    Three Mass Stabilization Phases in the West Harbor of Helsinki, Finland – Geotechnical and Environmental Properties of Mass Stabilized Dredged Sediments as Construction Material

    By Leena Korkiala-Tanttu, Noora Lindroos, Juha Forsman

    "Construction works at the Helsinki city sea shoreline requires dredging and handling of contaminated sediments. Most of these soft dredged sediments are regarded as too poor quality material for eart

    Jan 1, 2015

  • DFI
    New CIGMAT Downhole Penetrometer (DHP-CIGMAT) for Use During Drilled Shaft Construction (7493fc91-7396-4eac-bed2-0406570252cc)

    By Omer F. Usluogullari, C. Vipulanandan

    "It is critical to monitor the ground conditions during excavation and drilling of boreholes during construction to identify possible changes in the soil and rock formations. Drilled shafts are increa

    Jan 1, 2017

  • DFI
    Dcp Investigation Of Strength Increases In Polyurethane And Acrylate Treated Soils

    By Andreu J. Ferrero

    Polyurethane and acrylate resins are routinely injected into soils to gain strength and control water flow. However, most published data regarding strength gain is derived from laboratory samples crea

  • DFI
    Designing Piles for Seismic Events

    By H G. Poulos

    "This paper sets out a simplified approach by which the practical foundation designer can undertake the relevant calculations to satisfy the requirements for deep foundation design in seismic areas. T

    Jan 1, 1900

  • DFI
    Instrumented Hybrid Shoring System for a Deep Temporary Excavation Incorporating Cutter Soil Mixing in Vancouver, BC, Canada

    By Nadir Ansari, Brian W. Wilson, Marina S. W. Li

    "A hybrid shoring system consisting of cast-in-place soldier piles with Cutter Soil Mixing (CSM) infill panels was constructed for temporary support of a 19.8 m (65 ft) deep excavation in Vancouver, B

    Jan 1, 2017

  • DFI
    Extra Deep Cut-Off at 250 m Depth - A Case Study

    By Federico Pagliacci

    "Many existing dams are subject to underwater seepage due to subsoil conditions, like deep alluvial deposits or pervious rocks or karst. Remedial works are necessary in order to install new cut-off wa

    Jan 1, 2017

  • DFI
    Evaluation of Existing T-Z Models for Caliche Based on Numerical Analysis of Bi-Directional Load Tests Using NVShaft

    By Ramin Motamed, Fahim M. Bhuiyan, Raj V. Siddharthan, Joseph Toth

    The difficulty in material characterization and the erratic response of cemented soil layers, such as caliche in the Las Vegas valley, creates challenges for practicing engineers to reliably predict t

    Sep 8, 2021

  • DFI
    Impact Of Clay On Early Jet Grouting Strength

    By Debra F. Laefer

    Jet grouting is a ground improvement technique that has become widely adopted over the past three decades, yet relatively little data has been published about performance characteristics of mixes unde

    Jan 1, 2009

  • DFI
    Monitoring Auger Cast In Place Pile Construction And Testing In Hard Clay

    By C. Vipulanandan

    Installation procedure and the quality of the material used in the construction have significant effects on the behavior of the Auger Cast in Place (ACIP) piles. In this study, Installation and curing

  • DFI
    “Special Application Of Micro-Piles” For The Construction Of A Bridge Well Foundation

    By Nagarajkumar BV

    Pavai-and TeampT JV started working on the project T49A, Sumbar J & K State as part of slope and earth stabilization for ongoing Banihal - Katra Railway Connection Project. This project has several tu

    Nov 1, 2022

  • DFI
    Pile Load Testing in New York City

    By Joel Moskowitz, Jan Cermak

    "New York City has unique geologic conditions which must be considered when designing pile foundations. Where shallow foundations are not feasible, the City's subsurface conditions require a variety o

    Jan 1, 2005

  • DFI
    Recent Advantages of CDM-LODIC Method (Low Displacement and Control Method)

    By Yuji Yamashita, Kazuyoshi Kamimura, Tsuyoshi Takahashi, Naoya Matayoshi

    "The CDM-LODIC method (cement deep mixing - low displacement and control) method enables ground displacement to be reduced by removing an amount of soil equivalent to that of injected cement slurry an

    Jan 1, 2015

  • DFI
    Broadway Viaduct Design Phase Load Test Program For Post Grouted Shafts

    By Mike Muchard

    A design phase load test program was performed at the Broadway Viaduct bridge site to evaluate load carrying capacity and constructability of post grouted drilled shafts. The program included construc

    Jan 1, 2009

  • DFI
    Accuracy of Low-Strain Pile Integrity Test Results

    By Mahesh Hingorani

    Integrity issues for bored cast-in-situ piles have raised the need for the use of non-destructive tests to verify pile integrity and detect possible anomalies in installed pile sections that could adv

    Jan 1, 2019

  • DFI
    A Discussion Of Inconsistencies Between Lrfd And Asd Methods For Geostructural Design Applications Of The Aashto Bridge Design Specifications

    By Dimitrios Polantzas P. E., Collin E. Sweeney E. I. T., Franklin M. Grynkiewicz P. E., Leili Javidanian P. E.

    In the latest AASHTO design specifications, the Load and Resistance Factor Design (LRFD) method is prescribed for the design of retaining walls. However, inconsistencies arise when LRFD is used for re

    Oct 1, 2022

  • DFI
    Shoring of Long Beach Main Pump Station Utilizing Ground Improvement Methods, Long Beach, CA

    By Eric Lindquist, John Compagnone, Gabriel Carvajal

    "Condon-Johnson & Associates, Inc. (CJA) with the assistance of design consultant, Brierley Associates, designed and installed a water tight shoring system utilizing several ground improvement techniq

    Jan 1, 2017

  • DFI
    A New Data Interpretation Approach For Pile Thermal Integrity Testing

    By Quanchen Sun, Mohammed Z. E. B. Elsahife, Anthony Fisher, Chris Barker, Jennifer Schooling

    A review of the literature shows that pile integrity is a significant concern in pile construction. Recently, a new integrity test, thermal integrity profiling (TIP,) has been put into use in foundati

    May 1, 2022

  • DFI
    King?s Cross Station Re-Development Passive And Active Mitigation Of Tunnelling - Induced Settlement

    By Clif Kettle

    The paper will detail the design and execution of passive and active settlement control measures, the means adopted to overcome the various physical and operational constraints, and to meet specified

    Jan 1, 2008

  • DFI
    Strain Gauge Interpretation Using Automated Collection Systems and the Accuracy of Using Extrapolated Modulus vs Constant Modulus of a Pile, Along With the Importance of a Detailed QA/QC Program

    By Michael A. McNicholas

    "Deep foundations utilize the varying soil conditions to provide the most cost-effective or practical scope for a given jobsite. Once the scope has been determined and the engineering applied, the ele

    Jan 1, 2017

  • DFI
    Ground Freezing for Groundwater Cutoff at the Seattle Seawall Replacement Project

    By Brenton Cook, Daniel Mageau, Larry Applegate, Aaron McCain

    "Ground freezing was successfully used to create an impermeable barrier wall along 3,000 feet of the downtown Seattle waterfront as part of the Seattle Seawall Replacement Project. This $360 million r

    Jan 1, 2016