Anchored Excavation Support Using SMW (Soil Mixed Wall)By Seth L. Pearlman
A major excavation support case history for the Eastern approach to the Third Harbor Tunnel (THT) in Boston, MA is described, which uses an anchored Soil Mixed Wall (SMW). Both general and project spe
Jan 1, 1993
-
Technical VisitBy the courtesy of Metropolitana Milanese (Milan Underground), roost of the delegates visited on April 12, 1991 the tunnel of "PORTA VENEZIA" STATION of MILANO RAILWAY LINK. The "PORTA VENEZIA" ST
Jan 1, 1994
-
Estimation of Shaft and Base Responses from Pile Load TestBy Vidyaranya Bandi, Madhav Madhira, Kota Vijay Kiran
"Using hyperbolic relationships for the non-linear responses of shaft and base resistances, a method is proposed for estimating initial shaft and base stiffnesses and ultimate shaft and base resistanc
Jan 1, 2017
-
Structural Seismic Design Of Fashion Island Boulevard Bridge Earthquake Repair State Bridge No. 35C-160 San Mateo, California - 1 Assessment Of The Existing BridgeBy Roy M. Schnabel
The Fashion Island Boulevard Bridge over the Marina Lagoon in San Mateo, California is an eight span precast, prestressed concrete girder bridge. It is approximately 495 feet in length and 61 feet in
Jan 1, 1993
-
Test Pile Program Carrier Pier And South Wharf Naval Station Puget Sound Everett, WashingtonBy David G. Winter
The first test pile for the carrier pier and south wharf at NAVSTA Puget Sound was driven on December 27, 1989, and the final pile was tested on February 26, 1990. Implementation and modification of t
Jan 1, 1990
-
Recommendations For Implementing And Interpreting NonDestructive Integrity Testing Of Cast In-Situ Concrete Piles And Diaphragm Walls.By Jose L. Garcia
The following document aims to cover all issues concerning the three main methods employed for the in-situ survey of concrete pile integrity. Within it are described both sonic coring and low-stra
Jan 1, 2006
-
Ground Vibrations from Pile and Sheet Pile Driving Part 2 — Review of Vibration StandardsBy K. Rainer Massarsch, Bengt H. Fellenius
"Abstract Vibration limits for buildings with respect to ground vibrations from pile driving published in international standards are reviewed. At first, relevant vibration parameters are defined and
Jan 1, 2014
-
Application Of Augered, Cast-In-Place Displacement (ACIPD) Piles In New York CityBy Willie M. NeSmith
Conventional augered, cast-in-place (ACIP) piles were introduced into the New York City area as a result of the damage to existing structures caused by pile driving operations. ACIP piles are often sp
Jan 1, 2004
-
-
Army Corps of Engineers Seepage Control Cutoffs for Dam and Levees Engineering Manual (EM)By David B. Paul
"ABSTRACTThe US Army Corps of Engineers (USACE) has 704 dams in their inventory and over 100,000 miles of levees with a capital value of over $150 billion. Currently, there are 319 dams that are class
Jan 1, 2014
-
Diaphragm Walls for Seepage Control and Remediation: Three Case HistoriesBy Fabio Santillán, Mario Mauro, Raffaella Granata
"This paper presents the utilization of slurry walls methods for the recent remediation of three high hazard active dams in the United States. Tuttle Creek Dam, located in Manhattan, KS, required seis
Jan 1, 2016
-
111,000m Of Continuous Flight Auger Piling For LNG Tank Bases In Poor Alluvial Soils, Isle Of Grain, UKBy Shane Baker
Cementation Foundations Skanska Ltd encountered many significant challenges in designing and constructing the foundations for the LNG (Liquefied Natural Gas) tanks and associated structures at the Isl
Jan 1, 2006
-
Argosy Casino Expansion: Open Cell Sheet Pile® Harbor ProjectBy Michael Lane
With the success of their existing casino operation on the Ohio River in Lawrenceburg, Indiana, the Indiana Gaming Co., LP planned a major expansion of the current facilities. This expansion includes
Jan 1, 2008
-
Ground Support And Its ToolboxBy G. Sauer
"More Skill is needed to avoid rather than to handle heavy ground loads." This finding, from a tunneling engineer of the nineteenth century, is still relevant today with all advanced sequential excava
Jan 1, 2003
-
The Analysis Of Results From Routine Pile Load TestsBy Bengt H. Fellenius
THIS PAPER deals with the analysis of results from axial testing of vertical single piles, i.e. the most common field test per-formed. Despite the numerous tests which have been carried out and the ma
Jan 1, 1988
-
Continuous Flight Auger Piles In The Blue Ridge: A Case Study Using Instrumentation In Pile DesignBy Jesse R. Jacobson
A large casino complex in Cherokee, North Carolina recently underwent a $633 million expansion that involved substantial foundation challenges. The site is located in a valley on the southern edge of
Jan 1, 2011
-
Deep Foundations In Karst - Lessons Learned From I-40 Corridor Widening In Knoxville, TennesseeBy James L. Vinson
Wilbur Smith Associates (WSA) has provided planning, engineering and construction oversight assistance to the Tennessee Department of Transportation (TDOT) for three construction projects intended to
Jan 1, 2006
-
Risk Mitigation Strategies For Cut And Cover Tunnels At The Mitchell InterchangeBy Mark Maday
As part of the I-94 North-South Corridor reconstruction program, the Wisconsin Department of Transportation (department) is reconstructing the Mitchell Interchange in Milwaukee, Wisconsin. Located o
Jan 1, 2011
-
Comparison of Static and Dynamic Load Tests on Bored Piles in Glacial SoilBy Matthias Baeßler, Markus Herten, Ernst Niederleithinger, Steven Georgi
"Abstract: BAW and BAM have performed a large scale comparison and calibration test on static and dynamic load capacity evaluation of bored piles in glacial sandy soil. The test was performed using ei
Jan 1, 2014
-
Deep Open Excavation In Chicago Downtown Area For Red Line And Blue Line Subway Connection At Block 37By Gordon Chen
The Block 37 Chicago Transit Authority (CTA) Tunnel Construction Project was originally designed by STV to connect Blue Line subway in North Dearborn Street and Red Line subway in State Street in the
Jan 1, 2009