    Piled Foundations for the New Wembley Stadium, London

    By Anthony L. Reynolds, Clifford J. Wren

    "The adoption of a significant pile testing regime, the use of Eurocode 7 as the design standard, the development of lean construction techniques, and lateral thinking in overcoming some considerable

    Jan 1, 2005

  • DFI
    Systematic Evaluation of Foundation Reuse for a Metro Station

    By Haoran Zhang, Chu Ho

    A recent design-build project in New York involved various degrees of additions and improvements to four existing transit stations. Reuse of the existing foundations was considered a more sustainable

    Sep 8, 2021

  • DFI
    Field Tests Of Soft Clay Stabilized By Stone Columns In Coastal Areas In China

    By Han Jie

    The results of full scale plate load tests on stone columns on soft clay in coastal areas are presented in this paper. Four load tests were made, two of which were performed on the ground treated with

    Jan 1, 1991

  • DFI
    Design and Construction of the New VDOT Midtown Tunnel

    By Rick Ellman, Ian Chaney

    "The Hampton Roads area encompassing the Norfolk, Virginia Beach and Newport News metropolitan region experiences some of the worst traffic congestion in Virginia. With continued growth of the ports a

    Jan 1, 2014

  • DFI
    Session 26 "Groutability and Grout Evaluation"

    By Peter Yen

    This session consists of five papers. Three involved research on the properties of grout materials, specifically ultrafine cements and polyurethane grouts. Two papers present the development of soil g

    Feb 10, 2003

  • DFI
    Session 16 "Deep Mixing Method IV"

    By Mary Ellen Bruce

    Let me first address the issue of the wet grab samples. The wet grab samples that were attempted to take on the Central Artery were hindered by the fact that the way the mixing was being done was only

    Feb 10, 2003

  • DFI
    Session 15 "Jet Grouting IV"

    By Mitsuhiro Shibazki

    I can't answer that question but I am looking at Andy, my co-author, and he says we didn't measure it. No movement. If I understand it correctly, how do we handle lateral forces in shear? T

    Feb 10, 2003

  • DFI
    Bi-directional Load Testing Using Donut Super Cells For Hangzhou West Railway Station

    By Antonio Marinucci, Robin Mao

    The new Hangzhou West Railway Station, which is currently in the early stages of construction, will be located in the city of Hangzhou, China. To accomplish the ambitious goals of the project, the con

  • DFI
    Augered Cast-In-Place Piles Quality Control

    By Rudolph P. Frizzi

    The current trend of increasing augered cast-in-place (ACIP) pile diameter, length, and load carrying capacities demonstrates improvements in installation equipment, increased acceptance, and that qua

    Jan 1, 2001

  • DFI
    Cockatoo Island Seawall Seepage Barrier

    By Chris L. Powell, Russell J. Denny

    "The remotely located Cockatoo Island iron ore mine off the Kimberley coast in the northwest of Western Australia has been in operation since 1951. The mine was recently expanded up to about 50 m (165

    Jan 1, 2017

  • DFI
    Cockatoo Island Seawall Seepage Barrier (b791f2b4-d692-4b8a-afba-0ecd9b385be1)

    By Chris L. Powell, Russell J. Denny

    "The remotely located Cockatoo Island iron ore mine off the Kimberley coast in the northwest of Western Australia has been in operation since 1951. The mine was recently expanded up to about 50 m (165

    Jan 1, 2017

  • DFI
    Construction Of Large Drilled Shafts The 2nd Annual Mike O?Neill Lecture

    By Dan Brown

    Improvements in construction equipment and techniques in recent years have made possible the use of drilled shaft foundations in diameters and lengths not previously considered practical or feasible.

    Jan 1, 2013

  • DFI
    Gordie Howe International Bridge Foundations - Drilled Shaft Construction in Challenging Detroit Limestone

    By Jim Glider, Noah Miner

    The Gordie Howe International Bridge is a project to build a cable-stayed bridge and border crossing across the Detroit River. With a span length of 2,800-ft (853.4 meters), the Gordie Howe Internatio

    Sep 8, 2021

  • DFI
    Interdisciplinary And Inventive Approaches To Drilled Shaft Remediation

    By William D. Oder, Seth H. Hamblin, Les R. Chernatskas, Jonathan L. Ernst

    Large diameter drilled deep foundations are a widely utilized solution throughout North America and the world. Numerous design and construction techniques developed over the past 100 years have made t

    Oct 1, 2022

  • DFI
  • DFI
    High Strain Testing Of Augered Cast Piles At Miami Fort Power Station

    By C. Michael Morgano

    Static tests are costly and time consuming, so they are not always the best answer [ ]

    Jan 1, 2005

  • DFI
  • DFI
    Load And Resistance Factor Design Of Pullout Of A Single Driven Pile In Sands And Clays

    By Dongwook Kim

    Recently, load and resistance factor design (LRFD) is gradually being adopted internationally in geotechnical design due to the advantages of LRFD over the existing allowable stress design (ASD). LRFD

    Jan 1, 2010

  • DFI
    Pile Foundation Solutions in the Deep Quaternary Sediments of Botany Bay

    By Paul A. O’Brien, Gary A. Chapman, Thomas G. Cuniowski

    "The new Amcor B9 paper mill in Botany, NSW, Australia, involved the design and construction of a new paper mill founded within the Botany Basin Sediments. There were numerous design and construction

    Jan 1, 1900

  • DFI
    Augered Cast-In-Place Pile Load Tests On The Cincinnati, Ohio/Northern Kentucky Riverfront

    By Theodore W. Vogelpohl

    Augered cast-in-place piles have proven to be effective, adaptable and economical for projects throughout the Ohio River Valley. Specifically, they have been used extensively for high-rise structures,

    Jan 1, 2005