Precision Drilling for the Pardee Chemical Feed Shaft Project - NAT2022By Emily Sing, Ashim Gajurel, Thomas Pennington, William Brown
The Pardee Chemical Feed Shaft Project involves construction of two new chemical feed shafts to improve raw water treatment capabilities at the East Bay Municipal Utility District’s (EBMUD) Pardee Res
Dec 1, 2022
-
Environmentally Friendly Soil Conditioning for EPB TBM: The State of Environmental Considerations in North America and Around the World - NAT2022By T. Murt, C. Oñate
In recent years, environmental considerations have played a prominent role in underground construction projects. The management and disposal of the muck produced by an EPB TBM is an important aspect o
Dec 1, 2022
-
Effect of Machine and Operational Parameters on Utilization Factor -NAT2022By Omid Frough, Hossein Changani
Application of Tunnel Boring Machines (TBMs) is one of the main solutions to achieve a safe and high-performance method of construction in hard rock and soft ground tunneling. In order to adequately a
Dec 1, 2022
-
The Northeast Boundary Tunnel—A TBM Performance Review - NAT2022By Elisa Comis, Jeffrey Peterson, Yama Ebrahimi
Construction of the Northeast Boundary Tunnel (NEBT), the last leg of the Anacostia River Tunnel System on DC Water’s Clean Rivers Project, started in September 2018 and was completed in April 2021. T
Dec 1, 2022
-
Slurry Wall Construction in Coarse-Grained Soils - NAT2022By J. Andrew McGlenn, Greg Emslie, Murray Gant
The Second Narrows Water Supply Tunnel will ensure system reliability in the event of a major earthquake and increase the Greater Vancouver Water District’s capacity to meet a growing population’s lon
Dec 1, 2022
-
Analysis and Design of Tunnel Lining Through a Potentially Displaceable Fault - NAT2022By Theodore Feldsher, Seung Han Kim, Mourad Attalla, John Roadifer, Chu-Chieh Jay Lin
Lifelines in seismic regions of the world seldom can escape crossing active faults. Cities in California have been mitigating this risk by constructing improved fault crossings. This paper discusses t
Dec 1, 2022
-
Design and Construction of NEORSD’s Doan Valley Storage Tunnel - NAT2022By Timothy O’Rourke, Karrie Buxton, Chris Lynagh, Daniel Dobbels, Frederick Vincent
The Doan Valley Storage Tunnel Project in Cleveland Ohio was constructed to control Combined Sewer Overflows (CSOs). It is a complex system of three tunnels ranging from 8.5 to 18 feet in diameter wit
Dec 1, 2022
-
Newly Adopted Structure Criteria for BART Underground Facilities—Industry Update - NAT2022By Samer Sadek, Phoebe Cheng, Changmo Kwon, Myat Ohn
BART Facilities Standards (BFS) Structural Criteria is a living document that governs planning, design, and construction of all BART projects. Since its development, the document undergoes incremental
Dec 1, 2022
-
Implementation of Vibration Monitoring to Improve Blast Design for the Mitchell Point Crossing - NAT2022By Nathaniel White, Todd Kilduff, Justin Laviolette, Dan Laviolette, Randy Zeigler, Sean Sundermann
The Mitchell Point tunnel is a part of several ongoing efforts to connect the 12-mile-long Historic Columbia River trail between Mitchell Point Outlook to Mitchell Point Drive. The tunnel lies inside
Dec 1, 2022
-
Applications of Artificial Intelligence in Tunnel Design and Construction - NAT2022By Gunjan R. Bhattarai, Kumar Bhattarai
Recently, there has been an enormous increase of interest in artificial intelligence (AI), machine learning (ML), and their applications by researchers, government agencies, and the underground constr
Dec 1, 2022
-
Bridging the Gap—From Borehole Spacing to DSC Claim Resolution - NAT2022By Kapila Pathirage, Michael S. Schultz, Gregory Sanders, Ulf G. Gwildis
Adequate understanding of the subsurface conditions along the alignment of a planned tunnel is key for managing project risk. For achieving this understanding, geotechnical borings are conducted durin
Dec 1, 2022
-
Characterizing Gassy Ground and Its Importance - NAT2022By Barry R. Doyle, Emma C. Ross
This paper presents a 20-year global account of tunneling in gassy ground demonstrating high probability of schedule delays, cost overruns, worker injuries and fatalities. Causes of these failures are
Dec 1, 2022
-
Micro Seismic Monitoring and Analysis for Rock Burst Prone Tunnels Utilizing TBMsBy G. A. Rosario, G. Peach
Twin 8.5 m diameter, 10 km long headrace tunnels under overburdens of up to 1870 m were excavated for the neelum jhelum hydroelectric project in north-eastern pakistan using two main beam gripper tunn
Dec 1, 2022
-
Slurry Treatment Plants in Mechanized Tunneling Operations— Safety, Performance and Cost Factor for Jobsites - NAT2022By Gino Vogt
In mechanized tunnelling operations, performance, consumption and safety are main factors for jobsites. One of the most important components effecting these factors, especially in slurry TBM operation
Dec 1, 2022
-
Unique Challenges for the Construction of PATH’s Exchange Place Cross-Passage Tunnel - NAT2022By Todd Kilduff, James Grillo, Shrey Arora
In efforts to improve ingress/egress from the existing subway platforms in PATH’s Exchange Place Station, a new 18-foot horseshoe cross-passage tunnel was constructed by Walsh Construction who retaine
Dec 1, 2022
-
Construction Challenges of the Anderson Dam Tunnel Project - NAT2022By Ron Drake
The Anderson Dam Tunnel Project is a high-priority, urgent project under construction by the Santa Clara Valley Water District in California. The project will provide a new low-level outlet for the An
Dec 1, 2022
-
Development of the ITA “BIM in Tunneling—Guideline for Bored Tunnels” - NAT2022By Jurij Karlovšek, Wolfgang Angerer, Vojtech Ernst Gall, Jacob Grasmick
The International Tunneling Association (ITA) Working Group (WG) 22 “Information Modelling in Tunneling” has developed a guideline for the implementation of Building Information Modeling (BIM) concept
Dec 1, 2022
-
Design of Precast Segmental Tunnel Lining for Pawtucket CSO Tunnel Project - NAT2022By Irwan Halim, Seung Han Kim
This paper will describe design of precast segmental tunnel lining for the Pawtucket CSO Tunnel Project in Providence, Rhode Island. The tunnel is 11,700 LF long with 30-foot finished diameter to be c
Dec 1, 2022
-
The State of DRB’s in the Tunnel Industry - NAT2022By David Hatem, Michael Vitale, Joseph Gildner, Michael Roach, Fred Dunham
Dispute Review/Resolution Boards (DRB’s) are a highly successful dispute avoidance and resolution tool. In a joint effort between the UCA of SME and the Dispute Resolution Board Foundation (DRBF), the
Dec 1, 2022
-
Underpinning of an Operational Subway Aided by Mined Galleries - NAT2022By Thomas Schwind, Elmar Feigl, Gerald Skalla, Angelos Gakis
Cedarvale station was constructed as part of the Eglinton Crosstown Light Rail Line, under the operational Yonge-University Line Subway box of Toronto Transit Commission (TTC). The station was constru
Dec 1, 2022