Technical Visit

Deep Foundations Institute
Organization:
Deep Foundations Institute
Pages:
5
File Size:
2551 KB
Publication Date:
Jan 1, 1994

Abstract

By the courtesy of Metropolitana Milanese (Milan Underground), roost of the delegates visited on April 12, 1991 the tunnel of "PORTA VENEZIA" STATION of MILANO RAILWAY LINK. The "PORTA VENEZIA" STATION will be the most important in the link and it will he also the largest underground project of the whole railway transport network in Lomhardy. The particular conditions of the soil and the collocation of site in the center of Milano have required new technologies and the technical solution applied to this job is called "Cellular Arch Method" by its designer Prof. P. Lunardi. Our sincere thanks go to Prof. P. Lunardi and Eng. E.M. Pizzarotti of Rocksoil, Milano who have kindly furnished us a technical description of this method. Eng. Pizzarotti was the guide during the visit and gave all the technical explanations to the delegates. THE "VENEZIA" STATION IN THE 2PB SECTION OF THE RAILWAY LINK The excavation of cavities in loose ground, exceeding a certain dimension and at shallow depth, is not feasible using traditional methods: in fact it is not possible to consolidate the ground around the cavity in such a way that homogeneity and resistance is sufficiently guaranteed.
Citation

APA:  (1994)  Technical Visit

MLA: Technical Visit. Deep Foundations Institute, 1994.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account