Levee Rehabilitation, Lower Wood River Phase II– East Alton IL. Deep Cutoff WallBy Gene Bryant, Wesley Schmutzler, Matteo Bertoni
The levees where the Mississippi River and the Lower Wood River meet near East Alton Illinois have been a problem area for years due to underseepage. The first phase of the deep cutoff wall was a 2,00
Jan 1, 2019
-
Energy Geostructures: Analysis from Research and Systems Installed Around the WorldBy Tony Amis, Marco Barla, Alice Di Donna
"Energy geostructures are becoming an increasingly popular solution around the world for Developers looking to reduce CO2 and system running costs. Energy geostructures are geotechnical structures tha
Jan 1, 2017
-
Installation and Efficiency of Common Helical Pile CouplingsBy Jason Herron, Joseph Brown
The common couplings for joining sections of helical piles with an outside diameter of 6.625 inches and 8.625 inches are square on square, flange to flange, external pipe sleeve, internal pipe sleeve,
Jan 1, 2019
-
Helical Piles With Grouted Shafts - A Case HistoryBy Shawn Downey
A helical pile with in-situ grouted shaft was used to underpin the existing slab of a large retail store in the Edmonton, Alberta Canada area. The existing structural slab did not have the capacity to
Jan 1, 2003
-
Economic Design Of Piling Platforms On Coarse Grained SubgradeBy Patrick Wong
The design of piling platforms is addressed in BRE (2004) for both fine grained and coarse grained subgrades. However, for coarse grained subgrades, piling platform designs can often be overly conserv
Nov 1, 2022
-
Underpinning Historic Museum for U-505 Submarine RelocationBy Goudschaal Mark R.
"The Museum of Science and Industry U-505 Submarine Relocation project in Chicago, IL consisted of building an underground reinforced concrete vault (37' deep) for the Museum's new U-505 exhibit. This
Jan 1, 2005
-
Cyclic Degradation on Wind Turbine Foundations in Cohesive SoilsBy Yazen Khasawneh, Osvaldo P. M. Vitali, Mohammad Nassim
Wind turbines are subjected to complex form of cyclic loadings with variable amplitudes and frequencies. The cyclic loading and the accumulation of plastic strains with the number of cycles will resu
Sep 8, 2021
-
Foundation Challenges And Innovative Solutions: The Wharf Phase 2, Washington, DcBy Aaron L. Sacks, David R. Good, Srinivas Yennamanda, Joseph K. Carey
Construction of Parcels 6 and 7, the second phase of The Wharf, began in 2019 and geotechnical construction was completed by December 2020. The overall project consisted of horizontal site, parks, and
Oct 1, 2022
-
CPT Methods for Helical Pile DesignBy Howard A. Perko, Margaret Dring, Gerald Verbeek, Scott Slaughter
Helical piles have become a widely used deep foundation system in recent years due to their many inherent advantages. The cone penetration test (CPT) is commonly used in geotechnical practice to evalu
Sep 8, 2021
-
Design of Pile Foundation for Tall Railway Bridges in North-East IndiaBy Sumantra Sengupta
"Northeast Frontier Railway (NF Railway) intends to connect Imphal, the capital of Manipur (bordering Myanmar) with Assam by railway link. They have planned a 125km long railway line that passes throu
Jan 1, 2015
-
The Need For Air Control In Down The Hole Hammer Casing Advancement DrillingBy Frank J. Purcell
“Down The Hole” (DTH) hammer drilling is often necessary to advance the casing during pile construction where the test bores have determined difficult drilling conditions with obstructions such as bou
Nov 1, 2022
-
Case Study: Stability Analysis for an Existing Bridge Experiencing Riverbank ErosionBy Brandon Smith, William Bohlen
Riverbank erosion along the Brazos River has modified the structural support conditions for an existing bridge structure in Southeast Texas. The 8-span, 1,200-foot long bridge was completed in 1992 al
Jan 1, 2019
-
A Case Study - Drilled Pier Foundations for a New Atlanta StadiumBy Jean Wehbe, Daniel C. Brahana
"This paper presents a case history of drilled pier construction for a new stadium in Atlanta, Georgia. The stadium structure is supported on several different foundation types, with the heaviest ""me
Jan 1, 2017
-
Re-Use Of Old Pile Foundations In AmsterdamBy Remco Offenberg, Marcel Bielefeld, Martijn van Delft
The question of the continued suitability of existing foundations arises when the function of the superstructure changes. This can occur when the superstructure is replaced or when the existing struct
May 1, 2022
-
Data Drives Herbert Hoover Dike (Hhd) Rehabilitation EffortsBy Michael Arnold, Jignyash Manyam, Yoav Rappaport
The USACE required construction of over 13 miles of cutoff wall at an average depth of 65 feet for the Herbert Hoover Dike (HHD). To meet project requirements, to provide quality control and make soun
Oct 1, 2022
-
Caisson Foundations For Mississippi River Bridges In The New Orleans AreaBy William B. Conway
This paper will describe the large caisson pier foundations for four of the bridges crossing the Mississippi River in the New Orleans area; and will discuss some of the unusual problems encountered du
Jan 1, 2013
-
The FHWA Geotechnical Program for 2017"Every year during the Transportation Research Board (TRB) Annual Meeting in Washington D.C., the Federal Highway Administration (FHWA) National Geotechnical Team (NGT) takes time to talk about what w
Jan 1, 2017
-
Innovative Integrated Jet Grout And Contiguous Cfa Piled Solution For Complex Deep Shoring Wall In Soft Soils – Retaining Structural Design And AnalysisBy W. L. Chong, Y. Zou
There are many types of Earth Retention Systems (ERS) available in the market where more than one method can be a feasible solution for a project. This paper examines the design and construct process
Nov 1, 2022
-
Capitol Complex Phase 1 ExpansionBy Eric S. Lindquist, Charles A. Luxford
The State of Texas recently adopted a master plan to expand the existing Capitol Complex in Austin. Phase 1 of this expansion will add two new State office buildings and five levels of underground par
-
Washington Avenue Tunnel Project: Fortifying Aging Underground InfrastructureBy Andrew R. Klaetsch, Peter W. Deming
"The Washington Avenue tunnel in Kingston, NY was completed in 1912 to convey combined storm water and sanitary sewage. Over a mile in length, the tunnel was driven almost entirely in bedrock, with th
Jan 1, 2016