Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Structural Aspects Of The Stabilization Of Ten Mile Slide

    By Adrian Gygax, Sarah Gaib, Rod Kostaschuk

    The British Columbia Ministry of Transportation and Infrastructure (Ministry) recently completed a slope stabilization project at Ten Mile Slide on Highway 99. The highway is an essential part of the

    Oct 1, 2022

  • DFI
    Design Of The Drilled Shaft Foundations For The Cooper River Bridge

    By Liang Shen

    The Cooper River Bridge, the longest cable-stayed bridge in North America, replaces two existing bridges along U.S. Highway 17 and connects the City of Charleston and the town of Mount Pleasant, South

    Jan 1, 2013

  • DFI
    Micropile Performance Variability: A Fundamental Case Study

    By Walter E. Vanderpool

    Type 1B micropiles (Bruce and Juran, 1997) can be installed rapidly and efficiently. During an 85-day period, 536 micropiles were installed to depths of 61 meters within a site 41 meters by 43 meters.

    Jan 1, 2002

  • DFI
    Effect of Axial Compression on Lateral Pile Response: Laterally Loaded Test Pile Comparison

    By David S. Graham, Joseph D. Bailey, Paul J. Axtell, Michael K. Muchard

    "Two instrumented test piles were simultaneously subjected to a static lateral load test by jacking the piles apart. One of the piles was loaded in axial compression via kentledge during the lateral l

    Jan 1, 2017

  • DFI
    Change In Bearing Capacity Of Bored Steel H Piles Enclosed In Soil-Cement Columns With Overburden Pressure - Synopsis

    By Tomio Tsuchiya

    A construction method of bored steel H piles enclosed in soil-cement columns was developed by modifying steel H piles from the driven pile method and soil-cement walls from the earth retaining wall me

    Jan 1, 1996

  • DFI
    Route 9A Pedestrian Tunnel at the World Trade Center

    By Raymond E. Sandiford

    "The redevelopment of the World Trade Center (WTC) provided an opportunity for the Port Authority of NY and NJ to complete a long sought underground connection between all of Lower Manhattan’s transit

    Jan 1, 2012

  • DFI
    “Special Application Of Micro-Piles” For The Construction Of A Bridge Well Foundation

    By Nagarajkumar BV

    Pavai-and TeampT JV started working on the project T49A, Sumbar J & K State as part of slope and earth stabilization for ongoing Banihal - Katra Railway Connection Project. This project has several tu

    Nov 1, 2022

  • DFI
    Augered Cast-In-Place Piles Quality Control

    By Rudolph P. Frizzi

    The current trend of increasing augered cast-in-place (ACIP) pile diameter, length, and load carrying capacities demonstrates improvements in installation equipment, increased acceptance, and that qua

    Jan 1, 2001

  • DFI
    Remedial Work On Large Pile Deviation In The Very Thick Marine Swamp Clay Deposit

    By Wanchai Teparaksa

    Pile deviation generally can happen after installation of driven pile particularly in soft soil layers. In this case study, all 242 diameter 0.8 m spun piles were deviated from 20 to 820 mm. The large

    Jan 1, 2002

  • DFI
    Theoretical And Experimental Investigation On Underwater Ground Anchors

    By Leonello Sciacca

    Deepening of harbours has become a priority, necessary to the ongoing operation of the wharves in the face of deeper draft merchant vessels and cruise ships. It is now standard practice in many areas

    Jan 1, 2011

  • DFI
    Helical Pulldown? Micropiles Support Museum Celebrating The Bicentennial Of The Lewis And Clark Expedition

    By Roy Jennings

    The Discovery Expedition of St. Charles, MO chose to build its two-story museum in the flood plain of the Missouri River, near the starting point of the Lewis and Clark Expedition. Should the lower le

    Jan 1, 2003

  • DFI
    Designed, Load Tested, Installed, And Integrity Tested ACIP Piles At Lovers' Key Site In Southwest Florida

    By Gregory A. Stephan

    A case history of design, prediction, instrumented static load tests on probe piles, installation monitoring, and integrity testing of production piles is presented. Based upon project-specific subsoi

    Jan 1, 1999

  • DFI
    Recent Developments In Continuous Flight Auger Piling

    By P. H. Derbyshire

    The use of continuous flight auger piles has increased significantly in the U.K. to such an extent that it is now the most widely used method of constructing small diameter bored piles. This paper des

    Jan 1, 1989

  • DFI
    Ultimate Shaft Friction, Displacement Response and Set-Up for Axially Loaded Piles in Clay

    By Kjell Karlsrud

    "Abstract New semi-empirical design procedures for the determination of ultimate shaft friction and load-displacement response of axially loaded piles in clay are proposed. Hereunder also prediction o

    Jan 1, 2014

  • DFI
    Foundation Design and Construction Challenges with Marsh Deposits in a High Seismic Risk Zone

    By M. Reza Saberi, T. Ted Miyake

    Driven piles are a common tool in any engineer’s toolbox for supporting large structures over very soft ground, especially in high seismic risk zones. Challenges include achieving sufficient vertical

    Jan 1, 2018

  • DFI
    Deep Foundation Element Supported Mat Design And Construction In An Urban Setting

    By Satyajit A. Vaidya

    This paper presents a case-study in the design and construction of deep foundation element supported mats for two residential towers on an18,000-square-foot site in Brooklyn, New York. Based on site

    Jan 1, 2010

  • DFI
    Rehabilitation of U.S. 70 Bridge over Lake Hamilton

    By Ryan P. Sullivan, G. Alan Klevens, Jian Huang

    "BACKGROUNDLake Hamilton in Hot Springs, AR was created in 1932 when the Arkansas Power and Light Co. completed Carpenter Dam on the Ouachita River to generate electricity. Today, the 7,200-acre (2,91

    Jan 1, 2007

  • DFI
    Rehabilitation of U.S. 70 Bridge over Lake Hamilton (de2c0766-552c-4812-a9ab-394a9bebc445)

    By Ryan P. Sullivan, G. Alan Klevens, Jian Huang

    "BACKGROUNDLake Hamilton in Hot Springs, AR was created in 1932 when the Arkansas Power and Light Co. completed Carpenter Dam on the Ouachita River to generate electricity. Today, the 7,200-acre (2,91

    Jan 1, 2007

  • DFI
    “Trevi-Calatore”: Innovation in Cut and Cover and Tunneling for the Installation of Plunge Columns Aimed to Excavate Underground Structures through the Top-Down Method

    By Alessandro Bertero, Manuel Toniolo, Vincenzo Tirozzi

    "The installation of foundation elements (large-diameter Bored Piles or Diaphragm Walls) for the execution of underground works to be performed through the ""Top Down"" Technique (Stations, Car Parks,

    Jan 1, 2016

  • DFI
    Experiences Of The Cast-In-Situ Pile Filling In Stone-Line Intercalation

    By Guan Jichang

    An abandened breakwater, located at the rear of No. 2 berth in Dongdu Port area of Xiamen City, was not cleaned thoroughly when the backfilling of sand started. The uncleaned stone layer was about 2 t

    Jan 1, 1991