Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Prescriptive Specification Design: The Impact on Cost and Constructability – Case History

    By Shawna Munn, Nadir Ansari, Allison Bennett

    "This paper outlines how specification driven design has made Toronto Area transit infrastructure projects more expensive than similar private projects, and provides a case study of the results of an

    Jan 1, 2017

  • DFI
    Anchored Diaphragm Wall and Dewatering System for Libya Hotel

    By Claudio Asioli

    "The project’s goal was to construct the Al Ghazala Intercontinental, a multi-use development in the bay area of Tripoli overlooking the Mediterranean Sea. The site of the project is located approxima

    Jan 1, 2017

  • DFI
    Anchored Diaphragm Wall and Dewatering System for Libya Hotel

    By Claudio Asioli

    "The project’s goal was to construct the Al Ghazala Intercontinental, a multi-use development in the bay area of Tripoli overlooking the Mediterranean Sea. The site of the project is located approxima

    Jan 1, 2017

  • DFI
    Pile Foundations General - .1 Equipment information

    By Bengt H. Fellenius

    .1.1 Prior to commencement of pile installation operation, submit to [Engineer] for [approval] [review], details of equipment for installation of piles. SPEC NOTE: The information requested in 3.1

    Jan 1, 1991

  • DFI
    Hudson’s Revitalization: The Use of Robotics in the Work Place

    By Dave P. DeClerck

    Hardman Construction was faced with the challenge of completing a large earth retention project on a constricted downtown Detroit site, while maintaining a safe and productive worksite. To do so, new

    Jan 1, 2019

  • DFI
    Fresh Concrete Pressure in Cast In-Situ Bored Piles

    By Matthias Pulsfort, Hanna Nissen, Markus Herten

    An insufficient integrity of cast in-situ bored piles can lead to a reduction of the load bearing capacity and may require cost intensive repairs. Reasons for an insufficient pile integrity are linke

    Sep 8, 2021

  • DFI
    The Impact Of End Bearing Plate On Micropile Capacity Casted In Cohesive Soil

    By Soorkty Elarabi

    The aim of this paper is to discuss the impact of end bearing plate on the capacity of micropile. Preliminary studies have been made in Sudan in specific area of cohesive soil. Experimental works were

    Oct 1, 2022

  • DFI
    Large Scale Jet Grouting And Deep Mixing Test Program At Tuttle Creek Dam

    By Mario Mauro

    Tuttle Creek Dam was constructed by the U.S. Army Corps of Engineers in the 1950?s on the Big Blue River in north-east Kansas. Since the dam is located in a seismic area, the safety of the dam was re-

    Jan 1, 2008

  • DFI
    Evaluation Of A New P-y Analysis Tool For Lateral Analysis Of Drilled Shafts Using Load Tests In Nevada

    By David H. Sanders, Ramin Motamed, Fahim M. Bhuiyan, Raj V. Siddharthan

    Large-diameter drilled shafts (DS) are a critical part of a seismic-resistant system, and therefore it is important to be able to accurately model lateral resistance. To undertake the lateral load ana

  • DFI
    Engineering Successful Dewatering in Arid Urban Areas: Abu Dhabi Dewatering Guidelines

    By M. Melih Demirkan, Juan J. Gutierrez, Raghav Ramanathan

    "As the capital of the United Arab Emirates (UAE), Abu Dhabi is one of the world’s fastest-developing cities. To sustain its significant growth rate, Abu Dhabi must surmount challenging engineering pr

    Jan 1, 2017

  • DFI
    Pile Inspector's Guide To Hammers ? Introduction

    The pile inspector is a critical element in the quality control process necessary for a successful pile installation project. This guide is intended to provide the inspector with a basic understanding

    Jan 1, 1995

  • DFI
    Evaluation of Soil-Bentonite Backfill Consolidation Properties

    By Jeffrey C. Evans, Daniel G. Ruffing, Hejintao Huang

    Soil-bentonite slurry trench cutoff walls are the most common type of vertical cutoff wall used in the US for seepage control and for passive control of contaminant migration at environmental sites.

    Jan 1, 2016

  • DFI
    Case Study: Load Transfer Analysis on an Instrumented Augercast Pile Using EDC Strain Gauges and Geokon Rebar Strainmeters

    By Sastry Putcha, Santosh Mummaneni, Swamy Avasarala, Vamshi Vemula

    "This paper presents the results from a case study on the comparison of two strain acquisition instrumentation technologies, Geokon rebar strainmeters and Embedded Data Collectors (EDC) for the DC Wat

    Jan 1, 1900

  • DFI
    Case History: Large Diameter Micropiles for the Highway 53 Relocation Project

    By Nathan W. Iverson, David S. Graham, Paul J. Axtell

    "The Highway 53 relocation project in Virginia, Minnesota, involves construction of a very tall bridge across a currently inactive iron ore mine pit. The inactive pit is partially flooded and serves a

    Jan 1, 2017

  • DFI
    Augercast Piles - History And Advancements

    By Larry Rayburn

    Augercast piles evolved in the late forties from the process of pressure grouting open holes backfilled with stone. In 1956, a patent was issued for a cast in situ pile by pumping high pressure grout

    Jan 1, 2005

  • DFI
    Bi-Directional Testing Using Super Cells for the Jiaxing-Shaoxing River Crossing Bridge

    By Diane Reid, Antonio Marinucci, Robin Mao

    Super Cells are an innovative, open-shaped bi-directional static load testing device used to promote concrete flow during placement while utilizing greater cross-sectional area of the pile to achieve

    Jan 1, 2019

  • DFI
    Construction of a Very Flexibility, Impermeable, Bituminous Membrane Seepage Barrier, to Connect an Existing Concrete Dam Structure to a Newly Constructed Abutment Cut-Off Wall

    By Brian Wilson, Megan Atkinson, Richard Diggle, Nathan Sweeney

    "Ruskin Dam, located near Mission, British Columbia, was constructed in 1929 and 1930 and comprises of a concrete gravity dam structure founded on bedrock. At the right abutment, which consists mostly

    Jan 1, 2017

  • DFI
    Innovative Deep Foundation Support Using Ductile Iron Piles

    By Thomas Billups, Brendan FitzPatrick, Doug LeDo, David Carchedi

    "Working in urban environments presents unique logistical challenges beyond those typically associated with traditional geotechnical analysis and design. These challenges often include working on site

    Jan 1, 2016

  • DFI
    Design and Construction of Driven H-Piles for Landslide Stabilization in Marlboro Clay

    By Charbel Khoury, Kwabena Ofori-Awuah, Kofi B. Acheampong

    "Following heavy rains in spring of 2014, Prince George’s County officials issued a mandatory evacuation for homes in the Piscataway Hills subdivision of Fort Washington, Maryland where a landslide al

    Jan 1, 2017

  • DFI
    Optimization of Drilled Shaft Design for a Highway Bridge in Arizona Using Load Test Results (0a742001-9cf1-441f-b0fc-5890697ef97e)

    By John C. Niedzielski, A. Frances Ackerman

    The existing US-70 Bridge over the Gila River at Bylas, Arizona is planned to be replaced due to its current poor condition. The replacement bridge is planned to be a 15-span, 1,904-foot (580 meter) l

    Jan 1, 2017