Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Design, Construction, and Performance of the Temporary Earth Retention System at No. 9 Walton

    By Joel B. Dellaria, Justin R. Lewis

    "No. 9 Walton is a new high-rise condominium building located in the Gold Coast area of Chicago. The adjacent building, Walton on the Park, featured 4 levels of below grade parking and utilized a seca

    Jan 1, 2017

  • DFI
    Settlement Reducing Auger Cast-In-Place Piles below a Mat Foundation of a 41-Story Structure

    By Swaminathan Srinivasan, Aaron J. Muck

    "When an opportunity arises to combine state-of-the-art concepts with advanced modeling tools, engineers need to take what they know and apply forward thinking to geotechnical solutions to promote the

    Jan 1, 2015

  • DFI
    The Galataport Project In Istanbul, Turkey. A Unique Case History In Geotechnical Engineering

    By Carlandrea Albonico, Salvatore Miranda

    After a brief introduction of the whole Project, the paper describes two special geotechnical engineering solutions provided within the scope of the Galataport Project, in Istanbul, Turkey. The first

    Nov 1, 2022

  • DFI
    Geotechnical Instrumentation of Pile Foundations Embedded In Molasse of a High-Rise Building

    By A. Daouadji, P. Cazes, S. Grange, L. Briançon, R. Milane

    Construction in congested urban areas is often accompanied by geotechnical problems due to high loads and the impact caused by nearby buildings. For this reason, it is important to understand the beha

    Jan 1, 2019

  • DFI
    Case Study: Feather River West Levee Program Cutoff Walls

    By Kyle R. Lackner, Jared P. Williams

    "The Sutter Butte Flood Control Agency initiated the Feather River West Levee (FRWL) Program in 2010 to bring 35 miles of levee along the Feather River into compliance with applicable Federal and Stat

    Jan 1, 2016

  • DFI
    Data Collected and Lessons Learned from Load Test Program for ACIP Piles Supporting Highway Bridges

    By Reinaldo J. Villa, Joshua C. Adams

    The I-395/SR-836/I-95 reconstruction project is an $818-million design-build construction effort that includes construction of viaduct, segmental and signature bridges in Miami leading into Miami Beac

    Sep 8, 2021

  • DFI
    Pneumatic Sinking 2.0: A World Record Caisson Project By Large Scale Innovations Evolution In Theory And Revolution In Practice

    By Bartho J. Admiraal, Antoine Feddema

    Pneumatic sinking of caissons has been established from mid-19th century. The technique of pneumatic sinking has been applied on many projects for underground construction up to depths over 20m below

    May 1, 2022

  • DFI
    Pile Foundations for the San Francisco 49ers NFL Stadium

    By Scott A. Walker, Gabriel J. Alcantar, Brian Zuckerman, Ramin Golesorkhi

    "The new San Francisco 49ers Levi’s Stadium is part of the next generation of sporting facilities. Constructed in Santa Clara, Calif., the new structure has 68,500 open-air bowl seats and includes a 7

    Jan 1, 2014

  • DFI
    Data Drives Herbert Hoover Dike (Hhd) Rehabilitation Efforts

    By Michael Arnold, Jignyash Manyam, Yoav Rappaport

    The USACE required construction of over 13 miles of cutoff wall at an average depth of 65 feet for the Herbert Hoover Dike (HHD). To meet project requirements, to provide quality control and make soun

    Oct 1, 2022

  • DFI
    Sharing of Lateral Loads and Moments in Pile Foundations

    By Andrea Gambi, Giancarlo Olivucci, Maurizio Lenzi

    "In the paper a criterion for the evaluation of the sharing of the lateral loads in a piled foundation is presented. It relies on the the compatibility condition between the rotation of the rigid pile

    Jan 1, 2005

  • DFI
    The Development and State of Practice of Cutter Soil Mixing in North America – The First 10 Years

    By Brian Wilson, Franz-Werner Gerressen

    "Cutter Soil Mixing, also known as CSM, was developed in Europe as an alternate method of Deep Mixing to the more traditional single and multiple auger techniques, and brought to market by Bauer Masch

    Jan 1, 2015

  • DFI
    The World's Longest Directional Impact Driven Pile

    By Robert F. Stevens, Robin Givet, Kenneth Viking

    "Summary This paper describes a case of a directional pile installation conducted from an existing oil platform in the Caspian Sea, offshore Baku. Results are presented for 660 mm outer diameter (660

    Jan 1, 2014

  • DFI
    Low Noise and Low Vibration Tube Pile Installation by the Press-in Piling Method

    By Takefumi Takuma, Hiroyuki Nishimura, Shigeru Kambe

    "In order to achieve tubular pile driving with low noise and low vibration, the Press-in Piling Method has been adopted on many projects. The method utilizes reaction force derived primarily from prev

    Jan 1, 2015

  • DFI
    Boston Waterfront Redevelopment: Re-use Of Existing Pier Piles To House Future Generations

    By John P. Briand III, Douglas J. Aghjayan, Robert E. Fosse

    This paper highlights the successful pile load testing program for the redevelopment of Pier One in East Boston, Massachusetts. Pier One is a 5.4-acre parcel on a dormant waterfront site used in the 1

  • DFI
    Improvements to Commonly Used Cutoff Wall Specifications

    By Michael Kynett, Francke Walberg, Richard Millet, Khaled Chowdhury, Mary Perlea

    "Cutoff walls are the most common seepage improvement measure for levee flood control projects throughout California’s Central Valley. Cutoff walls are widely used because they can be implemented with

    Jan 1, 2015

  • DFI
    The Berkeley Art Museum: Using Deep Foundations to Repurpose a Historical Building

    By Timothy Nelson, Simon Burnworth

    "The University of California’s new Berkeley Art Museum and Pacific Film Archive will showcase a collection of art and film in a facility that pairs an existing 1930s-era printing press facility with

    Jan 1, 2017

  • DFI
    Goethals Bridge Replacement Foundation Design Modifications Due to Field Conditions

    By John P. Turner, Mark Jen, Bobby Daita

    "The Port Authority of New York and New Jersey is replacing the existing Goethals Bridge built in 1928 which is deemed to be functionally obsolete. The replacement bridge will consist of a dual cable-

    Jan 1, 2016

  • DFI
    Innovative Integrated Jet Grout And Contiguous Cfa Piled Solution For Complex Deep Shoring Wall In Soft Soils – Retaining Structural Design And Analysis

    By W. L. Chong, Y. Zou

    There are many types of Earth Retention Systems (ERS) available in the market where more than one method can be a feasible solution for a project. This paper examines the design and construct process

    Nov 1, 2022

  • DFI
    Design And Construction Of The Deepest Cfa Pile In Australia

    By W. L. Chong

    For a project located in Docklands Victoria, a high-rise development was proposed where the geology comprised soils of various compositions and consistencies to approximately 50m deep before being und

    Nov 1, 2022

  • DFI
    Drilled Shaft Load Testing Program for Design of Foundations for an Automated People Mover

    By Samer Rabab’ah, John C. Niedzielski, Jason Valeria

    The PHX Sky Train is an automated people mover system located at Phoenix Sky Harbor International Airport. Phase II of the PHX Sky Train includes the design of over 150 drilled shafts for support of f

    Jan 1, 2019