Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Critical hydraulic pressure forecasting of water inrush in coal seam floors based on a genetic algorithm-neural network

    By T. Liu, C. Shi, T. Fu, M. Zhong

    Water inrush in coal mines is induced by the imbalance of the groundwater flow field and the engineering geo-mechanics field. Therefore, to prevent water inrush it is important to predict the critical

    Jan 1, 2008

  • CIM
    Mine Reclamation in a Changing Regulatory Environment

    By David H. Searle

    This paper will discuss the common trends existing in various Canadian jurisdictions for the closure and reclamation of mines. Included will be a discussion of the requirement to post security as well

    May 1, 2006

  • CIM
    Dust Control at Granisle Copper

    By L. W. Hamel

    "DUST CONTROL - GRANISLE COPPER LIMITEDINTRODUCTIONGranisle. Copper Limited is located in the north-central region of the Province of British Columbia, approximately 200 road miles north-west of Princ

    Jan 1, 1976

  • CIM
    Dust Collection Methods for Primary and Secondary Crushing (NOVEMBER 21, 1975 )

    By D. Ingram

    "PRIMARY DUST COLLECTOR A. 42,000 CFM James Howden Fan Z-6 Size 3650 Fan Dia 40"" HP 75It was found that the fan was not large enough to remove the air that was displaced by the trucks dumping. So it

    Jan 1, 1976

  • CIM
    Nickel production from low-iron laterite ores: Process descriptions

    By R. A. Bergman

    "Process descriptions are provided for the following ten plants that treat high-magnesia lateritic nickel ores (saprolite) by pyrometallurgical means: PT Aneka Tambang; Cerro Matoso S.A.; Falconbridge

    Jan 1, 2003

  • CIM
    Stress Development During Post Cure of Eb Curable Composites

    By D. Djokic

    One of the most attractive features of electron beam curing as a process for manufacturing composite structures is the potential for attaining very low levels of residual stress as compared to thermal

    Jan 1, 2006

  • CIM
    The Polaris Process Barge (413f976a-6a5f-4235-9531-1db4119721bb)

    By J. K. Gowans

    "INTRODUCTIONTo bring a mining property into production in the Canadian High Arctic a company must deal with the harsh environment, the short shipping season and the high cost of labour. In trying to

    Jan 1, 1983

  • CIM
    Feasibility of Tailings Reclamation for Underground Paste and Hydraulic Backfill Applications

    By K. Tarr

    Acid-producing mine tailings are present at many active and inactive mine sites and pose an environmental liability due to the potential for acid rock drainage. Acid rock drainage originating from a t

    Aug 1, 2013

  • CIM
    Understanding Single Particle Breakage Event to Evaluate the Effect of Applied Strain Rate

    By Fatemeh Saeidi, Luis Marcelo Tavares, Malcolm Powell, Mohsen Yahyaei

    "Understanding a single breakage mechanism is fundamental to the development of breakage testing techniques appropriate for mechanistic modelling of any breakage equipment. In the light of this insigh

    Jan 1, 2016

  • CIM
    Improving mining and minerals plant performance: operations and maintenance working together using new information technology

    Operations and maintenance departments have had a long-standing adversarial relationship. The widespread evolution and adoption of modern management techniques, such as reliability centered maintenanc

    Jan 1, 2009

  • CIM
    Improvement of Mass and Value Balance data from the Statistical Benchmark Model

    By Cecilia Arrue, Dominic Fragomeni, N. O. Lotter

    "A statistically designed benchmark mill survey was carried out in July 2005 at the Kidd Creek Concentrator, D Division circuit, which processes Ni/Cu ore from the Montcalm deposit. A structured stati

    Jan 1, 2007

  • CIM
    Toppling failure — A proposed analytic solution

    By J. I. Mathis

    "The failure that was utilized for developing this model was a double bench-scale failure, approximately 20 m in height, in the Misery pit at BHP Billiton’s EKATI mine site. The bench that failed was

    Jan 1, 2004

  • CIM
    Gravity Concentration of Gold from Base Metal Flotation Mills

    By M. Ounpuu

    "Gold, because of low head grade and recovery, is usually of minor importance in the economics of base metal flotation mills. Because of the above little metallurgical attention is usually provided to

    Jan 1, 1992

  • CIM
    Ore Processing Business Experiences in Russia 2005-7

    By John Starkey

    "During the period June 2007 to March 2007, John Starkey of Starkey & Associates (Starkey) worked in Russia for High River Gold, supervising the engineering design work that was being done at the IRGI

    Jan 1, 2008

  • CIM
    Optimisation des systèmes pelles–camions en utilisant la théorie des files d’attente

    By D. Komljenovic, J. Paraszczak

    "This paper presents the use of queuing theory in truck fleet sizing in open pit mining operations. In the first part, a methodology is developed by which an optimal ratio between the size of shovels

    Jan 1, 2004

  • CIM
    Optimization of shovel-truck systems using the queuing theory - Optimisation des systèmes pelles?camions en utilisant la théorie des files d?attente

    By D. Komljenovic

    This paper presents the use of queuing theory in truck fleet sizing in open pit mining operations. In the first part, a methodology is developed by which an optimal ratio between the size of shovels a

    Sep 1, 2004

  • CIM
    Leaching Practice at Denison Mines an Historical Review

    By E. LaRocque

    "Denison Mines Limited has been processing uranium ore in the Elliot Lake area since May of 1957. The ore body is located i11 the Huronion sediments on the north limb of the Quirke Lake syncline. Mine

    Jan 1, 1979

  • CIM
    Changes to drill pattern and adequate inter-row delay time improve blasting performance (1255a8ec-f486-4f0e-a99f-bee3df1f60e5)

    By P. H. Oliver

    "The current theory of how explosives fracture rock offers no explanation for the improvements in fragmentation and the reduction of fly rock and back break which occurs when an adequate inter-row del

    Jan 1, 2003

  • CIM
    Changes to drill pattern and adequate inter-row delay time improve blasting performance

    By P. H. Oliver

    The current theory of how explosives fracture rock offers no explanation for the improvements in fragmentation and the reduction of fly rock and back break which occurs when an adequate inter-row dela

    May 1, 2003

  • CIM
    MAC and the AFN: Taking Up the Corporate Challenge

    Taking Up the AFN Corporate Challenge ?? About MAC ?? ?Towards Sustainable Mining? ??Mining and Aboriginal Peoples Framework ?? AFN-MAC Relationship ?? A New MAC Northern Initiative ??Social and

    May 1, 2009