Pile Design According to Eurocode 7, Highlights and DevelopmentsBy Adriaan van Seters
"Abstract The content of Eurocode 7 – Part 1 and Part 2 – with respect to piled foundations is outlined. The important role of pile testing is presented and the derivation of the characteristic value
Jan 1, 2014
-
Anchored Diaphragm Wall and Dewatering System for Libya HotelBy Claudio Asioli
"The project’s goal was to construct the Al Ghazala Intercontinental, a multi-use development in the bay area of Tripoli overlooking the Mediterranean Sea. The site of the project is located approxima
Jan 1, 2017
-
Anchored Diaphragm Wall and Dewatering System for Libya HotelBy Claudio Asioli
"The project’s goal was to construct the Al Ghazala Intercontinental, a multi-use development in the bay area of Tripoli overlooking the Mediterranean Sea. The site of the project is located approxima
Jan 1, 2017
-
Selecting the Right Shoring System – San Francisco ExperienceBy Heinrich Majewski, Rob Jameson
"Careful review of site conditions and constraints is essential to select the appropriate shoring system for each project. Key evaluation criteria include the geotechnical profile, groundwater and env
Jan 1, 2017
-
-
Rammed Aggregate Pier Group Load Test Results For Large Infrastructure Project In The Middle EastBy Brian Metcalfe, Kord Wissmann, Gianni Martinez
The Middle East consists of vast deserts that reach temperatures up to 50 degrees Celsius, with some areas characterized by endless sand dunes. When the project team selected the location for a large
May 1, 2022
-
Apportioning Risks On An Urban Deep Foundation ProjectBy Michael P. Balducci
Urban deep foundation projects contain unique risks that must be recognized by the parties involved. Common pitfalls must be recognized and avoided or addressed through contractual relations and corr
Jan 1, 2008
-
8000 Series Piling RigBy Roger A. Bullivant
The introduction of this size and type of piling rig is intended to address a multipurpose foundation activity. The 8000 denotes the size of equipment that is attached to the mast, namely 8000 Kg. Lar
Jan 1, 1995
-
Diaphragm Walls for Seepage Control and Remediation: Three Case HistoriesBy Fabio Santillán, Mario Mauro, Raffaella Granata
"This paper presents the utilization of slurry walls methods for the recent remediation of three high hazard active dams in the United States. Tuttle Creek Dam, located in Manhattan, KS, required seis
Jan 1, 2016
-
Pile Test Results - 1-15 Corridor Reconstruction Project, Salt Lake City, Utah (Abstract Only) - DFI Member Conference - Seattle, 1998By D. M. Holloway
As a part of the 1-15 Reconstruction Project, static and dynamic (high-strain) testing methods formed the basis to estimate long-term axial capacities, and to assess the magnitudes of bearing capacity
Jan 1, 1998
-
Optimization of Drilled Shaft Design for a Highway Bridge in Arizona Using Load Test Results (0a742001-9cf1-441f-b0fc-5890697ef97e)By John C. Niedzielski, A. Frances Ackerman
The existing US-70 Bridge over the Gila River at Bylas, Arizona is planned to be replaced due to its current poor condition. The replacement bridge is planned to be a 15-span, 1,904-foot (580 meter) l
Jan 1, 2017
-
Building Above And Excavating Below An Iconic Building In ManhattanBy John S. Civetta, Seth Martin, Marc J. Gallagher, Arthur J. Alzamora, Ronald Peralta
The Crown Building, built circa 1921, is a 26-story iconic building located at West 57th Street and Fifth Avenue in the heart of Manhattan. The paper highlights collaboration between the geotechnical
-
Determination of Coefficient of Modulus of Sub-Grade Reaction for Free Head Short PileBy Sumit Kumar Biswas, Moyukh De, Sibapriya Mukherjee
"The piles often are also subjected to lateral (horizontal) forces and moments. In fact, there are some structures where the primary function of piles is to transfer lateral loads to the ground. Prope
Jan 1, 2015
-
Bi-directional Load Testing Using Donut Super Cells For Hangzhou West Railway StationBy Antonio Marinucci, Robin Mao
The new Hangzhou West Railway Station, which is currently in the early stages of construction, will be located in the city of Hangzhou, China. To accomplish the ambitious goals of the project, the con
-
Design and Construction of the New VDOT Midtown TunnelBy Rick Ellman, Ian Chaney
"The Hampton Roads area encompassing the Norfolk, Virginia Beach and Newport News metropolitan region experiences some of the worst traffic congestion in Virginia. With continued growth of the ports a
Jan 1, 2014
-
CFA Secant Piling In CaliforniaBy Philip Derbyshire, Dale J. Scheffler
"Continuous Flight Auger (CFA) piling is a variation of Augered Cast-In-Place (ACIP) or augercast piling. In both cases a continuous auger with a hollow stem is used to drill a hole and a pile is form
Jan 1, 2005
-
Prediction of Axial Geotechnical Resistance of Base Grouted Drilled ShaftsBy Emad Farouz, Ehab S. Shatnawi
"The increasing demand for small deformations and high-capacity drilled shafts without enlarging drilledshaft diameters has motivated the development and increasing use of a base grouting (BG) techniq
Jan 1, 2016
-
Micropiles below Groundwater at the South Auditorium Block Site, Buffalo, NYBy Mary C. Nodine, Michael P. Walker, Paul Eggers, Donald E. Aubrecht
The CANALSIDE commercial development in Buffalo, New York serves to revitalize the former site of the Buffalo Memorial Auditorium, adjacent to Lake Erie. The Auditorium was constructed in 1940 and fou
Jan 1, 2018
-
Design Solutions for Seepage End-Around-Effects at Cutoff Wall Depth TransitionsBy Michael Hughes, Selva Selvamohan, Ray Costa
"Cutoff walls are commonly used to mitigate underseepage problems for levee remediation projects. At abrupt changes in seepage cutoff wall depths there is a potential for water to flow around the back
Jan 1, 2015
-