Mitigating Subsidence Influences on Residential Structures Caused by Longwall Mining OperationsBy Yi Luo
The severity of disturbances caused by longwall mining subsidence to various residential structures can be re¬duced. The success of such mitigation efforts depends on accurate subsidence prediction, c
Jan 1, 2003
-
Optimization Of District-Wide Mine Layout In Multi-Seam Mining: A Case StudyBy Huamin Li
Mine # 8 of Pindingshan Coal Group, Henan Province, China has an annual production 2 million metric tons. But it encounters many problems, e.g. mine layout is complicated, roadway maintenance is diffi
Jan 1, 2000
-
Comparative Case Study Of Yielding And Critical Coal Pillar Designs In Bump-Prone StrataBy J. R. Koehler
The failure of yield pillar-based gate mad designs to provide adequate ground control performance is primarily related to the use of "critically" sized chain pillars. A "critical" pillar is one that f
Jan 1, 1995
-
Understanding the Causes of Roof Control Problems on a Longwall Face From Shield Monitoring Data ? A Case StudyBy Robert Trueman
This paper details the results of an assessment aimed at understanding the shield loading mechanisms associated with strata-related issues on a longwall face. Shield load cycle analysis theories devel
Jan 1, 2011
-
Investigations Of Underground Coal Mine BurstsBy K. Haramy
Coal mine bursts or bumps involve the violent, rapid failure of coal and rock in or around a mine excavation. Failure is normally associated with high stress and brittle or brittle-elastic materials;
Jan 1, 1984
-
Longwall Mining-Induced Abutment Loads and Their Impacts on Pillar and Entry StabilityBy Jinsheng Chen
Longwall mining-induced abutment loads on the surrounding coal pillars can be grouped into two categories in terms of the relative position of the coal pillars and the longwall face. They are the fron
Jan 1, 2002
-
Mistakes, Misconceptions, and Key Points Regarding Secondary Roof Support Systems (b87a5324-ac75-480a-90d7-e642733c14a4)By Thomas M. Barczak
Roof support systems are necessary to provide stable mine openings and much research has been conducted to design a variety of roof support systems that will function in various manners to ensure that
Jan 1, 2001
-
The Broken Rock Zone Around Tunnels And Its Support TheoryBy Fangting Dong
The broken rock zone (BRZ) and the tunnel support theory are investigated. The relationship between the BRZ and the related factors, the interaction between the BRZ and supports, and the function of s
Jan 1, 1988
-
Reinforcement of Large Pillars by Bolting (8821999e-4c04-46db-a69e-e7a56781ac96)By S. J. Mitchell
An analysis of bolting reinforcement of several large [approximately 18 m (60 ft) cube] pillars was performed. The many overcoring stress profiles in pillars at the mine were used to produce generaliz
Jan 1, 1984
-
Geo-Mechanical Property And Failures Of Weak Roof Shales In Coal MinesBy Yunqing Zhang
Weak shales refer to those with lower strength, thinly- laminated structure, sensitivity to moisture and weathering as well as significant time dependent behavior. It has been said that many future co
Jan 1, 2004
-
Use of a Laser Grid System for Accurate Roof Bolt LocationBy William Kendall
"A tremendous amount of research, analysis, and engineering time is used to design a proper roof support system including the type, length, and location of the roof bolts. Unfortunately, since the roo
Jan 1, 2016
-
Bailey Mine Slurry Impoundment Longwall Subsidence MonitoringBy Richard J. Perin
Subsidence monitoring was conducted in proximity to the 1-A and 2-A longwall panels at Consol Pennsylvania Coal Co.'s (CPCC) Bailey Mine slurry impoundment. Monitoring fullfills federal Mine Safe
Jan 1, 1988
-
Failure Modes Of Mine Tunnels In Stratified Rock Structures With Reference To Stress Field ConditionsBy Hui Chen
The paper describes the use of a physical model technique to investigate the failure modes of mine tunnels with reference to the in situ stress field. The characteristics of stratification commonly en
Jan 1, 1993
-
Longwall Mining-Through the Backfilled In-Panel Entries at Cyprus Emerald MineIn recent years, improvements made to the longwall system have accelerated at a faster pace than those made to the gate entry development system. As a consequence, unless planned years ahead of time,
Jan 1, 1997
-
Multiseam Mining On South African CollieriesBy R. W. Hill
Multiseam mining has been carried out at many collieries in South Africa. It the seams are In close proximity difficult and dangerous mining conditions may arise. In the Witbank area multiseam bord an
Jan 1, 1995
-
Causes of Massive Directional Roof Falls in Room and Pillar Mines - Two Case StudiesBy S. S. Peng
In recent years many roof falls have been conveniently attributed to the adverse existence of a high horizontal stress. The normal practice of not conducting a follow-up study in a roof fall investiga
Jan 1, 1999
-
The Stress And Failure Paths Followed By Coal Mine Roofs During Longwall Extraction And Implications To Tailgate SupportBy Ross Seedsman
Discussion on the design of roof support in tailgates has often been conducted without a clear statement of the stress and failure conditions acting. There is general agreement that in the tailgate th
Jan 1, 2001
-
Analysis of a Stability Problem in an Underground Coal Mine Due to Floor ConditionsBy M Nombe
Based on the analysis of a case study at POWELTON No.2 MINE, it was determined that mine stability problems had occurred due to floor softening. A fireclay (underclay) layer in the immediate floor was
Jan 1, 2002
-
Sidewall Fracturing In Coal Room And Pillar And Pillar Extraction Panels (fdea63a5-d54d-46e2-aad5-6c4f1c72e2f1)By André Vervoort
In coal room and pillar, and pillar extraction panels, the sidewall conditions were investigated based on underground measurements and numerical simulations. Three-dimensional linear elastic models pr
Jan 1, 1992
-
Comparison of Some Aspects of Bolting Mechanisms Between Fully-Grouted Resin and Tensioned Bolts in Underground Mine EntriesBy Asmaa Yassien
Finite element models were developed to study the effect of tensioned and fully-grouted bolts on the stability of the mine opening in a three-entry development system using a typical geological column
Jan 1, 2002