cost. The old adage, "The cheapest crushing is done in the pit", appears accurate in this c!ase study. Comparison of the accumulated cost of: powder, selected wear materials and electricity; indicate a strong. inverse correlation with powder factor (lbe powder/long ton of rock). In this case, the increased powder cost is more than offset by electrical savings alone.
Citation

APA: Jack Eloranta  (1995)  Selection of Powder Factor in Large Diameter Blastholes (9dd28d4c-e692-46ff-9e71-b2043e0b42a0)

MLA: Jack Eloranta Selection of Powder Factor in Large Diameter Blastholes (9dd28d4c-e692-46ff-9e71-b2043e0b42a0). International Society of Explosives Engineers, 1995.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account