Augered Cast-In-Place Piles Quality Control

- Organization:
- Deep Foundations Institute
- Pages:
- 18
- File Size:
- 5880 KB
- Publication Date:
- Jan 1, 2001
Abstract
The current trend of increasing augered cast-in-place (ACIP) pile diameter, length, and load carrying capacities demonstrates improvements in installation equipment, increased acceptance, and that quality control is being successfully implemented by the parties involved in the ACIP pile construction process. Quality control is essential for ACEP piles since 24- to 36-in-dia (610-to 915-mm-dia) piles are currently being constructed to sustain design compressive loads of 800 to 900 kips (3555 to 4000 kN). This paper presents a summary of ACIP pile quality control procedures and methods beginning in the design and bid process, through ACIP pile installation, to post-construction. The results of a recent survey of contractors, engineers, equipment suppliers, and researchers routinely involved with ACIP piles in the United States, Europe, and the Middle East are included to address current trends in ACIP piles and quality control.
Citation
APA:
(2001) Augered Cast-In-Place Piles Quality ControlMLA: Augered Cast-In-Place Piles Quality Control. Deep Foundations Institute, 2001.