Search Documents

Sort by

  • SME
    Precision Drilling for the Pardee Chemical Feed Shaft Project - NAT2022

    By Emily Sing, Ashim Gajurel, Thomas Pennington, William Brown

    The Pardee Chemical Feed Shaft Project involves construction of two new chemical feed shafts to improve raw water treatment capabilities at the East Bay Municipal Utility District’s (EBMUD) Pardee Res

    Dec 1, 2022

  • SME
    Environmentally Friendly Soil Conditioning for EPB TBM: The State of Environmental Considerations in North America and Around the World - NAT2022

    By T. Murt, C. Oñate

    In recent years, environmental considerations have played a prominent role in underground construction projects. The management and disposal of the muck produced by an EPB TBM is an important aspect o

    Dec 1, 2022

  • SME
    Effect of Machine and Operational Parameters on Utilization Factor -NAT2022

    By Omid Frough, Hossein Changani

    Application of Tunnel Boring Machines (TBMs) is one of the main solutions to achieve a safe and high-performance method of construction in hard rock and soft ground tunneling. In order to adequately a

    Dec 1, 2022

  • SME
    The Northeast Boundary Tunnel—A TBM Performance Review - NAT2022

    By Elisa Comis, Jeffrey Peterson, Yama Ebrahimi

    Construction of the Northeast Boundary Tunnel (NEBT), the last leg of the Anacostia River Tunnel System on DC Water’s Clean Rivers Project, started in September 2018 and was completed in April 2021. T

    Dec 1, 2022

  • SME
    Slurry Wall Construction in Coarse-Grained Soils - NAT2022

    By J. Andrew McGlenn, Greg Emslie, Murray Gant

    The Second Narrows Water Supply Tunnel will ensure system reliability in the event of a major earthquake and increase the Greater Vancouver Water District’s capacity to meet a growing population’s lon

    Dec 1, 2022

  • SME
    Analysis and Design of Tunnel Lining Through a Potentially Displaceable Fault - NAT2022

    By Theodore Feldsher, Seung Han Kim, Mourad Attalla, John Roadifer, Chu-Chieh Jay Lin

    Lifelines in seismic regions of the world seldom can escape crossing active faults. Cities in California have been mitigating this risk by constructing improved fault crossings. This paper discusses t

    Dec 1, 2022

  • SME
    Design and Construction of NEORSD’s Doan Valley Storage Tunnel - NAT2022

    By Timothy O’Rourke, Karrie Buxton, Chris Lynagh, Daniel Dobbels, Frederick Vincent

    The Doan Valley Storage Tunnel Project in Cleveland Ohio was constructed to control Combined Sewer Overflows (CSOs). It is a complex system of three tunnels ranging from 8.5 to 18 feet in diameter wit

    Dec 1, 2022

  • SME
    Newly Adopted Structure Criteria for BART Underground Facilities—Industry Update - NAT2022

    By Samer Sadek, Phoebe Cheng, Changmo Kwon, Myat Ohn

    BART Facilities Standards (BFS) Structural Criteria is a living document that governs planning, design, and construction of all BART projects. Since its development, the document undergoes incremental

    Dec 1, 2022

  • SME
    Implementation of Vibration Monitoring to Improve Blast Design for the Mitchell Point Crossing - NAT2022

    By Nathaniel White, Todd Kilduff, Justin Laviolette, Dan Laviolette, Randy Zeigler, Sean Sundermann

    The Mitchell Point tunnel is a part of several ongoing efforts to connect the 12-mile-long Historic Columbia River trail between Mitchell Point Outlook to Mitchell Point Drive. The tunnel lies inside

    Dec 1, 2022

  • SME
    Applications of Artificial Intelligence in Tunnel Design and Construction - NAT2022

    By Gunjan R. Bhattarai, Kumar Bhattarai

    Recently, there has been an enormous increase of interest in artificial intelligence (AI), machine learning (ML), and their applications by researchers, government agencies, and the underground constr

    Dec 1, 2022

  • SME
    Bridging the Gap—From Borehole Spacing to DSC Claim Resolution - NAT2022

    By Kapila Pathirage, Michael S. Schultz, Gregory Sanders, Ulf G. Gwildis

    Adequate understanding of the subsurface conditions along the alignment of a planned tunnel is key for managing project risk. For achieving this understanding, geotechnical borings are conducted durin

    Dec 1, 2022

  • SME
    Characterizing Gassy Ground and Its Importance - NAT2022

    By Barry R. Doyle, Emma C. Ross

    This paper presents a 20-year global account of tunneling in gassy ground demonstrating high probability of schedule delays, cost overruns, worker injuries and fatalities. Causes of these failures are

    Dec 1, 2022

  • SME
    Micro Seismic Monitoring and Analysis for Rock Burst Prone Tunnels Utilizing TBMs

    By G. A. Rosario, G. Peach

    Twin 8.5 m diameter, 10 km long headrace tunnels under overburdens of up to 1870 m were excavated for the neelum jhelum hydroelectric project in north-eastern pakistan using two main beam gripper tunn

    Dec 1, 2022

  • SME
    Slurry Treatment Plants in Mechanized Tunneling Operations— Safety, Performance and Cost Factor for Jobsites - NAT2022

    By Gino Vogt

    In mechanized tunnelling operations, performance, consumption and safety are main factors for jobsites. One of the most important components effecting these factors, especially in slurry TBM operation

    Dec 1, 2022

  • SME
    Unique Challenges for the Construction of PATH’s Exchange Place Cross-Passage Tunnel - NAT2022

    By Todd Kilduff, James Grillo, Shrey Arora

    In efforts to improve ingress/egress from the existing subway platforms in PATH’s Exchange Place Station, a new 18-foot horseshoe cross-passage tunnel was constructed by Walsh Construction who retaine

    Dec 1, 2022

  • SME
    Construction Challenges of the Anderson Dam Tunnel Project - NAT2022

    By Ron Drake

    The Anderson Dam Tunnel Project is a high-priority, urgent project under construction by the Santa Clara Valley Water District in California. The project will provide a new low-level outlet for the An

    Dec 1, 2022

  • SME
    Development of the ITA “BIM in Tunneling—Guideline for Bored Tunnels” - NAT2022

    By Jurij Karlovšek, Wolfgang Angerer, Vojtech Ernst Gall, Jacob Grasmick

    The International Tunneling Association (ITA) Working Group (WG) 22 “Information Modelling in Tunneling” has developed a guideline for the implementation of Building Information Modeling (BIM) concept

    Dec 1, 2022

  • SME
    Design of Precast Segmental Tunnel Lining for Pawtucket CSO Tunnel Project - NAT2022

    By Irwan Halim, Seung Han Kim

    This paper will describe design of precast segmental tunnel lining for the Pawtucket CSO Tunnel Project in Providence, Rhode Island. The tunnel is 11,700 LF long with 30-foot finished diameter to be c

    Dec 1, 2022

  • SME
    The State of DRB’s in the Tunnel Industry - NAT2022

    By David Hatem, Michael Vitale, Joseph Gildner, Michael Roach, Fred Dunham

    Dispute Review/Resolution Boards (DRB’s) are a highly successful dispute avoidance and resolution tool. In a joint effort between the UCA of SME and the Dispute Resolution Board Foundation (DRBF), the

    Dec 1, 2022

  • SME
    Underpinning of an Operational Subway Aided by Mined Galleries - NAT2022

    By Thomas Schwind, Elmar Feigl, Gerald Skalla, Angelos Gakis

    Cedarvale station was constructed as part of the Eglinton Crosstown Light Rail Line, under the operational Yonge-University Line Subway box of Toronto Transit Commission (TTC). The station was constru

    Dec 1, 2022