Design of Montreal Metro Blue Line Extension Tunnel - NAT2022

Society for Mining, Metallurgy & Exploration
Mehdi Bakhshi Verya Nasri
Organization:
Society for Mining, Metallurgy & Exploration
Pages:
11
File Size:
6330 KB
Publication Date:
Dec 1, 2022

Abstract

The development of the Montreal metro extension Line 5 -Blue Line- toward the northeast are located between the existing Saint-Michel station and Anjou. It consists of 6-km long two-track tunnel, five new stations and six auxiliary structures. Most of the tunnel (5.5 km) will be excavated by a 9.6 m diameter shielded rock TBM and supported by a precast segmental lining system. TBM will be fitted for probing and preexcavation grouting to control water inflow into the tunnel during the excavation. This paper presents major design aspects of the TBM tunnel including alignment, geological condition, spaceproofing, precast segmental lining, and geotechnical instrumentation and monitoring.
Citation

APA: Mehdi Bakhshi Verya Nasri  (2022)  Design of Montreal Metro Blue Line Extension Tunnel - NAT2022

MLA: Mehdi Bakhshi Verya Nasri Design of Montreal Metro Blue Line Extension Tunnel - NAT2022. Society for Mining, Metallurgy & Exploration, 2022.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account