Unprecedented In-Tunnel Diameter Conversion of the Largest Hard Rock TBM in the U.S. - NAT2022

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 9
- File Size:
- 3638 KB
- Publication Date:
- Dec 1, 2022
Abstract
The largest hard rock TBM ever to bore in the USA, an 11.6 m diameter Robbins Main Beam TBM, recently underwent a planned in-tunnel diameter change to a more compact 9.9 meters. The first-of-itskind conversion process for the Main Beam TBM was undertaken 2.8 km into the bore and was not done inside a shaft or pre-excavated portal. This paper will detail the unique dual-diameter machine designed for the Mill Creek Drainage Relief Tunnel in Dallas, Texas, USA, machine performance, and successful size conversion process that took place in early 2021—a process that utilized the four C’s of construction to enormous benefit: Communication, Cooperation, Collaboration and Coordination.
Citation
APA:
(2022) Unprecedented In-Tunnel Diameter Conversion of the Largest Hard Rock TBM in the U.S. - NAT2022MLA: Unprecedented In-Tunnel Diameter Conversion of the Largest Hard Rock TBM in the U.S. - NAT2022. Society for Mining, Metallurgy & Exploration, 2022.