I can't answer that question but I am looking at Andy, my co-author, and he says we didn't measure it. No movement. If I understand it correctly, how do we handle lateral forces in shear? The main columns were designed as pin connections so there wasn't a moment in the shear between the pile cap and the columns the steel reinforcing was used to resist that. I am not aware of how we would have installed those, it is possible to try and submerge them all if the jet grout is still fluid. They were higher than design. You are correct.