Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
I-880 Replacement Project (Cypress Freeway) Large Diameter Driven Pipe Pile Foundations Test Program And Construction - Implementation Of Test Results - ImplementationBy Darrell L. Beddard
The test program information provided for some immediate changes on the upcoming contracts and in contract administration for the I-880 Replacement Project. Plan sheet modifications included changes t
Jan 1, 1996
-
Deepest Ever Large Diameter Pipe Pile Installation Demonstration Project New East Span San Francisco-Oakland Bay BridgeBy Saba Mohan
For the three full-scale pile installations, two different high-energy hydraulic hammers were selected for the installation. However, these hammers may not have sufficient energy to drive these large
Jan 1, 2002
-
Deep Soil Mixing Ground Improvement for the U.S. Federal Courthouse in Downtown Los Angeles, CaliforniaBy Roberto A. Lopez, Eric Lindquist, Jon Bussiere, Dean Iwasa
"The new 11-story U.S. Federal Courthouse building in downtown Los Angeles demanded a cost effective foundation system capable of attaining a strict total settlement criterion of 0.5 inches (12 mm) un
Jan 1, 2015
-
Foundation Construction Challenges At 100 11th Avenue In Manhattan - Osterberg Cell Load Test In Mica SchistBy Cem Altuntas
This paper is the second in a series of two describing the design and construction of a foundation for a major high-rise real estate development on the west side of Manhattan, N.Y. The foundation memb
Jan 1, 2008
-
Suwanee American Cement Plant, Branford, Florida: A Case Study Of Large Diameter Continuous Flight Auger Design Build FoundationsBy Gordon King
This paper presents a case study of large diameter continuous flight auger (CFA) piles and drilled shafts utilized for foundation support of a series of heavily loaded cement plant structures at the S
Jan 1, 2003
-
Large Diameter Open-End Pipe Pile Driveability Analysis Including Geotechnical Friction FatigueBy Patrick J. Hannigan, Frank Rausche, Rozbeh B. Moghaddam
Large diameter open-end pipe piles are increasingly used as deep foundations to support heavy onshore and offshore structures. During the driving process, several factors such as subsurface conditions
Jan 1, 2019
-
Selmon Expressway, Tampa: Case History of Drilled Shaft Design for Extreme VariabilityBy Ross T. McGillivray, David S. Graham, Dan A. Brown, Steven D. Dapp
"The Selmon Expressway includes an elevated structure extending across several miles of weathered karstic limestone geology, and represents a challenge for design because of the high variability of th
Jan 1, 2015
-
Drilling And Grouted Pipe Pile Foundation For Department Of Energy Spallation Neutron Source Target Building, Oak Ridge, Tennessee ? IntroductionBy Ronald E. Walkington
The U.S. Department of Energy (DOE) is building the world's newest accelerator-based, pulsed-neutron system, called Spallation Neutron Source (SNS). The facility, located in Oak Ridge, Tennessee,
Jan 1, 2001
-
Proposed Micropile Section for the 2006 IBCBy Lawrence F. Johnsen, Marc J. Gallagher
"Micropiles are small diameter, bored, grouted-in-place piles incorporating steel casing and/or reinforcements. The omission of micropiles from most United States building codes has resulted in the ap
Jan 1, 2005
-
An Enhanced P&H Tensionless Pier Foundation for Onshore Wind TurbinesBy Yazen Khasawneh, Osvaldo P. M. Vitali, Mohammad Nassim
The demand for renewable energy is growing as the conventional energy resources are becoming more limited and we are more conscious about the negative impact of conventional energy sources on the envi
Sep 8, 2021
-
Effect of Axial Compression on Lateral Pile Response: Laterally Loaded Test Pile ComparisonBy David S. Graham, Joseph D. Bailey, Paul J. Axtell, Michael K. Muchard
"Two instrumented test piles were simultaneously subjected to a static lateral load test by jacking the piles apart. One of the piles was loaded in axial compression via kentledge during the lateral l
Jan 1, 2017
-
Effective Sampling, Testing and Specification Approaches for Deep Mixing at Kitimat LNG, BCBy Randy R. Williams, Brian W. Wilson, George M. Filz, Marina S. W. Li, Donald A. Bruce
"In-situ wet grab sampling and post-installation coring of soil-cement structures are typically carried out for Quality Control (QC) and Quality Assurance (QA) of deep mixing (DM) schemes. Wet grab sa
Jan 1, 2015
-
Ground Improvement by Dynamic Replacement within Intertidal Mangrove Mud Environment, Ichthys LNG, DarwinBy J. Racinais, P. Vincent
"In September 2011, Menard Oceania (MO) was engaged by Mac Mahon John Holland Joint Venture (MJHJV) to provide ground improvement solution for the $34bn Ichthys LNG development. With close to 400,000m
Jan 1, 1900
-
Underpinning Atlanta International Airport Concourse E for APM Tunnel ExtensionBy Clinton O. Rex, Adam S. Hurley, W. Morgan NeSmith
"Hartsfield-Jackson Atlanta International Airport underwent a $1.2 billion dollar expansion project centered on the construction of the new Maynard H. Jackson International Terminal. Passenger access
Jan 1, 2017
-
Cyclic Degradation on Wind Turbine Foundations in Cohesive SoilsBy Yazen Khasawneh, Osvaldo P. M. Vitali, Mohammad Nassim
Wind turbines are subjected to complex form of cyclic loadings with variable amplitudes and frequencies. The cyclic loading and the accumulation of plastic strains with the number of cycles will resu
Sep 8, 2021
-
Understanding The Vibratory Pile Driver/Extractor: A Field Man's Perspective - 1. What Is A Vibro Driver/Extractor And How Does It Work?By John L. White
The vibro driver/extractor is a machine that grips to a pile and vibrates it up and down. When the vibrating pile is lowered into the ground, all soil around the pile begins to vibrate. A vibrating pi
Jan 1, 1990
-
Vertical Load Carrying Capacity Of Concrete Expanded Base PilesBy Mustapha Zergoun
This paper presents the results of load tests to assess the vertical load carrying capacity of concrete expanded base piles, or pressure injected footings, for various projects located near Vancouver,
Jan 1, 2004
-
Case Study: Design, Installation And Quality Assurance Testing Of High Capacity Socketed Piles In A Complex Geologic EnvironmentBy Thomas M. Caruso
Construction of a new ship dock at a major Philadelphia area refinery required geotechnical design and field consultation. The new dock, which consists of a system of mooring dolphins and platforms,
Jan 1, 2008
-
Case Histories On The Applications Of Colloidal Silica For Permeation GroutingBy Davide Grassi, Joel Joaquin Cortez, Giovanni Spagnoli, Nick Chittenden
Grouting is a technique used to improve the engineering properties of soils and rocks. Grouting techniques are classified under different criteria: injection method used, type of grout material inject
May 1, 2022
-
Eglinton Crosstown - Over and Under the Existing SubwayBy Shawna Munn, Sarah Speir
Cedarvale Station is one of 25 new Eglinton Crosstown light rail transit (ECLRT) stations along Eglinton Avenue in Toronto. It is an interchange station with the existing Toronto Transit Com- mission
Jan 1, 2023