Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    San Diego Courthouse Commons Shaft Shoring And Tunnel Canopy Tubes

    By Ali Nasirian Ph. D., Gabriel Carvajal

    To facilitate the safer and more secure transportation of inmates from San Diego Central Jail to the new San Diego Courthouse, the County of San Diego committed to building a new transfer facility as

    Oct 1, 2022

  • DFI
    Construction Dewatering Challenges in Urban Environments

    By Rafael A. Rivera

    "Since the dawn of construction, there has been a need for excavations, which sometimes need to occur below the groundwater table. Excavations in themselves are difficult enough, with the myriad of re

    Jan 1, 2017

  • DFI
    The Berkeley Art Museum: Using Deep Foundations to Repurpose a Historical Building

    By Timothy Nelson, Simon Burnworth

    "The University of California’s new Berkeley Art Museum and Pacific Film Archive will showcase a collection of art and film in a facility that pairs an existing 1930s-era printing press facility with

    Jan 1, 2017

  • DFI
    The Impact Geotechnical Data Management Systems May Have on Risk Allocation for Differing Site Conditions in Construction Contracts

    By Steven M. Henderson, Zachary D. Jones

    The risk of allocation in construction contracts is a primary concern for all parties. For contracts involving subsurface construction the allocation of site condition risk is critical. In the past on

    Jan 1, 2017

  • DFI
    Elliptical Jet Grouting for the Sela-22 Project in New Orleans, LA: An Innovative Solution

    By Filippo Maria Leoni, Gianluca Pianezze

    "As part of the Southeast Louisiana (SELA) drainage program, designed to reduce flood damages in the City of New Orleans and surrounding parishes, the SELA-22 project entailed the construction of a co

    Jan 1, 2017

  • DFI
    Ground Improvement for Underground Construction in South Florida

    By Christopher Sammon, Nicholas Turus

    "The demand for underground parking in South Florida has increased as a result of changes to the local building code, coupled with developers’ desire to improve building aesthetics and provide much ne

    Jan 1, 2017

  • DFI
    Case Study: Stability Analysis for an Existing Bridge Experiencing Riverbank Erosion

    By Brandon Smith, William Bohlen

    Riverbank erosion along the Brazos River has modified the structural support conditions for an existing bridge structure in Southeast Texas. The 8-span, 1,200-foot long bridge was completed in 1992 al

    Jan 1, 2019

  • DFI
    Removal of the Former San Francisco-Oakland Bay Bridge Foundation Caisson E3 by Mechanical Means and Explosives

    By Michael Gebman, Jack Gerwick

    "With the opening of the new San Francisco-Oakland Bay Bridge East Span, the former bridge and its caisson foundations are being demolished. Caisson foundations are in the path of a future shipping ch

    Jan 1, 2016

  • DFI
    New Insights into Driven Pile Vibrations using Novel Data Management and Visualization Tools

    By Mark Zablocki, Dakarai McCoy

    Ground vibrations are an unavoidable effect of driving piles and may pose a risk to nearby infrastructure and the comfort of adjacent occupants. Driven-pile-induced ground vibrations are known to vary

    Sep 8, 2021

  • DFI
    Trump International Is OPA Winner

    "Standing 92 stories high and just over 1,362 ft tall, Chicago’s Trump International Hotel and Tower is perfectly positioned at the center of one of the world’s most impressive skylines.The Tower serv

    Jan 1, 2009

  • DFI
    Cannonsville Dam Emergency Borehole Response

    By John Vickers, William H. Hover, Paul C. Schmall

    "Any sudden subsurface issue that threatens the stability of existing buildings or infrastructure is cause for immediate investigation and prompt remedial action. Nowhere is this more true than the n

    Jan 1, 2016

  • DFI
    Hudson’s Revitalization: The Use of Robotics in the Work Place

    By Dave P. DeClerck

    Hardman Construction was faced with the challenge of completing a large earth retention project on a constricted downtown Detroit site, while maintaining a safe and productive worksite. To do so, new

    Jan 1, 2019

  • DFI
    Design And Construction Of Underground Basin Using Composite Slurry Wall 500 Feet Away From The Pacific Ocean

    By Ihab Allam PE, Meeok Kim. PE. Ph. D

    The wet weather equalization basin (EB) planned for Pacifica, CA is a 45 feet deep rectangular shaped underground water tank containing over 2.1 million gallons of water, and located only 500 feet awa

  • DFI
    Bertha Rescue Shaft – SR99 Tunnel

    By Lance Rasband, Richard Hanke

    "Seattle Tunnel Partners (STP) started mining on Seattle’s SR99 tunnel on July 30, 2013, working slowly through a 15 ft (4.6 m) thick fiber-reinforced concrete headwall. Once through the headwall, the

    Jan 1, 2015

  • DFI
    Case Study: Feather River West Levee Program Cutoff Walls

    By Kyle R. Lackner, Jared P. Williams

    "The Sutter Butte Flood Control Agency initiated the Feather River West Levee (FRWL) Program in 2010 to bring 35 miles of levee along the Feather River into compliance with applicable Federal and Stat

    Jan 1, 2016

  • DFI
    Installation and Efficiency of Common Helical Pile Couplings

    By Jason Herron, Joseph Brown

    The common couplings for joining sections of helical piles with an outside diameter of 6.625 inches and 8.625 inches are square on square, flange to flange, external pipe sleeve, internal pipe sleeve,

    Jan 1, 2019

  • DFI
    Northeast Boundary Tunnel – Mount Olivet Road Drop Shaft

    By Jeremiah M. Jezerski, Russell H. Lutch

    The Mount Olivet Road Drop Shaft (MOR-DS) support of excavation (SOE) is a circular unreinforced concrete shaft with an inside diameter of a 30.5 ft (9.3 m) and depth of 120.5 ft (36.7 m), constructed

    Oct 1, 2022

  • DFI
    Rock Excavation and Underpinning below a 19-Story Building

    By Kevin P. Gleckler, Steven C. Highfill

    "Escalators to access platforms for the Second Avenue Subway Station at 72nd Street in Manhattan are to be installed in the basement of an existing 19-Story residential building. The escalators, which

    Jan 1, 2016

  • DFI
    Building Risk Assessment For Urban Rail Transit Systems In India - Current Practices And Challenges

    By Manchanda H, Agarwal J.

    The construction industry has one of the largest numbers of injuries compared to other industries. Thus, reducing accidents and determining construction risks are extremely important. One of the essen

    Sep 1, 2022

  • DFI
    Seepage Barrier Mix Design Development, Installation, and Evaluation

    By George W. Little, John Councilman

    "The selection, evaluation, and modification of contractor mix designs for self-hardening seepage barriers, completed by the slurry trench excavation method, can be one of the most critical and challe

    Jan 1, 2016