Search Documents

Sort by

  • AUSIMM
    Blasting in Sydney Sandstone to Speed-Up Tunnelling in the Northside Storage Tunnel

    By R Williams, P Kohout, J Comins

    The Northside Storage Tunnel (NST) is the largest tunnelling project ever undertaken in Sydney. The tunnel extends deep underground from the western bank of the Lane Cove river to the North Head sewag

    Jan 1, 2001

  • CIM
    Strength development in underground high-sulphate paste backfill operation

    By F. P. Hassani, Jacque Ouellet, M. Hossein

    A laboratory investigation was undertaken to evaluate the effectiveness of different binding agents in a paste backfilling operation suitable to be used in a sulphide-rich environment. Different combi

    Jan 1, 2001

  • SME
    Control of Ground Movements Due to Tunneling with an Earth Pressure Balance TBM

    By Sakai Kunito, Nigel B. Sugden

    If an Earth Pressure Balance (EPB) TBM is operated effectively tunneling can be carried out producing negligible ground movements. Using the methods given in this paper face losses of the order of 0.5

    Jan 1, 2001

  • ISEE
    Journal: Effects of Temperature and Humidity on Airblast Sound Pressure Levels

    By Randal Martin

    Recently, questions regarding the influence of atmospheric temperature and humidity levels on airblast levels have arisen at a number of blast sites. Humidity is alleged to have contributed to high le

    Jan 1, 2001

  • SME
    Citizen Participation In Mining

    By R. A. Reiley

    Introduction Democratic countries are founded on the principle that all citizens have the right to participate in policy setting and decision-making processes. Citizen participation is especially ev

    Jan 1, 2001

  • SME
    Development Of Canadian Standards And Guidelines For Valuation Of Mineral Properties

    By W. E. Roscoe, K. N. Spence

    In the Canadian mining industry, there are at present no comprehensive regulations or standards for valuation of mineral properties. In January 1999, the Mining Standards Task Force of the Toronto St

    Jan 1, 2001

  • CIM
    Barrick Goldstrike Grinding Expert System

    By Steve Custer, Tim Kahl, Sue Parker

    "The primary objective of the Barrick Goldstrike expert system is to achieve the desired liberation size for the autoclave circuit while maximizing throughput. In addition, when downstream limitations

    Jan 1, 2001

  • SME
    Evaluation Of Ct-Based Coal Washability Analysis System Under Simulated On-Line Conditions

    By J. D. Miller, C. L. Lin

    Appropriate software and hardware necessary to adapt a x-ray CT analyzer for determination of coal washability has recently been developed and sucessfully tested for well characterized samples under l

    Jan 1, 2001

  • SME
    Us Geological Survey 1999 Resource Assessment Of Selected Coal Zones In The Northern Rocky Mountains And Great Plains Region, Wyoming, Montana, And North Dakota

    By M. S. Ellis, D. J. Nichols

    In 1999, 1,100 million short tons of coal were produced in the United States, 38 percent from the Northern Rocky Mountains and Great Plains region. This coal has low ash content, and has sulfur conten

    Jan 1, 2001

  • SME
    Selective Flotation Of Automotive Shredder Residue Plastics

    By M. A. D. Azevedo, J. D. Miller, R. Kobler, E. Mutkowska

    Up to 3 million tons of automotive shredder residue (ASR) is generated annually in United States. Plastics are the most valuable component of the ASR material making up approximately 25% of the total

    Jan 1, 2001

  • SME
    Case Study Failure Of Shallow Open Pit Slopes Shirley Basin Mine

    By R. M. Owens, J. F. Lupo

    The Shirley Basin Uranium mine, located in southeastern Wyoming, USA, was an open pit mining operation consisting of a series of several open pit mines excavated into poorly consolidated sandstones, s

    Jan 1, 2001

  • AUSIMM
    Integrated Dredging Automation

    Most mining dredges are adapted from canal/harbour dredges. Their automation and control systems are generally not designed for integrated mining operations. Consequently they have a number of limitat

    Jan 1, 2001

  • AUSIMM
    Improvements in Blast Fragmentation Using Measurement While Drilling Parameters

    An experienced drill operator is able to make a log of a drill hole defining physical properties of the earth such as hardness or structure as they vary with depth. This log is based on intuition or h

    Jan 1, 2001

  • SME
    Special Shotcrete to Improve Open-Type TBM Performance Under Difficult Conditions

    By Sohta Takatsu, Hachiroh Mizubata, Shigeki Kudoh, Kazuya Takekuni, Yoshinori Yamada

    A special type of shotcrete is used to improve the performance of open-type TBM in difficult situations. The Hakamagoshi and Johana tunnels are expressway evacuation tunnels of 3.2 km and 5.1 km in le

    Jan 1, 2001

  • SME
    Two Tunnels in Totally Different Geological Formations Driven by the Same 7M Double-Shield TBM with an Extremely Thin-Walled Monoshell Honeycomb Segmental Lining System

    By Wolfgang Guetter, Wolfgang Weber

    The upgrading project for two hydropower plants in Slovenia, Europe, requires two new pressure tunnels: Plave II (5.9 km Flysch) and Doblar II (3.6 km Limestone). It is the worldwide largest applicati

    Jan 1, 2001

  • SME
    The Use of Polyurethane Resins in Tunnel Grouting

    By Peter J. Borchardt, Helen M. K. Andersson, Donald A. Bruce

    Grouting is a useful engineering tool for tunnels throughout the world. A wide variety of methods and materials are used, reflecting the broad range of geological, hydrogeological, and structural dema

    Jan 1, 2001

  • SME
    Bench Blast Modeling Using Numerical Simulation And Mine Planning Software

    By I. R. Firth, D. L. Taylor

    The ability to accurately model the movement of grade boundaries during a typical bench blast would be of significant benefit to mine operators. The movement of grade boundaries during the blasting p

    Jan 1, 2001

  • SME
    Starter Tunnel and TBM Mining on Construction Package No. 3A MetroWest Water Supply Tunnel Project (MWWST)

    By Jeff Salai

    The CP-3A contract is the final segment of the MWWST’s 28.3 km (17.6 mile)pressurized water supply tunnel for the metropolitan Boston area. The 1,288 m (4,226 feet) of U-shaped tunnel alignment pa

    Jan 1, 2001

  • AUSIMM
    What Causes Cracks in Rock Blasting?

    By S Nie, I Bergqvist, F Ouchterlony

    In blasting, a few or many cracks are driven from the borehole into the rock. But what causes the cracks? The most common theory of breakage consists of two stages; first the shock wave causes radial

    Jan 1, 2001

  • CIM
    Geology of the Two Duck Lake Intrusion and the Marathon Cu-PGE Deposit, Coldwell Complex, Northern Ontario

    By Richard Dahl, Richard P. Taylor, David H. Watkinson

    "Abstract - Detailed mapping of the Eastern Gabbro, Coldwell Complex, Ontario, revealed that the copper and platinum-group-element deposit on the Marathon property is confined to a coarsegrained to pe

    Jan 1, 2001