Search Documents

Sort by

  • CIM
    Éléonore Project Update

    Éléonore Project Highlights Éléonoreis a multi-million ounce, high grade gold discovery in Québec Currently at the advanced exploration and engineering studies stage Excellent potential for expans

    May 1, 2007

  • CIM
    Integrated Computer Aided Open Pit Design and Planning ?A Case Study?

    By Oyku Selimoglu

    The key to successful mine production plan and subsequent operation is efficient mine layout design and optimization. Pit layout design and optimization allow the delineation and extraction of mineab

    May 1, 2007

  • CIM
    Technologie de Forage et Consommation Énergétique : Étude Comparative

    By Roger Lacroix

    L?arrivée de nouvelles technologies sur le marché des foreuses portables combinée au besoin des mines à mieux consommer l?énergie électrique ont permis d?identifier le potentiel de deux nouveaux type

    May 1, 2007

  • CIM
    Improvement in Performance of Main Ventilation Fan for Mines

    By Sib N. Mukherjee

    Main ventilation fans are used in all the mines and they run continuously 24 hours a day and 365 days in a year. Any improvement in their performance can lead to considerable power saving. The basic p

    May 1, 2007

  • CIM
    Numeric Model of a Cemented Rockfill Span Test at the Turquoise Ridge Mine, Golconda, Nevada, USA

    By D. R. Tesarik

    Researchers from the National Institute for Occupational Safety and Health (NIOSH)1 and engineers from Placer Dome, Inc.2, conducted an underground rockfill span test at the Turquoise Ridge Mine near

    May 1, 2007

  • CIM
    Mine Site Hydrogen Storage and Delivery Model

    By M. C. Bétournay

    Mine site infrastructure for storage and delivery of hydrogen must be standardized and acceptable for routine and safe industrial use before fuel cell technology is adopted as a major power source. A

    May 1, 2007

  • CIM
    Mine Planning for Ore Dilution

    By John G. Henning

    Unplanned ore dilution has a direct and large influence on the cost of a stope, and ultimately on the profitability of a mining operation. This paper presents results of a study on the influence of a

    May 1, 2007

  • CIM
    Slon Magnetic Separator: A New Approach for Recovering and Concentrating Iron Ore Fines

    By Stephen B. Hearn

    The SLon Vertical Ring and Pulsating High Gradient Magnetic Separator was developed to overcome multiple disadvantages associated with traditional horizontal type Wet High Intensity Magnetic Separator

    May 1, 2007

  • CIM
    Harnessing a Global Workforce - Best Practice from the Oil and Gas Sector Capability Development and Competence Assurance (CDCA)

    By Alyson Morley

    The mining sector in Canada is facing significant challenges to develop a competent workforce, including increased technical and logistical operational demands, and the imperative to promote local con

    May 1, 2007

  • CIM
    A Study of Cemented Crude Tailings Backfill Technology Based on Vertical Sand Silos

    A key point in the manufacture of cemented backfill is the dewatering and settlement of the total tailings product. A new technology characterized by rapid non-mechanical settlement of total tailings

    May 1, 2007

  • CIM
    Integrated Modelling of Subsidence Mechanisms and Impacts Due to Mine Caving

    By C. O?Connor

    With ever-increasing global demand for mineral resources, numerous mines are moving towards developing and mining deeper, more complex and lower grade ore bodies. In many cases, mass mining methods (e

    May 1, 2007

  • CIM
    Mine Planning Efficiency: A Quest for Improvement

    By Alan D. Curtis

    A standard planning block model for Phelps Dodge North America Operations has been developed to improve mine planning efficiency and performance in a skill starved environment. The model saves time on

    May 1, 2007

  • CIM
    Fuel Cell Aspects and Future Developments Needed for Mining

    By Marc Bétournay

    This article examines how fuel cell technology and related power distribution system fits within mine operating requirements. Considerations for improvement of power plant architecture and functions t

    May 1, 2007

  • CIM
    Experimental and Numerical Investigation of Two-Dimensional Granular Flow Through Bins

    By P. D. Barrette

    This paper deals with the flow of granular materials in bins. A hybrid Lagrangian-Eulerian numerical model is introduced. The model is based on Particle-In-Cell (PIC) advection, and continuum equation

    May 1, 2007

  • CIM
    Slag Formation in Iron Ore Pellets During Induration: The Internal Zone Versus the External Zone of the Pellets

    By Marie-Eve Boucher

    The slag in iron ore pellets allows wet sintering during firing and leads to suitable bounding. The process of slag formation differs whether it takes place in the core or in the external zone of a p

    May 1, 2007

  • CIM
    Yield Stress Measurement of Cemented Paste Backfill with the Vane Method and Slump Tests

    By A. S. Moghaddam

    The transportation of cemented and non-cemented mine tailings in the form of paste through pipelines is one of the main stages of paste backfill operations. For the purpose of pipeline design, the rhe

    May 1, 2007

  • CIM
    Paste Backfill Responses in Deep Mine Temperature Conditions

    By M. Fall

    The progressive depletion of ore available at shallow depths in several underground mines around the world means that underground mining operations would increasingly be carried out at greater depths

    May 1, 2007

  • CIM
    An Overview of the Mary River Iron Ore Project

    By Rodney A. Cooper

    The Mary River iron ore deposits were discovered in the 1960?s. The high quality of the deposits was immediately evident, and drilling programs were successful in defining a resource adequate for supp

    May 1, 2007

  • CIM
    Hydraulic Calculation of Gravity Transportation pipeline System of Cemented Coal Gangue Backfilling in Suncun Coal Mine, China

    By Q. Zhang

    The necessary capability of the gravity transportation pipeline system for cemented coal gangue backfilling at the Suncun Coal Mine, China, is about 74.4 m3?h-1 according to mining production and work

    May 1, 2007

  • CIM
    The Relevance and Role of Contractors in Mining Business Improvement through Energy Management for Sustainability

    By Tom Cooney

    A small number of mining contractors worldwide have evolved their businesses to be able to provide a ?total service solution? to their clients. Thiess, an Australian-based international mining servic

    May 1, 2007