Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    WIPFRAG - A Breakthrough in Fragmentation Measurement

    By John A. Franklin, Tom C. Palangio, Norbert H. Maerz

    No blast evaluation is complete without fragmentation measurements which until now were inaccurate, costly, time consuming and created delays in production. “WipFrag.s”is a fully automated PC based fr

    Jan 1, 1995

  • ISEE
    Increasing Productivity Through Field Control and High-Speed Photography

    By David G. Borg

    "Although researchers have realized varying degrees of success in numerics modeling, computer blast simulations and small scale in-situ testing, most will agree that the greatest uncertainty in total

    Jan 1, 1989

  • ISEE
    An Automated Approach to Blast Optimization Through Performance Monitoring of Blast Hole Drills and Mining Shovels

    By M Scoble

    This paper will report on the application of data collected through the performance monitoring of large diameter surface rotary blasthole drii and electric mining shovels, in an integrated approach to

    Jan 1, 1992

  • ISEE
    ROCSCAN: A Multipurpose Geomechanics Instrument

    By D Frantzos, J J. Cotter, H Tammemagi, J B. Codrington, J Kaasalainen, A C. Webster

    "Exploshres Technologies International (ED) is developing an instrument called ROCSCAN which isplanned to have broad application in both blasting and rock mechanics. The purpose of this paper is to ou

    Jan 1, 1989

  • ISEE
    Security and Control (476c288e-1831-4c21-a747-ee41961667e9)

    By Jim Mikelait

    Overview ?? Why do we need security? ?? Needs assessment ?? Elements to any security system ?? Protect, Detect, Alert, esponse ?? Electronic Security System Criteria ?? Advantages and Limitations of

    Jan 1, 2006

  • ISEE
    CEE BEE ZERO TWO Construction to Destruction - A Case Study

    By Deepak Vidyarthi

    This paper deals with various measures adopted in protecting a conveyor duct (named after a Conveyor Belt that was numbered as ‘02’) housing a 1600 mm (63 inches) belt conveyor system in a large, heav

    Jan 1, 2008

  • ISEE
    Electronic Detonators and Lightning

    By J. Lindenau

    One of the significant benefits of electronic detonators is their safety, especially their relative insensitivity to extraneous electrical energy. The various brands of electronic detonators on the ma

    Jan 1, 2008

  • ISEE
    Concepts for Better Blasting

    By William Reisz

    Over the years as surface mining operations have become more sophisticated, angle drilling has become a more popular blast design technique, especially in areas where overburden and stripping ratios h

    Jan 1, 2002

  • ISEE
    Measuring and Analysing Percussive Pulses to Extend Depth in Top-hole Percussion Drilling

    By Gary Cavanough, Stuart Addinell, Hector Parra

    Drilling deep, straight, accurate holes in hard rock to achieve efficient blasting is a challenge for the mining/quarrying industries with short holes normally drilled using “top hole hammer” (THH) an

    Jan 1, 2013

  • ISEE
    Modeling Effect of Delay Scatter on Peak Particle Velocity of Blast Vibration Using a Multiple Seed Waveform Vibration Model

    By R Yang, M Lownds

    This paper reports studies showing the effects of delay scatter on the peak particle velocity (PPV) of blast vibration using a multiple seed wave (MSW) vibration model developed in recent years. The c

    Jan 1, 2011

  • ISEE
    Selection of Powder Factor in Large Diameter Blastholes (9dd28d4c-e692-46ff-9e71-b2043e0b42a0)

    By Jack Eloranta

    This paper documents the relationship between material handling and processing coete compared to blasting cost. The old adage, "The cheapest crushing is done in the pit", appears accurate in this c!as

    Jan 1, 1995

  • ISEE
    AEL Ring 2000

    While ring-blasting techniques offer substantial benefits, there are intrinsic problems that are exacerbated when large blocks of ore are mined in attempts to improve the production economics. These p

    Jan 1, 2000

  • ISEE
    Thedaveytronic-Theintegrated Electronic Delay Detonator

    By Rapheal Trousselle

    For over 5 years, Davey Bickford has been developing and testing an electronic detonator blasting system. These new-technology detonators provide more accurate timing than conventional systems that re

    Jan 1, 1997

  • ISEE
    Techniques for Assessing the Performance of Explosives and Initiating Devices

    By A R. Cameron

    "The number of commercial explosive products available to the mining industry has been steadilyincreasing and associated with this there has been an increase in the range of characteristics or propert

    Jan 1, 1994

  • ISEE
    Electronic Blast Initiation - A Practical Users Guide

    By John Watson

    New Technologies, New Challenges and New Opportunities For quite some time now, numerous explosive manufacturers have spent untold man-hours and millions of dollars trying to develop a blast initiatio

    Jan 1, 2003

  • ISEE
    The Computerized Design Program for Tunnel Blasting

    By Jeon Jeon, Yong-Kun Choi, Chung-In Lee, Yong-Hun Jong, Hag-Soo Kim

    In this study, a computer program to design tunnel blasting pattern has been developed. The program consists of two parts; one is for tunnel blasting pattern design and the other is for blasting model

    Jan 1, 2005

  • ISEE
    Methods of Evaluating and Predicting Fragmentation

    By Claude Cunningham

    The primary reason for blasting is to fragment rock. In production blasting, the fragment sizes produced are known to exercise an overwhelming influence over working costs: handling costs and tonnage

    Jan 1, 1995

  • ISEE
    Evaluating Airblast Damage Complaints

    By Lawrence W. Gubbe

    Air blast associated with detonation of explosives in mining, construction or military applications is often responsible for complaints by people who live or work in the vicinity of the activity. Most

    Jan 1, 2004

  • ISEE
    A New and Reliable Technique for Safely Removing Underground Rock Hang-ups

    By Brian Micke, Mick Gavrilovic

    The problem of rock hang-ups in underground mining operations has been a continuing one since the days of the “hang-up man”. This position commanded the highest pay of any underground worker in many h

    Jan 1, 1999

  • ISEE
    Analytical High-Speed Photography to Evaluate Air Decks, Stemming Retention and Gas Confinement in Presplitting, Reclamation and Gross Notion Applications

    By Mark E. Hammele

    A number of new thoughts have recently emerged concerning the role of air decks, stemming, gas confinement and gross motion in specific blasting environments and applications. Field research in full-s

    Jan 1, 1989